Kajang line
The MRT Kajang Line, previously known as the MRT Sungai Buloh–Kajang Line, is a Mass Rapid Transit (MRT) line servicing the Klang Valley, Malaysia. It is the second fully automated and driverless rail system in the Klang Valley region after the LRT Kelana Jaya Line. Owned by MRT Corp and operated as part of the Rapid KL system by Rapid Rail, it forms part of the Klang Valley Integrated Transit System. The line is numbered 9 and coloured green on official transit maps.
It is one of three planned MRT rail lines under the Klang Valley Mass Rapid Transit Project by MRT Corp. Phase 1 operations between Sungai Buloh and Semantan commenced service on 16 December 2016. Phase 2 operations between Muzium Negara and Kajang was opened on 17 July 2017, as a free shuttle service, by former Malaysian Prime Minister, Dato' Seri Najib Tun Razak in a ceremony at the Tun Razak Exchange station. Full revenue service between Sungai Buloh and Kajang began the following day.
In August 2006, the LRT Kota Damansara–Cheras line proposal was first made known to the public by the then Deputy Prime Minister Datuk Seri Najib Tun Razak under a RM10 billion government allocation for the improvement and expansion of the public transportation network in the Klang Valley as a new light rapid transit (LRT) system. The line is also targeted to alleviate traffic congestion in the Klang Valley by encouraging more commuters to opt for public transport. It is also aimed to reduce overcrowding on the KL Monorail and to provide an alternative transport mode due to rising fuel prices. It is estimated to be approximately 30 km (19 mi) in length. This is planned in-line with the extension of the LRT Kelana Jaya Line and the LRT Sri Petaling Line, to Subang Jaya and Puchong respectively and converging at Putra Heights. The combined cost of the new line and the proposed extensions were estimated at RM7 billion. Syarikat Prasarana Nasional Berhad (SPNB) was in charge of the construction of these lines. The line was planned to be served by 140 coaches, and the track gauge to be almost similar to existing LRT lines. The Ministry of Transport had approved the alignment of the new line in July 2007 which would then be tabled to the Cabinet for approval. The Finance Ministry's Parliamentary Secretary announced that the line from Kota Damansara to Cheras and Balakong would be completed by 2012. The line would be 40 km (25 mi) long, serving densely populated areas in Damansara and Cheras via "The Golden Triangle" of Kuala Lumpur city. The alignment was to be from Persiaran Surian to the Balakong Interchange on the Cheras-Kajang Expressway, passing through the Damansara-Puchong Expressway (LDP), Sprint Highway, the city, Jalan Tun Razak and Jalan Cheras, stopping at around 30 stations. Ownership of the line belonged to SPNB, and would be operated by Rapid Rail. The estimated construction cost is between RM4 billion and RM5 billion.
In September 2008, Executive Director of SPNB said that a 5.9 km (3.7 mi) section of the line in central Kuala Lumpur will be underground, serving 5 stations. [citation needed] However, the locations of underground stations were not announced. It was during this time that the line was said to be 42 km (26 mi) with 32 stations in total, which would serve areas of Bandar Utama, Bangsar, KL Sentral, Bukit Bintang, Bandar Tasik Selatan and Cheras. The line was being considered for as a Mass Rapid Transit (MRT) system after taking into consideration the catchment area serving a population of 878,000. It was also reported that the detailed design stage for the line would commence in the second quarter of 2009 and the opening date is expected to be in 2014.
On 14 September 2009, SPNB managing director Datuk Idrose Mohamed was reported as saying that the new line could end up longer than the earlier announced alignment although he did not offer any further details. A public display of the alignment was launched a day after the announcement. SPNB has raised the necessary funds from Islamic investments of RM2 billion and hopes to gain approval from the Ministry of Transport to call out for tenders. In April 2010, a proposal to extend the line by 16 km (9.9 mi) was being studied by the government. The proposal includes extensions from Kota Damansara to Sungai Buloh (additional 3 km (1.9 mi)) and from Cheras to Kajang (additional 9 km (5.6 mi)). This is to provide convenient interchanges to the existing Keretapi Tanah Melayu (KTM) stations at Sungai Buloh and Kajang, as well as supporting the upcoming development of some 3,000-acre (1,200 ha) land in Sungai Buloh. An additional branch line from Damansara Utama to Kelana Jaya (additional 4 km (2.5 mi)) aimed to relieve congestion on the LDP Highway was also being studied, bringing the total length of the line to 59 km (37 mi).
Unofficial statements in 2009 claimed that the proposed line was changed to an MRT line. In June 2010, during the tabling of the 10th Malaysia Plan, Prime Minister Najib Tun Razak announced that the government was now considering a RM36 billion Klang Valley MRT proposal from Gamuda Berhad and MMC Corporation Berhad, which is the largest national infrastructure project. The proposal includes 3 lines, including one which is similar to the Kota Damansara—Cheras proposal. The MRT lines were to be mostly underground with stations 500 m (1,600 ft) to 1 km (3,300 ft) apart in areas with high demand. The concept was envisioned to be inspired by Singapore's Mass Rapid Transit (MRT) system. The project, aimed to improve public transport in the Klang Valley, was approved by the Malaysian cabinet on 16 December 2010 and construction of the first line from Sungai Buloh to Kajang would begin in July 2011 with a duration of five to six years. Gross national income from these future lines is between RM3 bil and RM12 bil. [citation needed] The government had appointed MMC-Gamuda JV Sdn Bhd as Project Delivery Partner where it would play the role project manager, supervised by the Land Public Transport Commission (SPAD). The whole project would be divided into nine parcels in which will be done on open tender basis. 10 km (6.2 mi) of the line would be underground and the remaining 50 km (31 mi) above ground with 35 new stations. MMC-Gamuda would be barred from bidding for any tender except for tunnelling works (the most expensive portion). Ownership of the lines would be given to SPNB.
To seek for further consultation from the public, SPAD held a 3-month public display of the alignment of the MRT Kajang Line. On 8 July 2011, Najib officially launched the project. The final alignment was adjusted following the public display, having a length of 51 km (32 mi) with 31 stations where 16 have Park and Ride facilities. Construction was said to be completed in December 2016 and the line would start operations a month after. On 17 August 2011, the government announced that Mass Rapid Transit Corporation Sdn Bhd (MRT Corp), a new company under the Finance Ministry had been formed to take control of the project from Prasarana. MRT Corp would be the asset owner of the project and officially take over the project from Prasarana on 1 September 2011. After the MRT project was formally launched on 8 July 2011, the following amendments have been made to the original proposed alignment following the public display exercise between March and May 2011:
On 21 October 2011, MRT Corp shortlisted 5 companies to construct the underground parts of the line including MMC Gamuda Joint Venture and Sinohydro Group. On 26 January 2012, MRT Corp announced the award of the first two civil works contracts for the construction of the MRT Kajang line. IJM Construction Sdn Bhd was appointed the contractor for Package V5 at a tender price of RM974 million, while Ahmad Zaki Sdn Bhd was appointed the contractor for Package V6 at a tender price of RM764 million. Package V5 is from the Maluri portal to Plaza Phoenix (now Taman Connaught) station while Package V6 covers the section between Plaza Phoenix and Bandar Tun Hussein Onn stations. MRT Corp announced the pre-qualification of 28 companies to bid for six System Works Packages for the MRT line on 8 March 2012. Subsequently, in September 2012, another 31 companies were pre-qualified to bid for the remaining five System Works Packages.
Hub AI
Kajang line AI simulator
(@Kajang line_simulator)
Kajang line
The MRT Kajang Line, previously known as the MRT Sungai Buloh–Kajang Line, is a Mass Rapid Transit (MRT) line servicing the Klang Valley, Malaysia. It is the second fully automated and driverless rail system in the Klang Valley region after the LRT Kelana Jaya Line. Owned by MRT Corp and operated as part of the Rapid KL system by Rapid Rail, it forms part of the Klang Valley Integrated Transit System. The line is numbered 9 and coloured green on official transit maps.
It is one of three planned MRT rail lines under the Klang Valley Mass Rapid Transit Project by MRT Corp. Phase 1 operations between Sungai Buloh and Semantan commenced service on 16 December 2016. Phase 2 operations between Muzium Negara and Kajang was opened on 17 July 2017, as a free shuttle service, by former Malaysian Prime Minister, Dato' Seri Najib Tun Razak in a ceremony at the Tun Razak Exchange station. Full revenue service between Sungai Buloh and Kajang began the following day.
In August 2006, the LRT Kota Damansara–Cheras line proposal was first made known to the public by the then Deputy Prime Minister Datuk Seri Najib Tun Razak under a RM10 billion government allocation for the improvement and expansion of the public transportation network in the Klang Valley as a new light rapid transit (LRT) system. The line is also targeted to alleviate traffic congestion in the Klang Valley by encouraging more commuters to opt for public transport. It is also aimed to reduce overcrowding on the KL Monorail and to provide an alternative transport mode due to rising fuel prices. It is estimated to be approximately 30 km (19 mi) in length. This is planned in-line with the extension of the LRT Kelana Jaya Line and the LRT Sri Petaling Line, to Subang Jaya and Puchong respectively and converging at Putra Heights. The combined cost of the new line and the proposed extensions were estimated at RM7 billion. Syarikat Prasarana Nasional Berhad (SPNB) was in charge of the construction of these lines. The line was planned to be served by 140 coaches, and the track gauge to be almost similar to existing LRT lines. The Ministry of Transport had approved the alignment of the new line in July 2007 which would then be tabled to the Cabinet for approval. The Finance Ministry's Parliamentary Secretary announced that the line from Kota Damansara to Cheras and Balakong would be completed by 2012. The line would be 40 km (25 mi) long, serving densely populated areas in Damansara and Cheras via "The Golden Triangle" of Kuala Lumpur city. The alignment was to be from Persiaran Surian to the Balakong Interchange on the Cheras-Kajang Expressway, passing through the Damansara-Puchong Expressway (LDP), Sprint Highway, the city, Jalan Tun Razak and Jalan Cheras, stopping at around 30 stations. Ownership of the line belonged to SPNB, and would be operated by Rapid Rail. The estimated construction cost is between RM4 billion and RM5 billion.
In September 2008, Executive Director of SPNB said that a 5.9 km (3.7 mi) section of the line in central Kuala Lumpur will be underground, serving 5 stations. [citation needed] However, the locations of underground stations were not announced. It was during this time that the line was said to be 42 km (26 mi) with 32 stations in total, which would serve areas of Bandar Utama, Bangsar, KL Sentral, Bukit Bintang, Bandar Tasik Selatan and Cheras. The line was being considered for as a Mass Rapid Transit (MRT) system after taking into consideration the catchment area serving a population of 878,000. It was also reported that the detailed design stage for the line would commence in the second quarter of 2009 and the opening date is expected to be in 2014.
On 14 September 2009, SPNB managing director Datuk Idrose Mohamed was reported as saying that the new line could end up longer than the earlier announced alignment although he did not offer any further details. A public display of the alignment was launched a day after the announcement. SPNB has raised the necessary funds from Islamic investments of RM2 billion and hopes to gain approval from the Ministry of Transport to call out for tenders. In April 2010, a proposal to extend the line by 16 km (9.9 mi) was being studied by the government. The proposal includes extensions from Kota Damansara to Sungai Buloh (additional 3 km (1.9 mi)) and from Cheras to Kajang (additional 9 km (5.6 mi)). This is to provide convenient interchanges to the existing Keretapi Tanah Melayu (KTM) stations at Sungai Buloh and Kajang, as well as supporting the upcoming development of some 3,000-acre (1,200 ha) land in Sungai Buloh. An additional branch line from Damansara Utama to Kelana Jaya (additional 4 km (2.5 mi)) aimed to relieve congestion on the LDP Highway was also being studied, bringing the total length of the line to 59 km (37 mi).
Unofficial statements in 2009 claimed that the proposed line was changed to an MRT line. In June 2010, during the tabling of the 10th Malaysia Plan, Prime Minister Najib Tun Razak announced that the government was now considering a RM36 billion Klang Valley MRT proposal from Gamuda Berhad and MMC Corporation Berhad, which is the largest national infrastructure project. The proposal includes 3 lines, including one which is similar to the Kota Damansara—Cheras proposal. The MRT lines were to be mostly underground with stations 500 m (1,600 ft) to 1 km (3,300 ft) apart in areas with high demand. The concept was envisioned to be inspired by Singapore's Mass Rapid Transit (MRT) system. The project, aimed to improve public transport in the Klang Valley, was approved by the Malaysian cabinet on 16 December 2010 and construction of the first line from Sungai Buloh to Kajang would begin in July 2011 with a duration of five to six years. Gross national income from these future lines is between RM3 bil and RM12 bil. [citation needed] The government had appointed MMC-Gamuda JV Sdn Bhd as Project Delivery Partner where it would play the role project manager, supervised by the Land Public Transport Commission (SPAD). The whole project would be divided into nine parcels in which will be done on open tender basis. 10 km (6.2 mi) of the line would be underground and the remaining 50 km (31 mi) above ground with 35 new stations. MMC-Gamuda would be barred from bidding for any tender except for tunnelling works (the most expensive portion). Ownership of the lines would be given to SPNB.
To seek for further consultation from the public, SPAD held a 3-month public display of the alignment of the MRT Kajang Line. On 8 July 2011, Najib officially launched the project. The final alignment was adjusted following the public display, having a length of 51 km (32 mi) with 31 stations where 16 have Park and Ride facilities. Construction was said to be completed in December 2016 and the line would start operations a month after. On 17 August 2011, the government announced that Mass Rapid Transit Corporation Sdn Bhd (MRT Corp), a new company under the Finance Ministry had been formed to take control of the project from Prasarana. MRT Corp would be the asset owner of the project and officially take over the project from Prasarana on 1 September 2011. After the MRT project was formally launched on 8 July 2011, the following amendments have been made to the original proposed alignment following the public display exercise between March and May 2011:
On 21 October 2011, MRT Corp shortlisted 5 companies to construct the underground parts of the line including MMC Gamuda Joint Venture and Sinohydro Group. On 26 January 2012, MRT Corp announced the award of the first two civil works contracts for the construction of the MRT Kajang line. IJM Construction Sdn Bhd was appointed the contractor for Package V5 at a tender price of RM974 million, while Ahmad Zaki Sdn Bhd was appointed the contractor for Package V6 at a tender price of RM764 million. Package V5 is from the Maluri portal to Plaza Phoenix (now Taman Connaught) station while Package V6 covers the section between Plaza Phoenix and Bandar Tun Hussein Onn stations. MRT Corp announced the pre-qualification of 28 companies to bid for six System Works Packages for the MRT line on 8 March 2012. Subsequently, in September 2012, another 31 companies were pre-qualified to bid for the remaining five System Works Packages.