CPR-1000
The CPR-1000, or CPR1000 (Chinese PWR) is a Generation II+ pressurized water reactor, based on the French 900 MWe three cooling loop design (M310) imported in the 1980s, improved to have a slightly increased net power output of 1,000 MWe (1080 MWe gross) and a 60-year design life.
The CPR-1000 is built and operated by the China General Nuclear Power Group (CGNPG), formerly known as China Guangdong Nuclear Power. Progressively more Chinese manufactured components were used in the units; the second unit built had 70% of its equipment manufactured in China, with a 90% Chinese content target for later builds.
On 15 July 2010, China's first CPR-1000 nuclear power plant, Ling Ao-3, was connected to the grid, having started criticality testing on 11 June 2010. It started commercial operations on 27 September 2010, with Ling Ao-4 starting commercial operation on 7 August 2011.
18 CPR-1000 reactors have been built as of December 2019. Besides Ling Ao unit 3 & 4, the CPR-1000 reactor has been realised in Fangchenggang (unit 1 & 2), Fangjiashan (unit 1 & 2), Hongyanhe (unit 1–4), Ningde (unit 1–4), Yangjiang (unit 1–4).
On the basis of the M310, CGN developed an improved Generation II pressurized water reactor called CPR-1000. CPR-1000 takes a large proportion in all the reactors being built in China. The M310 uses as its base design units 5 & 6 of the Gravelines Nuclear Power Station in France.
The CPR-1000 has a 1086 MWe capacity, a three-loop design and 157 fuel assemblies (active length 12 ft), enriched to 4.5% U-235. The fuel assembly design is AREVA's 17x17 AFA 3G M5, which can be fabricated in China. Other features include has a design life that could extend beyond 40 years and an 18-month fuel cycle. It has a digital instrumentation and control system, and is equipped with hydrogen recombiners and containment spray pumps.
The original M310 reactors at Daya Bay and Ling Ao Phase 1 are sometimes also called CPR-1000s, but these are closely based on the French 900 MWe design (M310), with net power output below 1,000 MWe, and using mostly imported components.
Some CPR-1000 intellectual property rights are retained by Areva, which limits overseas sales potential. However the Financial Times reported in 2010 that Areva was considering marketing the CPR-1000 as a smaller and simpler second-generation reactor design alongside its larger EPR, for countries that are new to nuclear power. In January 2012, CGNPG agreed a partnership with Areva and EDF to develop a reactor based on the CPR-1000, which may create a design converged with Mitsubishi and Areva's 1000 MWe Atmea reactor.
CPR-1000
The CPR-1000, or CPR1000 (Chinese PWR) is a Generation II+ pressurized water reactor, based on the French 900 MWe three cooling loop design (M310) imported in the 1980s, improved to have a slightly increased net power output of 1,000 MWe (1080 MWe gross) and a 60-year design life.
The CPR-1000 is built and operated by the China General Nuclear Power Group (CGNPG), formerly known as China Guangdong Nuclear Power. Progressively more Chinese manufactured components were used in the units; the second unit built had 70% of its equipment manufactured in China, with a 90% Chinese content target for later builds.
On 15 July 2010, China's first CPR-1000 nuclear power plant, Ling Ao-3, was connected to the grid, having started criticality testing on 11 June 2010. It started commercial operations on 27 September 2010, with Ling Ao-4 starting commercial operation on 7 August 2011.
18 CPR-1000 reactors have been built as of December 2019. Besides Ling Ao unit 3 & 4, the CPR-1000 reactor has been realised in Fangchenggang (unit 1 & 2), Fangjiashan (unit 1 & 2), Hongyanhe (unit 1–4), Ningde (unit 1–4), Yangjiang (unit 1–4).
On the basis of the M310, CGN developed an improved Generation II pressurized water reactor called CPR-1000. CPR-1000 takes a large proportion in all the reactors being built in China. The M310 uses as its base design units 5 & 6 of the Gravelines Nuclear Power Station in France.
The CPR-1000 has a 1086 MWe capacity, a three-loop design and 157 fuel assemblies (active length 12 ft), enriched to 4.5% U-235. The fuel assembly design is AREVA's 17x17 AFA 3G M5, which can be fabricated in China. Other features include has a design life that could extend beyond 40 years and an 18-month fuel cycle. It has a digital instrumentation and control system, and is equipped with hydrogen recombiners and containment spray pumps.
The original M310 reactors at Daya Bay and Ling Ao Phase 1 are sometimes also called CPR-1000s, but these are closely based on the French 900 MWe design (M310), with net power output below 1,000 MWe, and using mostly imported components.
Some CPR-1000 intellectual property rights are retained by Areva, which limits overseas sales potential. However the Financial Times reported in 2010 that Areva was considering marketing the CPR-1000 as a smaller and simpler second-generation reactor design alongside its larger EPR, for countries that are new to nuclear power. In January 2012, CGNPG agreed a partnership with Areva and EDF to develop a reactor based on the CPR-1000, which may create a design converged with Mitsubishi and Areva's 1000 MWe Atmea reactor.