Docklands Stadium, known by naming rights sponsorship as Marvel Stadium, is a multi-purpose sports and entertainment stadium in the suburb of Docklands in Melbourne, Victoria, Australia. Construction started in October 1997 and was completed in 2000 at a cost of A$460 million ($930 million in 2023 terms). The stadium features a retractable roof and the ground level seating can be converted from oval to rectangular configuration.
The stadium is primarily used for Australian rules football and was originally built as a replacement for Waverley Park. Offices at the precinct serve as the headquarters of the Australian Football League (AFL) which, since October 2016, has had exclusive ownership of the venue. With a capacity for over 53,000 spectators for sports, it is the second-largest stadium in Melbourne after the Melbourne Cricket Ground. It has hosted a number of other sporting events—including domestic Twenty20 cricket matches, Melbourne Victory soccer home matches, rugby league and rugby union matches, as well as special events and concerts.
Plans for the stadium were announced in October 1996 as a more centrally located replacement for the much larger but ageing Waverley Park as a headquarters for the Australian Football League. It was built in the Melbourne Docklands to the immediate west of the CBD, a central but largely deserted industrial area which had just begun its own urban renewal project. Construction of the stadium by Baulderstone began in October 1997 under the working name "Victoria Stadium", and was completed ahead of the 2000 AFL season. The stadium was originally developed by the Docklands Stadium Consortium and thereafter controlled by the Seven Network. The remaining leasehold interest in the stadium was sold to James Fielding Funds Management in June 2006 for A$330 million.
The stadium, like Waverley Park, was built primarily for Australian rules football, unlike most grounds of a similar size in Australia which were originally designed for cricket then later developed for football. It was the first Australian rules football stadium built with a retractable roof, which throughout its history has usually been closed for night matches and for wet weather day matches; the roof closure policy for dry weather day matches has varied. It was the first stadium in Australia to have movable seating. All four level-one tiers of the stadium can be moved up to 18 metres forward into a rectangular configuration. Despite this being a key feature of the stadium design, it has rarely been used, due to damage to turf, time to deploy the seats, and a reduced capacity, since the corner bays of the stadium become unavailable in rectangular configuration.
Construction was finished only weeks before the first match, and some scheduled pre-season matches were relocated as a result. The first match to be played at the ground was between Essendon and Port Adelaide, before a crowd of 43,012, on 9 March 2000. Essendon won the match by 94 points, and Michael Long kicked the first goal at the ground. The game was to have been played under the closed roof, but due to technical issues it remained open. Six days later, Barbra Streisand staged the venue's first concert. The stadium's third football game, between Western Bulldogs and Brisbane Lions on 19 March, was the first to be played under the roof. On 16 August 2000, the world's first indoor One Day International was held at the venue between Australia and South Africa. The first game played in the rectangular configuration was a Melbourne Storm game in July 2001. The first soccer match played was in round 5 2001 of the National Soccer League between South Melbourne FC and Melbourne Knights FC.
From the beginning, the stadium's playing surface was criticised for its slipperiness, hardness and lack of grass coverage, and the increased risk of injury that this causes to players. Maintaining surface quality remains one of the stadium's biggest challenges. The stadium's orientation and highly built-up grandstands mean that the Northern end of the stadium in particular receives only 6 weeks of sunlight a year. Concerts held at the stadium are also usually placed at the Southern end due to the ability for grass to recover more quickly. The entire surface undergoes regular, expensive replacement during the season with turf grown externally, under contract by HG Turf, whereas the responsibility of laying and managing the turf lies with Docklands Stadium management. Since 2007, elaborate heating and lighting to better allow grass to be grown and managed within the stadium have been in use.
The venue was damaged by a thunderstorm in March 2010 during the 2010 Victorian storms. The external roof at Gate 2 caved in, causing damage and flooding inside the entertainment area. That evening's pre-season match between St Kilda and Fremantle was delayed due to WorkSafe inspections, but it still went ahead before a small crowd of 5,000.
In 2015, LED electronic advertising was added around the perimeter of the ground on level 1 and 2, as well as a strip synthetic turf around the edge of the fence, outside the boundary line. The synthetic strip was narrowed after Brisbane Lions player Michael Close suffered a season ending ACL injury on the uneven surface during a game in 2015.
Hub AI
Docklands Stadium AI simulator
(@Docklands Stadium_simulator)
Docklands Stadium
Docklands Stadium, known by naming rights sponsorship as Marvel Stadium, is a multi-purpose sports and entertainment stadium in the suburb of Docklands in Melbourne, Victoria, Australia. Construction started in October 1997 and was completed in 2000 at a cost of A$460 million ($930 million in 2023 terms). The stadium features a retractable roof and the ground level seating can be converted from oval to rectangular configuration.
The stadium is primarily used for Australian rules football and was originally built as a replacement for Waverley Park. Offices at the precinct serve as the headquarters of the Australian Football League (AFL) which, since October 2016, has had exclusive ownership of the venue. With a capacity for over 53,000 spectators for sports, it is the second-largest stadium in Melbourne after the Melbourne Cricket Ground. It has hosted a number of other sporting events—including domestic Twenty20 cricket matches, Melbourne Victory soccer home matches, rugby league and rugby union matches, as well as special events and concerts.
Plans for the stadium were announced in October 1996 as a more centrally located replacement for the much larger but ageing Waverley Park as a headquarters for the Australian Football League. It was built in the Melbourne Docklands to the immediate west of the CBD, a central but largely deserted industrial area which had just begun its own urban renewal project. Construction of the stadium by Baulderstone began in October 1997 under the working name "Victoria Stadium", and was completed ahead of the 2000 AFL season. The stadium was originally developed by the Docklands Stadium Consortium and thereafter controlled by the Seven Network. The remaining leasehold interest in the stadium was sold to James Fielding Funds Management in June 2006 for A$330 million.
The stadium, like Waverley Park, was built primarily for Australian rules football, unlike most grounds of a similar size in Australia which were originally designed for cricket then later developed for football. It was the first Australian rules football stadium built with a retractable roof, which throughout its history has usually been closed for night matches and for wet weather day matches; the roof closure policy for dry weather day matches has varied. It was the first stadium in Australia to have movable seating. All four level-one tiers of the stadium can be moved up to 18 metres forward into a rectangular configuration. Despite this being a key feature of the stadium design, it has rarely been used, due to damage to turf, time to deploy the seats, and a reduced capacity, since the corner bays of the stadium become unavailable in rectangular configuration.
Construction was finished only weeks before the first match, and some scheduled pre-season matches were relocated as a result. The first match to be played at the ground was between Essendon and Port Adelaide, before a crowd of 43,012, on 9 March 2000. Essendon won the match by 94 points, and Michael Long kicked the first goal at the ground. The game was to have been played under the closed roof, but due to technical issues it remained open. Six days later, Barbra Streisand staged the venue's first concert. The stadium's third football game, between Western Bulldogs and Brisbane Lions on 19 March, was the first to be played under the roof. On 16 August 2000, the world's first indoor One Day International was held at the venue between Australia and South Africa. The first game played in the rectangular configuration was a Melbourne Storm game in July 2001. The first soccer match played was in round 5 2001 of the National Soccer League between South Melbourne FC and Melbourne Knights FC.
From the beginning, the stadium's playing surface was criticised for its slipperiness, hardness and lack of grass coverage, and the increased risk of injury that this causes to players. Maintaining surface quality remains one of the stadium's biggest challenges. The stadium's orientation and highly built-up grandstands mean that the Northern end of the stadium in particular receives only 6 weeks of sunlight a year. Concerts held at the stadium are also usually placed at the Southern end due to the ability for grass to recover more quickly. The entire surface undergoes regular, expensive replacement during the season with turf grown externally, under contract by HG Turf, whereas the responsibility of laying and managing the turf lies with Docklands Stadium management. Since 2007, elaborate heating and lighting to better allow grass to be grown and managed within the stadium have been in use.
The venue was damaged by a thunderstorm in March 2010 during the 2010 Victorian storms. The external roof at Gate 2 caved in, causing damage and flooding inside the entertainment area. That evening's pre-season match between St Kilda and Fremantle was delayed due to WorkSafe inspections, but it still went ahead before a small crowd of 5,000.
In 2015, LED electronic advertising was added around the perimeter of the ground on level 1 and 2, as well as a strip synthetic turf around the edge of the fence, outside the boundary line. The synthetic strip was narrowed after Brisbane Lions player Michael Close suffered a season ending ACL injury on the uneven surface during a game in 2015.