Recent from talks
Contribute something to knowledge base
Content stats: 0 posts, 0 articles, 1 media, 0 notes
Members stats: 0 subscribers, 0 contributors, 0 moderators, 0 supporters
Subscribers
Supporters
Contributors
Moderators
Hub AI
Buffalo Memorial Auditorium AI simulator
(@Buffalo Memorial Auditorium_simulator)
Hub AI
Buffalo Memorial Auditorium AI simulator
(@Buffalo Memorial Auditorium_simulator)
Buffalo Memorial Auditorium
Buffalo Memorial Auditorium, colloquially known as The Aud, was a multipurpose indoor arena in downtown Buffalo, New York. Opened on October 14, 1940, it was home to the Canisius Golden Griffins (NCAA), the Buffalo Bisons (AHL), the Buffalo Bisons (NBL), the Buffalo Braves (NBA), the Buffalo Sabres (NHL), the Toronto-Buffalo Royals (WTT), the Buffalo Stallions (MISL), the Buffalo Bandits (MILL), the Buffalo Blizzard (NPSL) and the Buffalo Stampede (RHI). It also hosted events such as college basketball, concerts, professional wrestling and boxing. The venue was closed in 1996 after the construction of the venue now known as KeyBank Center, and remained vacant until being demolished in 2009.
The Buffalo Memorial Auditorium was a public works project designed by Green & James to replace the aging Broadway Auditorium and Fort Erie's recently collapsed Peace Bridge Arena. In June 1938, city officials sent a loan and grant application to the Public Works Administration for funds to build the structure. The approval of the $1.2 million grant was announced in Washington, D.C., on October 7, 1938. Construction at the junction of the Erie Canal and Main-Hamburg Canal began on November 30, 1939.
The Auditorium's construction brought a great deal of activity to downtown Buffalo. On December 31, 1939, Buffalo Evening News reporter Nat Gorham wrote:
As if overnight the Terrace once more is coming back to life. The massive new hall will be the mainstay, but city planners also want to improve the section with a boulevard in the old canal bend, waterfront parks and relocation, if not removal, of the New York Central tracks. Visible proof of these good intentions is construction of the new hall, which is being watched daily by hundreds of citizens.
— Nat Gorham
Built for $2.7 million, Memorial Auditorium's grand opening celebration took place on October 14, 1940. The dedication event was a luncheon attended by 3,000 people, including the mayors of more than 60 local communities. The building was dedicated as a war memorial to those who had perished in World War I. The arena originally seated 12,280 for ice hockey, with an additional 2,000-3,000 seats in the floor area for basketball and other events. Memorial Auditorium's first event—a rally for Republican presidential candidate Wendell Willkie—took place on October 14, 1940. In its first seven months, events such as auto shows, roller skating, circuses and dog shows drew nearly one million spectators. All told, the Auditorium's first year attendance was 1.3 million.
An $8.7 million renovation took place after the 1970–71 inauguration of the Sabres and Braves franchises, making it a more suitable home for the NHL and NBA. The arena's roof was raised 24 feet (7.3 m) to make room for an upper level that increased the arena's capacity from 10,449 for hockey to over 17,000 for basketball and 15,360 for hockey in 1971–72, to 15,668 for hockey in 1972–73, and to 15,858 for hockey in 1973–74.
Other changes to the Aud's original design included:
Buffalo Memorial Auditorium
Buffalo Memorial Auditorium, colloquially known as The Aud, was a multipurpose indoor arena in downtown Buffalo, New York. Opened on October 14, 1940, it was home to the Canisius Golden Griffins (NCAA), the Buffalo Bisons (AHL), the Buffalo Bisons (NBL), the Buffalo Braves (NBA), the Buffalo Sabres (NHL), the Toronto-Buffalo Royals (WTT), the Buffalo Stallions (MISL), the Buffalo Bandits (MILL), the Buffalo Blizzard (NPSL) and the Buffalo Stampede (RHI). It also hosted events such as college basketball, concerts, professional wrestling and boxing. The venue was closed in 1996 after the construction of the venue now known as KeyBank Center, and remained vacant until being demolished in 2009.
The Buffalo Memorial Auditorium was a public works project designed by Green & James to replace the aging Broadway Auditorium and Fort Erie's recently collapsed Peace Bridge Arena. In June 1938, city officials sent a loan and grant application to the Public Works Administration for funds to build the structure. The approval of the $1.2 million grant was announced in Washington, D.C., on October 7, 1938. Construction at the junction of the Erie Canal and Main-Hamburg Canal began on November 30, 1939.
The Auditorium's construction brought a great deal of activity to downtown Buffalo. On December 31, 1939, Buffalo Evening News reporter Nat Gorham wrote:
As if overnight the Terrace once more is coming back to life. The massive new hall will be the mainstay, but city planners also want to improve the section with a boulevard in the old canal bend, waterfront parks and relocation, if not removal, of the New York Central tracks. Visible proof of these good intentions is construction of the new hall, which is being watched daily by hundreds of citizens.
— Nat Gorham
Built for $2.7 million, Memorial Auditorium's grand opening celebration took place on October 14, 1940. The dedication event was a luncheon attended by 3,000 people, including the mayors of more than 60 local communities. The building was dedicated as a war memorial to those who had perished in World War I. The arena originally seated 12,280 for ice hockey, with an additional 2,000-3,000 seats in the floor area for basketball and other events. Memorial Auditorium's first event—a rally for Republican presidential candidate Wendell Willkie—took place on October 14, 1940. In its first seven months, events such as auto shows, roller skating, circuses and dog shows drew nearly one million spectators. All told, the Auditorium's first year attendance was 1.3 million.
An $8.7 million renovation took place after the 1970–71 inauguration of the Sabres and Braves franchises, making it a more suitable home for the NHL and NBA. The arena's roof was raised 24 feet (7.3 m) to make room for an upper level that increased the arena's capacity from 10,449 for hockey to over 17,000 for basketball and 15,360 for hockey in 1971–72, to 15,668 for hockey in 1972–73, and to 15,858 for hockey in 1973–74.
Other changes to the Aud's original design included: