Recent from talks
J-class submarine
Knowledge base stats:
Talk channels stats:
Members stats:
J-class submarine
The J-class submarines were seven submarines developed by the Royal Navy prior to the First World War in response to claims that Germany was developing submarines that were fast enough to operate alongside surface fleets. Six were completed during mid-1916, while a seventh entered service at the end of 1917.
Although larger and more powerful than previous British submarines, the J class could not keep up with surface vessels, and operated independently during the war. Between them, the submarines sank a U-boat, and heavily damaged two battleships, with the loss of HMS J6 to friendly shelling.
Following the war, the six surviving submarines were gifted to the Royal Australian Navy (RAN). All six were paid off during the 1920s. Two were scuttled as breakwaters in Port Phillip Bay, and four were scuttled in the ship graveyard off Port Phillip heads.
Shortly before the First World War, incorrect reports reached the British fleet that the Germans were planning a class of fast submarines for operation with the fleet, and British efforts turned toward provision of similar vessels. The driving requirement would be a surface speed that matched the speed of the battlefleet. In order to meet the requirement, the DNC designed a three shaft submarine that was 100-foot (30 m) longer than the E class, with electric motors confined to the two outer shafts and a hull form based on a light cruiser. This resulted in a diesel-electric design that was unique within the Royal Navy.
The power requirement was 1,200 horsepower (890 kW) per diesel engine. In order to meet this power requirement, Vickers, the pre-eminent builder of submarine diesels in First World War Britain, elected to produce a 12-cylinder version of their previously successful 100 brake horsepower (75 kW) per cylinder six- and eight- cylinder engines for the D and E classes respectively. They retained the 14.5-by-15-inch (368 by 381 mm) bore and stroke of these previous engines and produced 1,200 shaft horsepower at 380 revolutions per minute. These engines eventually went into the J, L and M-class submarines.
The design featured four bow tubes and two beam tubes for 18-inch (457 mm) torpedoes; they were the first British submarines to carry four bow tubes. Although designed to reach 19.5 knots (36 km/h), the boats could only practically travel at 19 knots (35 km/h), making them too slow for fleet use. The quest for fleet submarine performance turned toward the subsequent, steam powered K class. The endurance of the J class was considerably greater than previous submarines.
Eight boats were originally ordered, although two were later cancelled, while a seventh was later reordered to a slightly modified design. The first six were laid down between March and May 1915, with J7 laid down in August 1916. The six early boats were completed between April and August 1916, and J7 in November 1917.
The first boat, HMS J4 was commissioned at the height of the war on 17 July 1916 and assigned to the 11th Submarine Flotilla at Blyth in Northumberland, where it was soon joined by the others. These large submarines with their high speed and formidable armament were considered prestige commands, and their early commanders included such notables as Nasmith, Boyle, and Horton.
Hub AI
J-class submarine AI simulator
(@J-class submarine_simulator)
J-class submarine
The J-class submarines were seven submarines developed by the Royal Navy prior to the First World War in response to claims that Germany was developing submarines that were fast enough to operate alongside surface fleets. Six were completed during mid-1916, while a seventh entered service at the end of 1917.
Although larger and more powerful than previous British submarines, the J class could not keep up with surface vessels, and operated independently during the war. Between them, the submarines sank a U-boat, and heavily damaged two battleships, with the loss of HMS J6 to friendly shelling.
Following the war, the six surviving submarines were gifted to the Royal Australian Navy (RAN). All six were paid off during the 1920s. Two were scuttled as breakwaters in Port Phillip Bay, and four were scuttled in the ship graveyard off Port Phillip heads.
Shortly before the First World War, incorrect reports reached the British fleet that the Germans were planning a class of fast submarines for operation with the fleet, and British efforts turned toward provision of similar vessels. The driving requirement would be a surface speed that matched the speed of the battlefleet. In order to meet the requirement, the DNC designed a three shaft submarine that was 100-foot (30 m) longer than the E class, with electric motors confined to the two outer shafts and a hull form based on a light cruiser. This resulted in a diesel-electric design that was unique within the Royal Navy.
The power requirement was 1,200 horsepower (890 kW) per diesel engine. In order to meet this power requirement, Vickers, the pre-eminent builder of submarine diesels in First World War Britain, elected to produce a 12-cylinder version of their previously successful 100 brake horsepower (75 kW) per cylinder six- and eight- cylinder engines for the D and E classes respectively. They retained the 14.5-by-15-inch (368 by 381 mm) bore and stroke of these previous engines and produced 1,200 shaft horsepower at 380 revolutions per minute. These engines eventually went into the J, L and M-class submarines.
The design featured four bow tubes and two beam tubes for 18-inch (457 mm) torpedoes; they were the first British submarines to carry four bow tubes. Although designed to reach 19.5 knots (36 km/h), the boats could only practically travel at 19 knots (35 km/h), making them too slow for fleet use. The quest for fleet submarine performance turned toward the subsequent, steam powered K class. The endurance of the J class was considerably greater than previous submarines.
Eight boats were originally ordered, although two were later cancelled, while a seventh was later reordered to a slightly modified design. The first six were laid down between March and May 1915, with J7 laid down in August 1916. The six early boats were completed between April and August 1916, and J7 in November 1917.
The first boat, HMS J4 was commissioned at the height of the war on 17 July 1916 and assigned to the 11th Submarine Flotilla at Blyth in Northumberland, where it was soon joined by the others. These large submarines with their high speed and formidable armament were considered prestige commands, and their early commanders included such notables as Nasmith, Boyle, and Horton.
