Hubbry Logo
Mount Apo Geothermal Power PlantMount Apo Geothermal Power PlantMain
Open search
Mount Apo Geothermal Power Plant
Community hub
Mount Apo Geothermal Power Plant
logo
7 pages, 0 posts
0 subscribers
Be the first to start a discussion here.
Be the first to start a discussion here.
Mount Apo Geothermal Power Plant
from Wikipedia

The Mount Apo Geothermal Power Plant is a 106-MW geothermal power station located in Barangay Ilomavis, Kidapawan, Cotabato, Philippines.

Key Information

Drawing steam from the Mindanao Geothermal Production Field,[3] the power station is situated near the foot of Mount Apo. It is currently part of the Mindanao Grid that supplies electricity to Kidapawan and Davao Region.

It is built with the ancestral domain of the Manobo, who receives royalty from the operation of the power station.

History

[edit]

Plans for a geothermal plant was in place as early as 1988. The project was an initiative of the Energy Development Corporation (EDC) which was then a subsidiary of the state-owned Philippine National Oil Company (PNOC).[4]

The project was subject to delay with opposition to it due to Mount Apo being a site of a national park and a designated ASEAN Heritage Park.[5] Also the Manobo considers the area as linked to their faith.[4]

On March 10, 1992, a ritual known as Pamaas was conducted in Lake Agco by a tribal elder who sought permission from Apo Sandawa, the mountain deity.[4][6] The Manobo also as a result also is entitled to royalty due to usage of their ancestral land.[4][7]

The first unit of the Mount Apo Geothermal Power Plant was commissioned in March 4, 1997.[7] Due to a build–operate–transfer scheme it was operated under an American-Japanese consortium of Oxbow Power Corp. and Marubeni.[4][7] The second unit was commissioned on June 17, 1999.[7]

The consortium was to turn over the operation back to the EDC after ten years. But this was extended taking into account the second unit's commissioning.[8] The EDC was privatized in 2007 and was taken over by the Lopez Group.[9] The EDC acquired the geothermal station in 2009.[8][7]

The Manobo renewed their consent to use the site by the EDC in exchange for royalties with the conduct of the samaya ritual in 2019.[7]

Facilities

[edit]
Unit Capacity Commissioned
Mindanao 1 Geothermal Partnership (M1GP) 52-MW 1997
Mindanao 2 Geothermal Partnership (M2GP) 54-MW 1999

References

[edit]
[edit]
Revisions and contributorsEdit on WikipediaRead on Wikipedia
Add your contribution
Related Hubs
User Avatar
No comments yet.