Recent from talks
Contribute something to knowledge base
Content stats: 0 posts, 0 articles, 1 media, 0 notes
Members stats: 0 subscribers, 0 contributors, 0 moderators, 0 supporters
Subscribers
Supporters
Contributors
Moderators
Hub AI
UGM-133 Trident II AI simulator
(@UGM-133 Trident II_simulator)
Hub AI
UGM-133 Trident II AI simulator
(@UGM-133 Trident II_simulator)
UGM-133 Trident II
The UGM-133A Trident II, or Trident D5 is a submarine-launched ballistic missile (SLBM), built by Lockheed Martin Space in Sunnyvale, California, and deployed with the United States Navy and Royal Navy. It was first deployed in March 1990, and remains in service. The Trident II Strategic Weapons System is an improved SLBM with greater accuracy, payload, and range than the earlier Trident C-4. It is a key element of the U.S. strategic nuclear triad and strengthens U.S. strategic deterrence. The Trident II is considered to be a durable sea-based system capable of engaging many targets. It has payload flexibility that can accommodate various treaty requirements, such as New START. The Trident II's increased payload allows nuclear deterrence to be accomplished with fewer submarines, and its high accuracy—approaching that of land-based missiles—enables it to be used as a first strike weapon.
Trident II missiles are carried by 14 US Ohio and 4 British Vanguard-class submarines, with 20 missiles on each Ohio class and 16 missiles on each Vanguard class (the number of missiles on Ohio-class submarines was reduced from 24 to 20 by 2017, in compliance with the New Strategic Arms Reduction Treaty). There have been 215 total test launches of the D5, with 207 successes. 196 launches were from the sea: 191 successes and 5 failures. 181 of the successes and 3 of the failures were by the US, while 10 of the successes and 2 of the failures were by the UK. 19 launches were from land, all by the US, with 16 successes and 3 failures. the most recent successful launch from USS Louisiana (SSBN-743) on 27 September 2023. There have been 8 test flights that were failures, the most recent being from HMS Vanguard off the coast of Florida in January 2024. The D5 is the sixth in a series of missile generations deployed since the sea-based deterrent program began 60 years ago. The Trident D5LE (life-extension) version will remain in service until 2042.
The Trident II was designed with greater range and payload capacity than its predecessor (Trident C-4). In 1972, the US Navy projected an initial operating capability (IOC) date of 1984. The US Navy shifted the IOC date to 1982. On 18 October 1973, a Trident program review was administered. On 14 March 1974, the US Deputy Secretary of Defense disseminated two requirements for the Trident program. The first was an accuracy improvement for the Trident C-4. The second requirement asked for an alternative to the C-4, or a new Trident II missile with a larger first-stage motor than the C-4.
The U.S. Navy conducted studies to determine whether the more expensive Trident II could be constructed similarly to the US Air Force's MX ICBM, primarily to decrease budget costs. It was established that the Trident II would be 83 inches (210 cm) in diameter and 44 feet (13 m) in length in order to match the performance of the existing MX ICBM. Modifications to the guidance system, electronics hardening, and external protective coatings were incorporated into the design. While this satisfied the Navy's study requirements, it did not accommodate the US Air Force payload requirements.
Propulsion stages were proposed to be used between the first stage and second stage motors, effectively making the Trident II a longer three-stage missile than the C-4. Studies were delayed in 1978 when Congress approved only $5 million of the suggested $15 million for the Navy and Air Force program studies. By December 1978, the Navy's and the Air Force's own studies agreed with each other that a similar missile structure would not achieve desired savings. It was determined that the Navy and Air Force would maintain and be responsible for their own unique weapon systems. The US Navy continued with its own design of the Trident II.
In March 1980, US Secretary of Defense Harold Brown proposed an increased level of funding for the submarine-launched ballistic missile modernization, emphasizing increased accuracy. The House Armed Services Committee (HASC) recommended no funding, while the Senate Armed Services Committee (SASC) recommended full funding of $97 million. The SASC asked for a plan incorporating "the fullest possible competition . . . [and] should consider competing among contractors for each major component, including the integrated missile." $65 million was awarded for the submarine-launched ballistic missile modernization.
On 2 October 1981, President Reagan called for the modernization of the strategic forces. The Defense Department directed the Navy to fund all development of the Trident II D5 missile with a December 1989 IOC. All research and development efforts would be directed toward "a new development, advanced technology, high accuracy Trident II D5 system." In December 1982, Deputy SECDEF Frank Carlucci advised the Secretary of Defense Caspar Weinberger to include funding for a new reentry vehicle–warhead combination for Trident II. The reentry vehicle was to be designated as the Mk 5, which was to have a greater yield than the Mk 4. The development contract for Trident II was issued in October 1983. On 28 December 1983, the deputy SECDEF authorized the Navy to proceed with full-scale engineering development of the Trident II D5.
An initial series of 19 land-based Trident II launches took place from Cape Canaveral Launch Complex 46 from 15 January 1987 to 27 January 1989. The first submarine launch was attempted by USS Tennessee, the first D-5 ship of the Ohio class, on 21 March 1989 off the coast of Cape Canaveral, Florida. The launch attempt failed four seconds into the flight because the plume of water following the missile rose to a greater height than expected, and water was in the nozzle when the motor ignited. Once the problem was understood, relatively simple changes were quickly made, but the problem delayed the initial operating capability of Trident II until March 1990. IOC for Strategic Weapons Facility Pacific (SWFPAC) was completed on schedule in 2001, allowing Trident II SSBN to be deployed in the Pacific theater.
UGM-133 Trident II
The UGM-133A Trident II, or Trident D5 is a submarine-launched ballistic missile (SLBM), built by Lockheed Martin Space in Sunnyvale, California, and deployed with the United States Navy and Royal Navy. It was first deployed in March 1990, and remains in service. The Trident II Strategic Weapons System is an improved SLBM with greater accuracy, payload, and range than the earlier Trident C-4. It is a key element of the U.S. strategic nuclear triad and strengthens U.S. strategic deterrence. The Trident II is considered to be a durable sea-based system capable of engaging many targets. It has payload flexibility that can accommodate various treaty requirements, such as New START. The Trident II's increased payload allows nuclear deterrence to be accomplished with fewer submarines, and its high accuracy—approaching that of land-based missiles—enables it to be used as a first strike weapon.
Trident II missiles are carried by 14 US Ohio and 4 British Vanguard-class submarines, with 20 missiles on each Ohio class and 16 missiles on each Vanguard class (the number of missiles on Ohio-class submarines was reduced from 24 to 20 by 2017, in compliance with the New Strategic Arms Reduction Treaty). There have been 215 total test launches of the D5, with 207 successes. 196 launches were from the sea: 191 successes and 5 failures. 181 of the successes and 3 of the failures were by the US, while 10 of the successes and 2 of the failures were by the UK. 19 launches were from land, all by the US, with 16 successes and 3 failures. the most recent successful launch from USS Louisiana (SSBN-743) on 27 September 2023. There have been 8 test flights that were failures, the most recent being from HMS Vanguard off the coast of Florida in January 2024. The D5 is the sixth in a series of missile generations deployed since the sea-based deterrent program began 60 years ago. The Trident D5LE (life-extension) version will remain in service until 2042.
The Trident II was designed with greater range and payload capacity than its predecessor (Trident C-4). In 1972, the US Navy projected an initial operating capability (IOC) date of 1984. The US Navy shifted the IOC date to 1982. On 18 October 1973, a Trident program review was administered. On 14 March 1974, the US Deputy Secretary of Defense disseminated two requirements for the Trident program. The first was an accuracy improvement for the Trident C-4. The second requirement asked for an alternative to the C-4, or a new Trident II missile with a larger first-stage motor than the C-4.
The U.S. Navy conducted studies to determine whether the more expensive Trident II could be constructed similarly to the US Air Force's MX ICBM, primarily to decrease budget costs. It was established that the Trident II would be 83 inches (210 cm) in diameter and 44 feet (13 m) in length in order to match the performance of the existing MX ICBM. Modifications to the guidance system, electronics hardening, and external protective coatings were incorporated into the design. While this satisfied the Navy's study requirements, it did not accommodate the US Air Force payload requirements.
Propulsion stages were proposed to be used between the first stage and second stage motors, effectively making the Trident II a longer three-stage missile than the C-4. Studies were delayed in 1978 when Congress approved only $5 million of the suggested $15 million for the Navy and Air Force program studies. By December 1978, the Navy's and the Air Force's own studies agreed with each other that a similar missile structure would not achieve desired savings. It was determined that the Navy and Air Force would maintain and be responsible for their own unique weapon systems. The US Navy continued with its own design of the Trident II.
In March 1980, US Secretary of Defense Harold Brown proposed an increased level of funding for the submarine-launched ballistic missile modernization, emphasizing increased accuracy. The House Armed Services Committee (HASC) recommended no funding, while the Senate Armed Services Committee (SASC) recommended full funding of $97 million. The SASC asked for a plan incorporating "the fullest possible competition . . . [and] should consider competing among contractors for each major component, including the integrated missile." $65 million was awarded for the submarine-launched ballistic missile modernization.
On 2 October 1981, President Reagan called for the modernization of the strategic forces. The Defense Department directed the Navy to fund all development of the Trident II D5 missile with a December 1989 IOC. All research and development efforts would be directed toward "a new development, advanced technology, high accuracy Trident II D5 system." In December 1982, Deputy SECDEF Frank Carlucci advised the Secretary of Defense Caspar Weinberger to include funding for a new reentry vehicle–warhead combination for Trident II. The reentry vehicle was to be designated as the Mk 5, which was to have a greater yield than the Mk 4. The development contract for Trident II was issued in October 1983. On 28 December 1983, the deputy SECDEF authorized the Navy to proceed with full-scale engineering development of the Trident II D5.
An initial series of 19 land-based Trident II launches took place from Cape Canaveral Launch Complex 46 from 15 January 1987 to 27 January 1989. The first submarine launch was attempted by USS Tennessee, the first D-5 ship of the Ohio class, on 21 March 1989 off the coast of Cape Canaveral, Florida. The launch attempt failed four seconds into the flight because the plume of water following the missile rose to a greater height than expected, and water was in the nozzle when the motor ignited. Once the problem was understood, relatively simple changes were quickly made, but the problem delayed the initial operating capability of Trident II until March 1990. IOC for Strategic Weapons Facility Pacific (SWFPAC) was completed on schedule in 2001, allowing Trident II SSBN to be deployed in the Pacific theater.