Recent from talks
Contribute something to knowledge base
Content stats: 0 posts, 0 articles, 1 media, 0 notes
Members stats: 0 subscribers, 0 contributors, 0 moderators, 0 supporters
Subscribers
Supporters
Contributors
Moderators
Hub AI
Battle of Morval AI simulator
(@Battle of Morval_simulator)
Hub AI
Battle of Morval AI simulator
(@Battle of Morval_simulator)
Battle of Morval
The Battle of Morval, 25–28 September 1916, was an attack during the Battle of the Somme by the British Fourth Army on the villages of Morval, Gueudecourt and Lesbœufs held by the German 1st Army, which had been the final objectives of the Battle of Flers–Courcelette (15–22 September). The main British attack was postponed to combine with attacks by the French Sixth Army on the village of Combles south of Morval.
The attack was to close up to the German defences between Moislains and Le Transloy, near the Péronne–Bapaume road (N 17). The combined attack from the Somme river northwards to Martinpuich on the Albert–Bapaume road, was also intended to deprive the German defenders further west near Thiepval of reinforcements, before an attack by the Reserve Army, due on 26 September. The postponement was extended from 21 to 25 September because of rain, which affected operations more frequently during September.
Combles, Morval, Lesbœufs and Gueudecourt were captured and many casualties inflicted on the Germans. The French made slower progress near the inter-army boundary, due to the obstruction of St Pierre Vaast Wood to the French attack north towards Sailly and Sailly-Saillisel. The inter-army boundary was moved north from 27 to 28 September, to allow the French more room to deploy their forces but the great quantity of German artillery-fire limited the French advance. The Fourth Army advance on 25 September was its deepest since 14 July and left the Germans in severe difficulties, particularly in a salient which developed to the north-east of Combles.
Tiredness and lack of reserves prevented the Fourth Army exploiting its success beyond patrolling and cavalry probes. The Reserve Army attack began on 26 September, at the Battle of Thiepval Ridge. Deteriorating weather and the shorter days greatly increased British and French transport difficulties; rain and fog grounded aircraft and impeded artillery observation. Mud reduced the blast effect of shells and immobilised infantry, which was an advantage to the defenders. A small number of tanks joined in the battle later in the afternoon, after having been held back because of the later start, reducing a number of German strong points, which had withstood earlier attacks.
At the beginning of August, optimistic that the Brusilov Offensive would continue to absorb German and Austro-Hungarian reserves and that the Germans had abandoned their offensive at Verdun, Sir Douglas Haig advocated to the War Committee in London, that relentless pressure be kept on the German armies in France for as long as possible. Haig had hoped that the delay in producing tanks had been overcome and that enough would be ready to be used in September. Despite the small numbers of tanks available and the limited time for the training of crews by September 1916, Haig had committed them in the Battle of Flers–Courcelette, in view of the importance of the general Allied offensive being conducted on the Western Front in France, by Italy against the Austro-Hungarians and by Brusilov in Russia, which could not continue indefinitely. Haig had believed that the German defence of the Somme front was weakening and that by mid-September might collapse altogether.
After the attacks of 12 and 15 September, Foch and Haig kept the Germans off balance, by mounting smaller operations. The British 6th Division captured the Quadrilateral north of Combles on 18 September. While the French Sixth and the Fourth Army prepared to resume larger attacks, the French Tenth Army to the south of the Somme captured Berny, Vermandovillers, Déniecourt and took several thousand prisoners. On the nights of 19 and 20 September, parties of the 56th (1/1st London) Division consolidated a line west and north-east of Combles, from Beef Trench to Middle Copse. The new trench was dug north-east to a tram line near the junction of the Ginchy–Morval road, which connected Middle Copse with the Quadrilateral further north, creating a line 900 yd (820 m) long facing Bouleaux Wood. The division was ready to attack from Combles to Leuze Wood and Bouleaux Wood to envelop Bouleaux Wood and avoid a costly fight at close-quarters.
Careful planning for the Anglo-French attack was necessary, due to the French Sixth Army advance diverging to the east and north-east. The attack northwards at Combles to keep touch with the British needed reinforcements, which were taken from the Tenth Army on the south bank. More artillery and aircraft were brought from Verdun and VII Corps was relieved; V, VI and XXXII corps entered the line (which had become 12 km (7.5 mi) longer, since the advance of 12 September) between I and XXXIII corps, increasing the Sixth Army to five corps. The resumption of the general attack was planned for 21 September but poor weather forced a delay until 25 September. The preliminary bombardment began on 24 September but a thick autumn mist in the morning and hazy conditions all day, reduced the amount of counter-battery fire that could be delivered. Late on 25 September, after the Sixth Army had been held up by the fire power of the German forces north of St Quentin, Foch arranged a northward move of the inter-army boundary, so that the I and XXXII Corps could attack Sailly-Saillisel from the south, with V Corps as right flank guard. A conference at the British Fourth Army headquarters on 26 September, arranged the move of the inter-army boundary to run from Lesbœufs, north-east towards Rocquigny.
Foch intended to resume the French attack from Mont St Quentin, east of the Somme bend to Combles, at the boundary with the British Fourth Army. The Sixth Army was to advance 3,000 yd (1.7 mi; 2.7 km), close to the German line running from Moislains to Le Transloy. In the south, VI and XXXIII corps would advance east and south-east, to establish a defensive flank along the Tortille stream, menacing Péronne from the north. V and VI corps would capture the south of Bois St Pierre Vaast (St Pierre Vaast Wood) and southern Saillisel, while I Corps and XXXII Corps advanced east to take Rancourt, the rest of Saillisel and the Wood, Frégicourt and Sailly-Saillisel. Distant objectives east of the Péronne–Bapaume road were selected, should the German defence collapse and the cavalry was made ready to prolong an advance.
Battle of Morval
The Battle of Morval, 25–28 September 1916, was an attack during the Battle of the Somme by the British Fourth Army on the villages of Morval, Gueudecourt and Lesbœufs held by the German 1st Army, which had been the final objectives of the Battle of Flers–Courcelette (15–22 September). The main British attack was postponed to combine with attacks by the French Sixth Army on the village of Combles south of Morval.
The attack was to close up to the German defences between Moislains and Le Transloy, near the Péronne–Bapaume road (N 17). The combined attack from the Somme river northwards to Martinpuich on the Albert–Bapaume road, was also intended to deprive the German defenders further west near Thiepval of reinforcements, before an attack by the Reserve Army, due on 26 September. The postponement was extended from 21 to 25 September because of rain, which affected operations more frequently during September.
Combles, Morval, Lesbœufs and Gueudecourt were captured and many casualties inflicted on the Germans. The French made slower progress near the inter-army boundary, due to the obstruction of St Pierre Vaast Wood to the French attack north towards Sailly and Sailly-Saillisel. The inter-army boundary was moved north from 27 to 28 September, to allow the French more room to deploy their forces but the great quantity of German artillery-fire limited the French advance. The Fourth Army advance on 25 September was its deepest since 14 July and left the Germans in severe difficulties, particularly in a salient which developed to the north-east of Combles.
Tiredness and lack of reserves prevented the Fourth Army exploiting its success beyond patrolling and cavalry probes. The Reserve Army attack began on 26 September, at the Battle of Thiepval Ridge. Deteriorating weather and the shorter days greatly increased British and French transport difficulties; rain and fog grounded aircraft and impeded artillery observation. Mud reduced the blast effect of shells and immobilised infantry, which was an advantage to the defenders. A small number of tanks joined in the battle later in the afternoon, after having been held back because of the later start, reducing a number of German strong points, which had withstood earlier attacks.
At the beginning of August, optimistic that the Brusilov Offensive would continue to absorb German and Austro-Hungarian reserves and that the Germans had abandoned their offensive at Verdun, Sir Douglas Haig advocated to the War Committee in London, that relentless pressure be kept on the German armies in France for as long as possible. Haig had hoped that the delay in producing tanks had been overcome and that enough would be ready to be used in September. Despite the small numbers of tanks available and the limited time for the training of crews by September 1916, Haig had committed them in the Battle of Flers–Courcelette, in view of the importance of the general Allied offensive being conducted on the Western Front in France, by Italy against the Austro-Hungarians and by Brusilov in Russia, which could not continue indefinitely. Haig had believed that the German defence of the Somme front was weakening and that by mid-September might collapse altogether.
After the attacks of 12 and 15 September, Foch and Haig kept the Germans off balance, by mounting smaller operations. The British 6th Division captured the Quadrilateral north of Combles on 18 September. While the French Sixth and the Fourth Army prepared to resume larger attacks, the French Tenth Army to the south of the Somme captured Berny, Vermandovillers, Déniecourt and took several thousand prisoners. On the nights of 19 and 20 September, parties of the 56th (1/1st London) Division consolidated a line west and north-east of Combles, from Beef Trench to Middle Copse. The new trench was dug north-east to a tram line near the junction of the Ginchy–Morval road, which connected Middle Copse with the Quadrilateral further north, creating a line 900 yd (820 m) long facing Bouleaux Wood. The division was ready to attack from Combles to Leuze Wood and Bouleaux Wood to envelop Bouleaux Wood and avoid a costly fight at close-quarters.
Careful planning for the Anglo-French attack was necessary, due to the French Sixth Army advance diverging to the east and north-east. The attack northwards at Combles to keep touch with the British needed reinforcements, which were taken from the Tenth Army on the south bank. More artillery and aircraft were brought from Verdun and VII Corps was relieved; V, VI and XXXII corps entered the line (which had become 12 km (7.5 mi) longer, since the advance of 12 September) between I and XXXIII corps, increasing the Sixth Army to five corps. The resumption of the general attack was planned for 21 September but poor weather forced a delay until 25 September. The preliminary bombardment began on 24 September but a thick autumn mist in the morning and hazy conditions all day, reduced the amount of counter-battery fire that could be delivered. Late on 25 September, after the Sixth Army had been held up by the fire power of the German forces north of St Quentin, Foch arranged a northward move of the inter-army boundary, so that the I and XXXII Corps could attack Sailly-Saillisel from the south, with V Corps as right flank guard. A conference at the British Fourth Army headquarters on 26 September, arranged the move of the inter-army boundary to run from Lesbœufs, north-east towards Rocquigny.
Foch intended to resume the French attack from Mont St Quentin, east of the Somme bend to Combles, at the boundary with the British Fourth Army. The Sixth Army was to advance 3,000 yd (1.7 mi; 2.7 km), close to the German line running from Moislains to Le Transloy. In the south, VI and XXXIII corps would advance east and south-east, to establish a defensive flank along the Tortille stream, menacing Péronne from the north. V and VI corps would capture the south of Bois St Pierre Vaast (St Pierre Vaast Wood) and southern Saillisel, while I Corps and XXXII Corps advanced east to take Rancourt, the rest of Saillisel and the Wood, Frégicourt and Sailly-Saillisel. Distant objectives east of the Péronne–Bapaume road were selected, should the German defence collapse and the cavalry was made ready to prolong an advance.