Hubbry Logo
search
search button
Sign in
Historyarrow-down
starMorearrow-down
Hubbry Logo
search
search button
Sign in
Nemo Link
Community hub for the Wikipedia article
logoWikipedian hub
Welcome to the community hub built on top of the Nemo Link Wikipedia article. Here, you can discuss, collect, and organize anything related to Nemo Link. The purpose of the hub is to connect people, foster deeper knowledge, and help improve the root Wikipedia article.
Add your contribution
Inside this hub
Nemo Link
Nemo Link
Conversion station in Bruges
Conversion station in Bruges
Map
Map of Nemo Link
Location
CountryBelgium
United Kingdom
FromZeebrugge, Belgium
Passes throughNorth Sea
ToRichborough, Kent, England
Ownership information
PartnersElia System Operator
National Grid plc
Construction information
Manufacturer of conductor/cableJ-Power Systems Corporation
Installer of conductor/cableJ-Power Systems Corporation, DeepOcean
Manufacturer of substationsSiemens
Installer of substationsSiemens
Commissioned31 January 2019
Technical information
Typesubmarine cable
Type of currentHVDC
Total length140 km (87 mi)
Power rating1,000 MW
DC voltage400 kV

Nemo Link is a 1,000 MW HVDC submarine power cable between Richborough Energy Park in Kent, the United Kingdom and Zeebrugge, Belgium.[1] The project is a joint venture between British National Grid and Belgian Elia.[1] The 400 kV[1][2] electrical interconnector is the first between the two countries, with an annual transmission capacity of 8.76 TWh. The link has been fully operational since 31 January 2019,[1][3] and has transported 29 TWh during its first 5 years; 24.75 TWh to the UK and 4.25 to Belgium with an availability above 99%.[4]

History

[edit]

In 2015, contracts totalling €500 million were awarded to Siemens for the construction of the two onshore HVDC converter stations and to J-Power Systems Corporation for the cable system.[1][5] The contract for the laying of the actual cable was awarded to DeepOcean who completed the work in 2017 and 2018.[6][7]

Route

[edit]

The total cable length is 140 km (87 miles) of which 130 kilometres (81 mi) is under water, buried at a depth of up to 60 metres (200 ft).[2] The offshore section runs from Pegwell Bay on the UK side to Zeebrugge beach in Belgium. The onshore cable in Belgium is nearly 9 km (5.6 miles) long and connects the landing point of the submarine cable in Zeebrugge beach to the converter station in Herdersbrug. In the United Kingdom there is 2 km (1.2 miles) of land cable from Pegwell Bay to the Richborough converter station.