Recent from talks
Contribute something to knowledge base
Content stats: 0 posts, 0 articles, 1 media, 0 notes
Members stats: 0 subscribers, 0 contributors, 0 moderators, 0 supporters
Subscribers
Supporters
Contributors
Moderators
Hub AI
Shippingport Atomic Power Station AI simulator
(@Shippingport Atomic Power Station_simulator)
Hub AI
Shippingport Atomic Power Station AI simulator
(@Shippingport Atomic Power Station_simulator)
Shippingport Atomic Power Station
The Shippingport Atomic Power Station was (according to the US Nuclear Regulatory Commission) the world's first full-scale atomic electric power plant devoted exclusively to peacetime uses. It was located near the later Beaver Valley Nuclear Generating Station on the Ohio River in Beaver County, Pennsylvania, United States, about 25 miles (40 km) from Pittsburgh.
The reactor reached criticality on December 2, 1957, and aside from stoppages for three core changes, it remained in operation until October 1982. The first electrical power was produced on December 18, 1957, as engineers synchronized the plant with the distribution grid of Duquesne Light Company.
The first core used at Shippingport originated from a cancelled nuclear-powered aircraft carrier and used highly enriched uranium (93% U-235) as "seed" fuel surrounded by a "blanket" of natural U-238, in a so-called seed-and-blanket design; in the first reactor about half the power came from the seed. The first Shippingport core reactor turned out to be capable of an output of 60 MWe one month after its launch. The second core was similarly designed but more powerful, having a larger seed. The highly energetic seed required more refueling cycles than the blanket in these first two cores.
The third and final core used at Shippingport was an experimental, light water moderated, thermal breeder reactor. It kept the same seed-and-blanket design, but the seed was now uranium-233 and the blanket was made of thorium. Being a breeder reactor, it had the ability to transmute relatively inexpensive thorium to uranium-233 as part of its fuel cycle. The breeding ratio attained by Shippingport's third core was 1.01. Over its 25-year life, the Shippingport power plant operated for about 80,324 hours, producing about 7.4 billion kilowatt-hours of electricity.
Owing to these peculiarities, some non-governmental sources label Shippingport a "demonstration PWR reactor" and consider that the "first fully commercial PWR" in the US was Yankee Rowe. Criticism centers on the fact that the Shippingport plant had not been built to commercial specifications. Consequently, the construction cost per kilowatt at Shippingport was about ten times those for a conventional power plant.
In 1953, US President Dwight D. Eisenhower gave his Atoms for Peace speech to the United Nations. Commercial nuclear power generation was cornerstone of his plan. A proposal by Duquesne Light Company was accepted by Admiral Rickover and the plans for the Shippingport Atomic Power Station started.[citation needed]
Ground was broken on Labor Day, September 6, 1954. President Eisenhower remotely initiated the first scoop of dirt at the ceremony. The reactor achieved first criticality at 4:30 AM on December 2, 1957. Sixteen days later, on December 18, the first electrical power was generated and full power was achieved on December 23, 1957, although the station remained in test mode. Eisenhower opened the Shippingport Atomic Power Station on May 26, 1958. The plant was built in 32 months at a cost of $72.5 million (equivalent to $617 million in 2023).
The type of reactor used at Shippingport was a matter of expediency. The Atomic Energy Commission urged the construction of a reactor integrated into the utility grid. The only suitable reactor available at the time was the one that was intended for the nuclear-powered aircraft carrier desired by the Navy, but which Eisenhower had just vetoed.
Shippingport Atomic Power Station
The Shippingport Atomic Power Station was (according to the US Nuclear Regulatory Commission) the world's first full-scale atomic electric power plant devoted exclusively to peacetime uses. It was located near the later Beaver Valley Nuclear Generating Station on the Ohio River in Beaver County, Pennsylvania, United States, about 25 miles (40 km) from Pittsburgh.
The reactor reached criticality on December 2, 1957, and aside from stoppages for three core changes, it remained in operation until October 1982. The first electrical power was produced on December 18, 1957, as engineers synchronized the plant with the distribution grid of Duquesne Light Company.
The first core used at Shippingport originated from a cancelled nuclear-powered aircraft carrier and used highly enriched uranium (93% U-235) as "seed" fuel surrounded by a "blanket" of natural U-238, in a so-called seed-and-blanket design; in the first reactor about half the power came from the seed. The first Shippingport core reactor turned out to be capable of an output of 60 MWe one month after its launch. The second core was similarly designed but more powerful, having a larger seed. The highly energetic seed required more refueling cycles than the blanket in these first two cores.
The third and final core used at Shippingport was an experimental, light water moderated, thermal breeder reactor. It kept the same seed-and-blanket design, but the seed was now uranium-233 and the blanket was made of thorium. Being a breeder reactor, it had the ability to transmute relatively inexpensive thorium to uranium-233 as part of its fuel cycle. The breeding ratio attained by Shippingport's third core was 1.01. Over its 25-year life, the Shippingport power plant operated for about 80,324 hours, producing about 7.4 billion kilowatt-hours of electricity.
Owing to these peculiarities, some non-governmental sources label Shippingport a "demonstration PWR reactor" and consider that the "first fully commercial PWR" in the US was Yankee Rowe. Criticism centers on the fact that the Shippingport plant had not been built to commercial specifications. Consequently, the construction cost per kilowatt at Shippingport was about ten times those for a conventional power plant.
In 1953, US President Dwight D. Eisenhower gave his Atoms for Peace speech to the United Nations. Commercial nuclear power generation was cornerstone of his plan. A proposal by Duquesne Light Company was accepted by Admiral Rickover and the plans for the Shippingport Atomic Power Station started.[citation needed]
Ground was broken on Labor Day, September 6, 1954. President Eisenhower remotely initiated the first scoop of dirt at the ceremony. The reactor achieved first criticality at 4:30 AM on December 2, 1957. Sixteen days later, on December 18, the first electrical power was generated and full power was achieved on December 23, 1957, although the station remained in test mode. Eisenhower opened the Shippingport Atomic Power Station on May 26, 1958. The plant was built in 32 months at a cost of $72.5 million (equivalent to $617 million in 2023).
The type of reactor used at Shippingport was a matter of expediency. The Atomic Energy Commission urged the construction of a reactor integrated into the utility grid. The only suitable reactor available at the time was the one that was intended for the nuclear-powered aircraft carrier desired by the Navy, but which Eisenhower had just vetoed.
