The Leppington & Inner West Line (numbered T2, coloured light blue) is a commuter rail service operated by Sydney Trains, serving the inner west and south-western suburbs of Sydney, Australia. The service commences from the City Circle, heading west to Granville where the line branches; services either head northwest to Parramatta or south to Leppington. A third terminus at Homebush is also used when the part-time Parramatta branch is not operating.

In March 2025, the federal minister for infrastructure, transport, regional development and local government Catherine King announced that a business case for upgrading the T2 Leppington & Inner West Line would be developed.

Branch to Leppington added (December 2015 to November 2017)

Following the 2011 state election, the newly elected O'Farrell government embarked on reform of transport in New South Wales, creating a new organisation, Transport for NSW, in November of that year. This was followed up with another government reform, which saw Sydney Trains take over operation of the Sydney suburban rail network from CityRail in July 2013.

Transport for NSW developed a new rail timetable and branding, which was put into effect on 20 October 2013. This saw three former CityRail services, the Airport & East Hills Line (Macarthur - City Circle via Sydney Airport or Sydenham), the Inner West Line (Liverpool or Bankstown - City Circle via Regents Park) and the South Line (Campbelltown - City Circle via Granville), merged to form the Airport, Inner West & South Line. A new numbering system was also introduced and the new line was given the number T2.

The 2013 timetable was designed to integrate the projects of the Rail Clearways Program, a 2004 plan to divide the network's fourteen metropolitan rail lines into five independent "clearways" by installing extra tracks, passing loops, turnouts and turnbacks at pinch points around the network, such as at Homebush and Lidcombe. By 2013, the Rail Clearways Program was substantially complete. At the same time, the delivery of 78 new Waratah trains was almost complete as well.

A branch of the service along the South West railway line to Leppington commenced operating on 13 December 2015, following the new rail link's completion earlier that year. T2 services replaced an earlier temporary shuttle service between Leppington and Liverpool.

A new Sydney Trains timetable was introduced on 26 November 2017, in which the original T2 services were split in two. Existing services from Leppington to the City Circle via Granville, alongside newly extended all stops services from Parramatta that had previously terminated at Homebush, were rebranded as the T2 Inner West & Leppington Line. This reduced T2 was recoloured light blue, harkening back to CityRail's historical colour scheme for services along this route.