Datunludong station[3] (simplified Chinese: 大屯路东站; traditional Chinese: 大屯路東站; pinyin: Dàtúnlù Dōng Zhàn) is an interchange station of Line 5 and Line 15 on the Beijing Subway.
The line 5 station opened on October 27, 2007. It was too small to handle the interchange between line 5 and 15, so the line 15 station was left unopened when the western extension was opened in December 2014. From October to December 2015, the line 5 station was closed to widen the station and build a transfer corridor.[4] The line 15 station opened on December 26, 2015,[5] one year later than the other stations on the line.
The line 5 station has 2 elevated side platforms. The line 15 station has an underground island platform.
There are 5 exits in operation, lettered A1, B1, B2, G, and H2. Exits A1, B1 and G are accessible.
Exit H1 is under planning.
立水桥站、立水桥南站、北苑西站、大屯东站、惠新西桥站、北土城东路站、和平西桥站
general
This is the start of the #general chat. #general is a chat channel to discuss anything related to the hub.