Hubbry Logo
search
search button
Sign in
Historyarrow-down
starMorearrow-down
Hubbry Logo
search
search button
Sign in
Adelaide Depot
Community hub for the Wikipedia article
logoWikipedian hub
Welcome to the community hub built on top of the Adelaide Depot Wikipedia article. Here, you can discuss, collect, and organize anything related to Adelaide Depot. The purpose of the hub is to connect people, foster deeper knowledge, and help improve the root Wikipedia article.
Add your contribution
Inside this hub
Adelaide Depot

Adelaide Depot (Translink)
Location
LocationAdelaide Depot, Building B,8 Falcon Road, Belfast, BT12 6PU
Coordinates54°34′33″N 5°57′29″W / 54.57585468106125°N 5.957970035938911°W / 54.57585468106125; -5.957970035938911
Characteristics
OwnerNI Railways
TypeDMU
Rolling stock
Routes servedBangor
Derry~Londonderry
Dublin Only Class 3000
Larne
Portadown/Newry
History
Opened2012

Adelaide Depot is a significant railway maintenance facility operated by Northern Ireland Railways (NIR). It is situated adjacent to Adelaide railway station along the Belfast–Dublin railway line in Belfast, Northern Ireland. The depot primarily serves as a maintenance, refuelling, washing, and stabling location for NIR's diesel multiple unit (DMU) fleet.

History

[edit]

Constructed between April 2011 and September 2012, the Adelaide Depot occupies the site of a former freight terminal.[1][failed verification] The £15.6 million project, executed by GRAHAM Construction, was completed on time and within budget over 18 months.[citation needed] The depot received a Gold Award from the Considerate Constructors Scheme (CCS) and a commendation from RICS for Design and Innovation.[2][failed verification]

This state-of-the-art facility was developed to relieve pressure on Translink’s existing train maintenance operations and to support its growing fleet of Class 3000 and Class 4000 trains. Translink’s Fleet Engineer, Richard Noble, highlighted the importance of the facility as a modern and well-designed space that accommodates staff needs and efficient component movement.[3][4]

Facilities

[edit]

Spanning 20,000 m², Adelaide Depot comprises a 5,100 m² maintenance building and 1,600 meters of railway track. It includes a two-road running shed, five stabling sidings, a fuelling apron, train washing systems, and sidings allocated for Permanent Way equipment.[5]

The depot is engineered to support train lengths up to 138 meters and features six operational roads with a cumulative track length of around 2,000 meters. Six pit roads are available for regular and emergency maintenance. Other facilities include:

  • Three fuelling tanks with a combined capacity of 105,000 litres using Banlaw safety fittings
  • A 9,000-litre AdBlue tank with ZVA forecourt nozzle
  • Sanding silos with 4-inch quick-release fittings
  • A train wash capable of handling 20-tonne axle loads

The depot incorporates sustainable technologies such as energy-efficient lighting, solar panels, grey water harvesting systems, and durable alternative concrete troughs for cable management, praised for both aesthetics and resilience.[5][failed verification]

[edit]

See also

[edit]

References

[edit]
Add your contribution
Related Hubs