Recent from talks
Knowledge base stats:
Talk channels stats:
Members stats:
Subic–Clark–Tarlac Expressway
The Subic–Clark–Tarlac Expressway (SCTEX), signed as E1 and E4 of the Philippine expressway network, is a controlled-access toll expressway in the Central Luzon region of the Philippines. From its northern terminus in Tarlac City to its southern terminus at Tipo in Dinalupihan, Bataan, the SCTEX serves as one of the main expressways in Luzon. The expressway is also connected to the Central Luzon Link Expressway, North Luzon Expressway, Tarlac–Pangasinan–La Union Expressway, and the Subic Freeport Expressway. The SCTEX is the country's longest expressway at 93.77 kilometers (58.27 mi) until the completion of Toll Road 4 of South Luzon Expressway (SLEX). The Subic–Clark–Tarlac Expressway was constructed to provide a more efficient transport corridor between Subic Bay Freeport, Clark, and the Central Techno Park in Tarlac, foster development on the municipalities served, and connect major infrastructures such as the Subic Seaport and Clark International Airport.
Built by the Bases Conversion and Development Authority (BCDA), a government-owned and controlled corporation, construction of the expressway started in 2005. Commercial operations then started on April 28, 2008, with the opening of the Subic–Clark Segment and Zone A of the portion of Clark-Tarlac Segment. The opening of Zones B and C of the remaining Clark–Tarlac Segment on July 25, 2008, signaled the full operations of SCTEX.
The Subic–Clark–Tarlac Expressway (SCTEX) runs northwest from Bataan and runs through the provinces of Pampanga and Tarlac. The entirety of the SCTEX is built as a four-lane expressway mostly laid out on embankment, with some sections using cuts to traverse hilly areas. The expressway also crosses the four rivers in Central Luzon: the Dinalupihan River in Bataan, the Gumain River in Floridablanca and the Pasig–Potrero River in Porac, both in Pampanga, and the Sacobia River in Bamban, Tarlac. All exits require toll payment, and toll plazas are laid on the termini of the expressway.
SCTEX starts at Tipo Interchange, its intersection with the Subic Freeport Expressway (SFEX) in Dinalupihan, near Barangay Tipo in Hermosa, Bataan. The expressway initially traverses the Roosevelt Protected Landscape and is built parallel to the Jose Abad Santos Avenue (N3) until Dinalupihan Exit, where the expressway curves northward and tracks the Angeles-Porac-Floridablanca-Dinalupihan Road as it follows a mostly straight route. The expressway then curves to the northeast before Floridablanca Exit. It curves toward the northwest and back to the northeast before Porac Exit. It then curves eastward and then northward near Clark Freeport and Clark International Airport. Clark South Exit, which serves those areas, lies near Mabalacat Interchange, with the exits being one kilometer (0.62 mi) apart from each other. The segment ends at the Clark Logistics interchange in Mabalacat, where it meets the Clark Spur Road (also known as NLEX–SCTEX Link) that links SCTEX with North Luzon Expressway (NLEX) and crosses over MacArthur Highway (N2).
Past the Clark Logistics interchange, its main destination changes to Tarlac City and Baguio. The roadway runs at the boundary of Clark Freeport and Mabalacat city proper, where the Philippine National Railways (PNR) North Main Line to Dagupan and San Fernando, La Union also lies. MacArthur Highway parallels the expressway up to Tarlac City.
Leaving Clark Freeport, Clark North Exit comes before the expressway, where it curves and then crosses MacArthur Highway at Barangay Dolores, where a half-partial cloverleaf interchange, serving only northbound traffic, connects the two. Approaching Tarlac, the expressway bridges over the Sacobia River. The first service areas on the expressway, one serving northbound and one for southbound traffic and separated by one kilometer, come before Concepcion Exit. The expressway passes near the poblacion of Concepcion, then over agricultural land of Tarlac City. Hacienda Luisita Exit comes before the northern end of the expressway, and serves Hacienda Luisita as well as connecting MacArthur Highway and serving barangays along its connecting road. A new toll plaza built on the main route serves the final Tarlac City Exit. The exit serves an interchange with the Central Luzon Link Expressway (CLLEX). Past Tarlac City Exit, SCTEX becomes Tarlac–Pangasinan–La Union Expressway (TPLEX) northward.
The Subic–Clark–Tarlac Expressway or SCTEx Project was initiated under the administration of President Joseph Estrada with an original project cost of ₱15.73 billion. On September 14, 2001, the loan agreement was signed between the Philippines and Japan to finance and construct the expressway with a total cost of ₱17.84 billion (¥41.93 billion) during the state visit of President Gloria Macapagal Arroyo in Japan. Construction of the expressway commenced on April 5, 2005 which established its right-of-way that marked the start of the expressway's existence. The expressway is the longest in the country, covering 93 kilometers (58 mi).
The original project for the expressway was divided into two segments: the 50.5-kilometer (31.4 mi) Subic-Clark segment and the 43.27-kilometer (26.89 mi) Clark-Tarlac segment. The contractors were a joint venture of Kajima, Obayashi, JFE Engineering, and Mitsubishi Heavy Industries for the Subic-Clark segment, and a joint venture of Hazama, Taisei, and Nippon Steel for the Clark-Tarlac segment. Consultation was provided by a joint venture of Oriental Consultant, Katahira & Engineering International, and Nippon Koei.
Hub AI
Subic–Clark–Tarlac Expressway AI simulator
(@Subic–Clark–Tarlac Expressway_simulator)
Subic–Clark–Tarlac Expressway
The Subic–Clark–Tarlac Expressway (SCTEX), signed as E1 and E4 of the Philippine expressway network, is a controlled-access toll expressway in the Central Luzon region of the Philippines. From its northern terminus in Tarlac City to its southern terminus at Tipo in Dinalupihan, Bataan, the SCTEX serves as one of the main expressways in Luzon. The expressway is also connected to the Central Luzon Link Expressway, North Luzon Expressway, Tarlac–Pangasinan–La Union Expressway, and the Subic Freeport Expressway. The SCTEX is the country's longest expressway at 93.77 kilometers (58.27 mi) until the completion of Toll Road 4 of South Luzon Expressway (SLEX). The Subic–Clark–Tarlac Expressway was constructed to provide a more efficient transport corridor between Subic Bay Freeport, Clark, and the Central Techno Park in Tarlac, foster development on the municipalities served, and connect major infrastructures such as the Subic Seaport and Clark International Airport.
Built by the Bases Conversion and Development Authority (BCDA), a government-owned and controlled corporation, construction of the expressway started in 2005. Commercial operations then started on April 28, 2008, with the opening of the Subic–Clark Segment and Zone A of the portion of Clark-Tarlac Segment. The opening of Zones B and C of the remaining Clark–Tarlac Segment on July 25, 2008, signaled the full operations of SCTEX.
The Subic–Clark–Tarlac Expressway (SCTEX) runs northwest from Bataan and runs through the provinces of Pampanga and Tarlac. The entirety of the SCTEX is built as a four-lane expressway mostly laid out on embankment, with some sections using cuts to traverse hilly areas. The expressway also crosses the four rivers in Central Luzon: the Dinalupihan River in Bataan, the Gumain River in Floridablanca and the Pasig–Potrero River in Porac, both in Pampanga, and the Sacobia River in Bamban, Tarlac. All exits require toll payment, and toll plazas are laid on the termini of the expressway.
SCTEX starts at Tipo Interchange, its intersection with the Subic Freeport Expressway (SFEX) in Dinalupihan, near Barangay Tipo in Hermosa, Bataan. The expressway initially traverses the Roosevelt Protected Landscape and is built parallel to the Jose Abad Santos Avenue (N3) until Dinalupihan Exit, where the expressway curves northward and tracks the Angeles-Porac-Floridablanca-Dinalupihan Road as it follows a mostly straight route. The expressway then curves to the northeast before Floridablanca Exit. It curves toward the northwest and back to the northeast before Porac Exit. It then curves eastward and then northward near Clark Freeport and Clark International Airport. Clark South Exit, which serves those areas, lies near Mabalacat Interchange, with the exits being one kilometer (0.62 mi) apart from each other. The segment ends at the Clark Logistics interchange in Mabalacat, where it meets the Clark Spur Road (also known as NLEX–SCTEX Link) that links SCTEX with North Luzon Expressway (NLEX) and crosses over MacArthur Highway (N2).
Past the Clark Logistics interchange, its main destination changes to Tarlac City and Baguio. The roadway runs at the boundary of Clark Freeport and Mabalacat city proper, where the Philippine National Railways (PNR) North Main Line to Dagupan and San Fernando, La Union also lies. MacArthur Highway parallels the expressway up to Tarlac City.
Leaving Clark Freeport, Clark North Exit comes before the expressway, where it curves and then crosses MacArthur Highway at Barangay Dolores, where a half-partial cloverleaf interchange, serving only northbound traffic, connects the two. Approaching Tarlac, the expressway bridges over the Sacobia River. The first service areas on the expressway, one serving northbound and one for southbound traffic and separated by one kilometer, come before Concepcion Exit. The expressway passes near the poblacion of Concepcion, then over agricultural land of Tarlac City. Hacienda Luisita Exit comes before the northern end of the expressway, and serves Hacienda Luisita as well as connecting MacArthur Highway and serving barangays along its connecting road. A new toll plaza built on the main route serves the final Tarlac City Exit. The exit serves an interchange with the Central Luzon Link Expressway (CLLEX). Past Tarlac City Exit, SCTEX becomes Tarlac–Pangasinan–La Union Expressway (TPLEX) northward.
The Subic–Clark–Tarlac Expressway or SCTEx Project was initiated under the administration of President Joseph Estrada with an original project cost of ₱15.73 billion. On September 14, 2001, the loan agreement was signed between the Philippines and Japan to finance and construct the expressway with a total cost of ₱17.84 billion (¥41.93 billion) during the state visit of President Gloria Macapagal Arroyo in Japan. Construction of the expressway commenced on April 5, 2005 which established its right-of-way that marked the start of the expressway's existence. The expressway is the longest in the country, covering 93 kilometers (58 mi).
The original project for the expressway was divided into two segments: the 50.5-kilometer (31.4 mi) Subic-Clark segment and the 43.27-kilometer (26.89 mi) Clark-Tarlac segment. The contractors were a joint venture of Kajima, Obayashi, JFE Engineering, and Mitsubishi Heavy Industries for the Subic-Clark segment, and a joint venture of Hazama, Taisei, and Nippon Steel for the Clark-Tarlac segment. Consultation was provided by a joint venture of Oriental Consultant, Katahira & Engineering International, and Nippon Koei.
