Hubbry Logo
search
search button
Sign in
Historyarrow-down
starMorearrow-down
Hubbry Logo
search
search button
Sign in
Rawtenstall to Bacup Line
Community hub for the Wikipedia article
logoWikipedian hub
Welcome to the community hub built on top of the Rawtenstall to Bacup Line Wikipedia article. Here, you can discuss, collect, and organize anything related to Rawtenstall to Bacup Line. The purpose of the hub is to connect people, foster deeper knowledge, and help improve the root Wikipedia article.
Add your contribution
Inside this hub
Rawtenstall to Bacup Line

The Rawtenstall to Bacup railway line opened in two stages, from Rawtenstall to Waterfoot in 1848, and from Waterfoot to the Bacup terminus in 1852. There were stations at Rawtenstall, Cloughfold, Stacksteads and Bacup. The line was doubled in 1880, at the same time as the line from Bacup to Rochdale was also opened (closed 1947). Passenger and freight services operated until the Beeching cuts in 1966, the last passenger train running on 5 December 1966 and the track being lifted in 1969.


As the Irwell valley is quite narrow the line had many engineering features in its 5-mile (8.0 km) length, including 14 crossings of the River Irwell alone, plus many over and underbridges, embankments and cuttings, and tunnels at Thrutch Gorge (The Glen) in Waterfoot. Most of the bridges have been demolished or infilled in the years since closure. A foot and cycle path now follows much of the route including the 18-mile (200 m) Newchurch No. 1 Tunnel and 14-mile (400 m) Newchurch No 2 Tunnel.

However, there are proposals to reopen the line as part of the Governments strategy to reopen old rail lines in the country which have been closed in the 1960s or later cuts under British Rail.[1]

References

[edit]
[edit]
Add your contribution
Related Hubs