Hubbry Logo
logo
California State Route 65
Community hub

California State Route 65

logo
0 subscribers
Be the first to start a discussion here.
Be the first to start a discussion here.
Contribute something to knowledge base
Hub AI

California State Route 65 AI simulator

(@California State Route 65_simulator)

California State Route 65

State Route 65 (SR 65) is a north-south state highway in the U.S. state of California that consists of two non-contiguous segments in the Central Valley. The route, originally known as the Eastside Freeway, was envisioned as a major freeway following the east side of the valley near the foothills of the Sierra Nevada, similar to the Westside Freeway (Interstate 5) on the opposite side of the valley. Of the estimated 300 miles (480 km), only 95 miles (153 km) were constructed due to funding issues, environmental concerns, and low population growth.

The southern segment begins at SR 99, near Bakersfield and terminates at SR 198 near Exeter. It also serves the communities of Oildale, Ducor, Terra Bella, Porterville, Strathmore, and Lindsay. The northern segment begins at Interstate 80 in Roseville and terminates at SR 70 at Olivehurst. It also serves the communities of Rocklin, Lincoln, and Wheatland. If built, the center segment would serve the communities of Ivanhoe, Reedley, Sanger, Waterford, and Oakdale.

SR 65 is part of the California Freeway and Expressway System; the southern segment as well as the northern segment in Roseville and near Yuba City are part of the National Highway System, a network of highways that are considered essential to the country's economy, defense, and mobility by the Federal Highway Administration.

The southern segment of State Route 65 begins at a partial interchange with State Route 99 north of Bakersfield. From here to Porterville is a mostly 40-mile (64 km) rural two-lane highway through hills and grasslands while passing through the communities of Ducor and Terra Bella. This stretch of roadway is often considered very dangerous given the heavy amount of semi-trucks that drive this corridor. SR 65 expands to a four-lane freeway through Porterville, downgrading into a four-lane expressway upon leaving the city. The highway remains an expressway, passing Strathmore and up to Lindsay. The highway is then reduced to a rural two-lane highway through agricultural areas while passing through Exeter. SR 65's southern segment ends at the junction of State Route 198. This section has been designated the All America City Highway.

The northern segment of State Route 65 begins at the interchange with Interstate 80 in Roseville as a freeway heading northwest to Blue Oaks Boulevard where the freeway turns north towards Lincoln. It turns northwest briefly onto a bypass of Lincoln at Industrial Avenue/Lincoln Boulevard (the state route's former alignment) where it then turns west as the freeway ends at Nelson Lane. The highway is then downgraded to a four-lane expressway, turning north again, downgraded further to a two-lane highway, until it meets up with its original alignment just north of the community of Sheridan. After passing through Wheatland, it assumes its freeway designation a few miles north of the town, ending at State Route 70 in Olivehurst.

In 2000, Caltrans issued a Project Study Report (PSR) that analyzed six alternative alignments for the proposed Wheatland Bypass. After extensive public meetings, Caltrans identified Alternative E as the preferred alternative. Alternative E would start at the northern end of the Lincoln Bypass, and proceed due north, crossing the Bear River on a new bridge to the east of the existing SR 65 alignment. It would bypass Wheatland to the east, and then turn west and pass along the southern edge of Beale Air Force Base before connecting to south end of the freeway segment at South Beale Road. If completed, the Wheatland Bypass would enable continuous freeway travel from I-80 to Marysville (via SR 70). Although Caltrans completed the PSR in 2000 that identified the preferred alignment, the Wheatland Bypass remains unfunded. State and local officials cannot present a timetable for completing the bypass until $300 million is secured to complete the required environmental studies and construction.

North of its present northern terminus at SR 70 in Olivehurst, the legislative designation of SR 65 continues west/northwest to SR 99 in (or south of) Yuba City. Caltrans has planned since 1986 to extend SR 65 as a freeway west or northwest from SR 70 to SR 99 via a third bridge across the Feather River south of Yuba City to alleviate traffic on the two existing bridges between Yuba City and Marysville. Funding issues and environmental concerns have stalled the extension of SR 65 to Yuba City and the third Feather River Bridge.

The initial segment was created in 1933 as Legislative Route 129. It was defined from LRN 4 (formerly US 99 and currently SR 99) near Bakersfield to LRN 263 (currently SR 180) in Kings Canyon National Park. The entire route was signed Route 65.

See all
highway in California
User Avatar
No comments yet.