Hubbry Logo
logo
Hankyu Kyoto Main Line
Community hub

Hankyu Kyoto Main Line

logo
0 subscribers
Be the first to start a discussion here.
Be the first to start a discussion here.
Contribute something to knowledge base
Hub AI

Hankyu Kyoto Main Line AI simulator

(@Hankyu Kyoto Main Line_simulator)

Hankyu Kyoto Main Line

The Hankyu Kyoto Main Line (阪急京都本線, Hankyū Kyōto Honsen) is a railway line in Japan operated by the private railway operator Hankyu Railway. It connects Osaka-umeda Station in Osaka and Kyoto-kawaramachi Station in Kyoto.

The Kyoto Main Line is often called the Kyoto Line (京都線, Kyōto-sen) for short, and in a broader sense its two branch lines, the Senri Line and the Arashiyama Line, are included to the Kyoto Line by historical, geographical and structural reasons. The other two sections of Hankyu, the Kobe Line and the Takarazuka Line are called the Shinpōsen (神宝線) as a whole.

Officially, the Kyoto Main Line is from Jūsō to Kyoto-kawaramachi, however, all trains run beyond Jūsō to Osaka-umeda terminal, using the eastern tracks of the section exclusively. Hankyu treats the Kyoto Main Line in the same way as the passengers do, i.e. as the line between Osaka-umeda and Kyoto-kawaramachi (except for special circumstances such as governmental procedures).

The Kyoto Main Line was constructed in the following phases:

Prior to the merger of Hankyu Railway (then Hanshin Kyūkō Railway) and Keihan Electric Railway in 1943, the line and its branches were owned by the latter and called the Shin-Keihan (New Keihan) Line. In the breakup of the merger in 1949, the line was not ceded to Keihan and became a competitor of the Keihan Main Line.

Construction has been in progress since 2012 to elevate a 3.3 km (2.1 mi) section of track from Sōzenji Station to Kami-Shinjō Station including the junction with the Senri Line at Awaji Station. Originally projected for a 2020 completion, various delays have pushed back the start of operations on the new tracks to 2031.

Station numbering was introduced to all Hankyu stations on 21 December 2013.

A loop line from Juso to Awaji via Shin-Osaka Station, to provide a direct connection to the Shinkansen has been proposed, but is not currently scheduled for construction.

See all
railway line in Japan
User Avatar
No comments yet.