Hubbry Logo
search
logo

Building regulations approval

logo
Community Hub0 Subscribers
Write something...
Be the first to start a discussion here.
Be the first to start a discussion here.
See all
Building regulations approval

To comply with the Building Act 1984 and the subsequent statutory instruments known as the Building Regulations, Building regulations approval is required to construct certain structures in England and Wales. Construction projects falling into this category are sometimes referred to as "notifiable", however this is different from the "notification" (which may also be required under the Construction (Design and Management) Regulations 2015, which seeks to monitor health and safety in construction projects.

The rules vary for Scotland and Northern Ireland, but elsewhere Building Regulations approval can usually be obtained by application to a building control body (BCB), of which there are two types: local Authority BCBs (usually a council's building control department) and private BCBs (known as Approved Inspectors). If an Approved Inspector is used, before any controlled building work can start on site they must inform the local authority about the work. This is called giving an 'initial notice'. This notice states that a particular Approved Inspector is the BCB for the specified works, at the specified location.

If using a local authority, approval can be obtained in 1 of 3 ways:-

By the "full plans" method where drawings are deposited with the Local Authority and are subsequently checked for compliance with the Building Regulations.

The various stages of the work are also inspected and checked for compliance with the relevant technical requirements of the Building Regulations; by a Building Control Surveyor employed by the Local Authority.

This is the most thorough option. And a response from the Local Authority will typically take 4–8 weeks. However, unlike planning permission, work may start before approval has been granted. It is also quite usual for the final building to differ in some respects to that which received full plans approval, in which case amended "as built" plans are often required to be submitted to the Local Authority. A "completion certificate" is issued upon completion, as long as the completed work complies with the Building Regulations.

By the "building notice" method where notice of commencement of (minor) building work is given to the Local Authority at least two days prior to commencement of work. The various stages of the work are then inspected and approved by the Local Authority but no plans are checked.

This method may not be used if the premises contain a workplace, or creates new flats.

See all
User Avatar
No comments yet.