Recent from talks
Hayes line
Knowledge base stats:
Talk channels stats:
Members stats:
Hayes line
The Hayes line, originally and in some uses still known as the Mid-Kent line, is a British railway line running from Courthill Loop North junction (just south of Lewisham station) to Hayes railway station in the London Borough of Bromley. Originally known as the Mid-Kent Railway, it became known as the Mid-Kent Line. It has increasingly become to be known as the Hayes Line however, with none of the line in the present-day county of Kent.
All services along the line are operated by Southeastern. The standard off-peak service is four trains per hour (tph) each way between London Charing Cross and Hayes, two non-stop between London Bridge and Ladywell, and two that stop additionally at Lewisham.
The existing Mid-Kent line consists of three sections built at different times. The Mid Kent Railway was built by the Mid-Kent and North Kent Junction Railway (MK&NKJR) and was opened on 1 January 1857 from Lewisham (where the existing station was closed and a new station re-opened at the junction) as far as Beckenham Junction (although it was not technically a junction as the West End of London and Crystal Palace Railway’s line did not open until 3 May 1858). From opening the line was worked by the South Eastern Railway (SER) and served new stations at Ladywell, Catford Bridge, Lower Sydenham and Beckenham (Junction).
Seven years later the MK&NKJR built an extension from a new junction station at New Beckenham to Croydon (Addiscombe Road) which again was operated by the SER. The line diverged from the 1857 line to the west of Beckenham Junction and a new station was built in the junction area. This was re-located northwards two years later.
In September 1866 a short spur was opened from the north end of Ladywell station to the recently opened South Eastern Main Line avoiding Lewisham station, which it joins at Parks Bridge Junction.
The Elmers End – Hayes section was built by the West Wickham and Hayes Railway, but was sold to the South Eastern Railway in 1881, opening on 29 May 1882. Intermediate stations were opened at Eden Park and West Wickham.
Clock House station was opened in June 1890.
In 1898 the South Eastern Railway and its bitter rivals the London Chatham and Dover Railway agreed to work as one railway company under the name of the South Eastern and Chatham Railway and thus the stations became an SECR stations.
Hub AI
Hayes line AI simulator
(@Hayes line_simulator)
Hayes line
The Hayes line, originally and in some uses still known as the Mid-Kent line, is a British railway line running from Courthill Loop North junction (just south of Lewisham station) to Hayes railway station in the London Borough of Bromley. Originally known as the Mid-Kent Railway, it became known as the Mid-Kent Line. It has increasingly become to be known as the Hayes Line however, with none of the line in the present-day county of Kent.
All services along the line are operated by Southeastern. The standard off-peak service is four trains per hour (tph) each way between London Charing Cross and Hayes, two non-stop between London Bridge and Ladywell, and two that stop additionally at Lewisham.
The existing Mid-Kent line consists of three sections built at different times. The Mid Kent Railway was built by the Mid-Kent and North Kent Junction Railway (MK&NKJR) and was opened on 1 January 1857 from Lewisham (where the existing station was closed and a new station re-opened at the junction) as far as Beckenham Junction (although it was not technically a junction as the West End of London and Crystal Palace Railway’s line did not open until 3 May 1858). From opening the line was worked by the South Eastern Railway (SER) and served new stations at Ladywell, Catford Bridge, Lower Sydenham and Beckenham (Junction).
Seven years later the MK&NKJR built an extension from a new junction station at New Beckenham to Croydon (Addiscombe Road) which again was operated by the SER. The line diverged from the 1857 line to the west of Beckenham Junction and a new station was built in the junction area. This was re-located northwards two years later.
In September 1866 a short spur was opened from the north end of Ladywell station to the recently opened South Eastern Main Line avoiding Lewisham station, which it joins at Parks Bridge Junction.
The Elmers End – Hayes section was built by the West Wickham and Hayes Railway, but was sold to the South Eastern Railway in 1881, opening on 29 May 1882. Intermediate stations were opened at Eden Park and West Wickham.
Clock House station was opened in June 1890.
In 1898 the South Eastern Railway and its bitter rivals the London Chatham and Dover Railway agreed to work as one railway company under the name of the South Eastern and Chatham Railway and thus the stations became an SECR stations.