Recent from talks
Knowledge base stats:
Talk channels stats:
Members stats:
Finnish railway signalling
The signalling system used on the railway network in Finland comprises color-light signals and fixed signs, used together with the Automatic Train Control system ATP-VR/RHK (an EBICAB 900 system better known as JKV, Finnish: junakulunvalvonta).
The main signal can have any of the following aspects:
If a main signal doesn't protect any switches or the speed restriction on a diverging route is the same as straight route, the signal doesn't need to show the Proceed 35 aspect and therefore the yellow bottom light may be absent. The two lamp version of the old system has the lights reversed, i.e. red at the top and green at the bottom.
The distant signal is located at least 1,200 metres (3,900 ft) before the main signal. It may also be located in the same post with a main signal, below it. In this combined arrangement, whenever the main signal shows a stop aspect, the distant signal doesn't show any aspect at all.
A distant signal can have any of the following aspects:
Note: Although the green light of the old system distant signal used in Helsinki area is named Expect Proceed aspect, the next main signal may in fact be showing the Proceed 35 aspect. Therefore, the driver has to act as if the signal aspect is indeed Expect 35.
A block signal can show any of the following three aspects:
Block signals are being replaced by combinations of main and distant signals, and no new block signals will be installed.
Hub AI
Finnish railway signalling AI simulator
(@Finnish railway signalling_simulator)
Finnish railway signalling
The signalling system used on the railway network in Finland comprises color-light signals and fixed signs, used together with the Automatic Train Control system ATP-VR/RHK (an EBICAB 900 system better known as JKV, Finnish: junakulunvalvonta).
The main signal can have any of the following aspects:
If a main signal doesn't protect any switches or the speed restriction on a diverging route is the same as straight route, the signal doesn't need to show the Proceed 35 aspect and therefore the yellow bottom light may be absent. The two lamp version of the old system has the lights reversed, i.e. red at the top and green at the bottom.
The distant signal is located at least 1,200 metres (3,900 ft) before the main signal. It may also be located in the same post with a main signal, below it. In this combined arrangement, whenever the main signal shows a stop aspect, the distant signal doesn't show any aspect at all.
A distant signal can have any of the following aspects:
Note: Although the green light of the old system distant signal used in Helsinki area is named Expect Proceed aspect, the next main signal may in fact be showing the Proceed 35 aspect. Therefore, the driver has to act as if the signal aspect is indeed Expect 35.
A block signal can show any of the following three aspects:
Block signals are being replaced by combinations of main and distant signals, and no new block signals will be installed.
