Hubbry Logo
search
search button
Sign in
Historyarrow-down
starMorearrow-down
Hubbry Logo
search
search button
Sign in
Stoke EfW
Community hub for the Wikipedia article
logoWikipedian hub
Welcome to the community hub built on top of the Stoke EfW Wikipedia article. Here, you can discuss, collect, and organize anything related to Stoke EfW. The purpose of the hub is to connect people, foster deeper knowledge, and help improve the root Wikipedia article.
Add your contribution
Inside this hub
Stoke EfW

Stoke EfW, seen adjacent to the A50/A500 junction.

Stoke EfW is a large incineration plant in the Sideway area of Stoke-on-Trent, England. It burns municipal waste and in the process produces electricity for the National Grid.

It was originally built in 1989 and is operated by Hanford Waste Services Ltd. The original plant was found to release 300 times the standard level of dioxins, so was replaced with a new facility, opening in October 1998.[1] The plant is dominated by a 76-metre-tall chimney stack and has a total installed generating capacity of 15.4 megawatts.

52°59′22″N 2°10′56″W / 52.989461°N 2.182310°W / 52.989461; -2.182310

References

[edit]
[edit]
Add your contribution
Related Hubs