Garden Reach Shipbuilders & Engineers Ltd, abbreviated as GRSE, is an Indian defence shipyard, located in Kolkata. It builds and repairs commercial and naval vessels. GRSE also exports the ships that the company builds.

Founded in 1884 as a small privately owned company on the eastern bank of the Hooghly River, it was renamed as Garden Reach Workshop in 1916. GRSE was nationalised by the Government of India in 1960. The company was awarded the Miniratna public sector undertaking status, with accompanying financial and operational autonomy in September 2006. GRSE is the first Indian shipyard to build 100 warships.

GRSE has ship building facilities in Kolkata and a diesel engine plant in Ranchi.

It has a large computer-aided design (CAD) centre for ship modelling and design. There are four workshops for plate preparation and steel fabrication.

GRSE has a dry dock for ships up to 26,000 tonnes deadweight (DWT). It has a building berth and two slipways for hull construction. It has a covered all-weather non-tidal wet basin for fitting-out medium and small ships and another fitting-out complex for ships with three berths alongside. In addition, it has two river jetties for berthing smaller vessels up to 60 metres (200 ft) in length. GRSE has engine assemble, test, repair and overhaul facilities in Ranchi, which acquires 62 acres of land.

GRSE and Syama Prasad Mookerjee Port, Kolkata (SMPK) have inked a long-term concession agreement for GRSE to operate 3 dry docks. Here, GRSE undertakes multiple dry dock repairs of ships up to 160 m length, 20 m beam, and 7 m draught. These docks are situated inside a wet basin, which allows for docking and undocking operations independent of river tidal requirements. The wet basin also has multiple berthing facilities for afloat maintenance and refit operations.

On 1 July 2006, GRSE acquired the loss-making Rajabagan Dockyard (RBD) of Central Inland Water Transport Corporation (CIWTC). RBD's facilities with its 600 metres (2,000 ft) waterfront helped alleviate some of GRSE's space constraints and increase its production capacity.

As of 2011, the shipyard was undergoing a 530 crore (US$63 million) upgrade programme, expected to be completed by March 2012. The second phase of the upgrade programme was scheduled to commence from June 2013.