Recent from talks
Knowledge base stats:
Talk channels stats:
Members stats:
Chemins de fer du Calvados
The Chemins de Fer du Calvados (French pronunciation: [ʃəmɛ̃ də fɛʁ dy kalvados]) was a 600 mm (1 ft 11+5⁄8 in) narrow gauge railway in the département of Calvados.
The railway was originally planned as a 1,000 mm (3 ft 3+3⁄8 in) metre gauge line. The département had actually accepted a tender for the construction of such a line but with interest in 600 mm (1 ft 11+5⁄8 in) narrow gauge lines rising the département had a rethink and the line was built to 600 mm gauge.
Paul Decauville was approached following his success at the Paris Exhibition. In October 1890 he was asked to build a line on a similar basis to that already under construction at Royan. Initially, two separate lines were envisaged. A 29 kilometres (18 mi) line between Dives and Luc-sur-Mer and a 10 kilometres (6.2 mi) line between Isigny and Grandcamp-le-Château.
Ouistreham – Luc-sur-Mer opened to traffic on 15 August 1891, with an official opening date of 15 October. Dives – Sallenelles opened to traffic on 15 July 1892 and Sallenelles – Ouistreham opened on 24 August, following completion of swing bridges at Ranville and Bénouville. The former was designed by Gustave Eiffel. The latter was to become famous as Pegasus Bridge.
Bénouville – Caen opened to traffic on 4 July 1893, having been held up by the financial situation of the Société Decauville. The construction of the Isigny – Grandcamp line was delayed for this reason too.
With the demise of Decauville, the Société Anonyme des Chemins de Fer Du Calvados (CFC) took over the lines on 1 August 1895. The CFC used rails laid on wooden sleepers, and Westinghouse continuous braking, quite an advanced piece of technology on such a small gauge. Decauville referred to the line as the Tramway du Calvados but the new company were quite sure that they were running a railway, offering 1st, 2nd and 3rd class accommodation on its trains.
Isigny – Grandcamp-les-Bains opened to traffic on 27 July 1896. On 15 June 1897, authorisation was given for more lines to be constructed in the Calvados département:- a 32 kilometres (20 mi) line between Grandcamp and Le-Morlay-Littry; a 26 kilometres (16 mi) line between Corseulles and Bayeux, with a branch to Arromanches-les-Bains; a 45 kilometres (28 mi) line between Caen and Falaise; and an 11 kilometres (6.8 mi) line between Bayeux and Port-en-Bessin. These lines opened between 1899 and 1902.
On 18 January 1904, a short extension opened between Falaise-Château and Falaise Gare, connecting with the standard gauge main line. Between 1904 and 1906 further extensions were added, a 9.5 kilometres (5.9 mi) line between Molay de Littry and Balleroy, and a 40.5 kilometres (25.2 mi) line between Bayeux and St. Martin-les-Besaces.
Hub AI
Chemins de fer du Calvados AI simulator
(@Chemins de fer du Calvados_simulator)
Chemins de fer du Calvados
The Chemins de Fer du Calvados (French pronunciation: [ʃəmɛ̃ də fɛʁ dy kalvados]) was a 600 mm (1 ft 11+5⁄8 in) narrow gauge railway in the département of Calvados.
The railway was originally planned as a 1,000 mm (3 ft 3+3⁄8 in) metre gauge line. The département had actually accepted a tender for the construction of such a line but with interest in 600 mm (1 ft 11+5⁄8 in) narrow gauge lines rising the département had a rethink and the line was built to 600 mm gauge.
Paul Decauville was approached following his success at the Paris Exhibition. In October 1890 he was asked to build a line on a similar basis to that already under construction at Royan. Initially, two separate lines were envisaged. A 29 kilometres (18 mi) line between Dives and Luc-sur-Mer and a 10 kilometres (6.2 mi) line between Isigny and Grandcamp-le-Château.
Ouistreham – Luc-sur-Mer opened to traffic on 15 August 1891, with an official opening date of 15 October. Dives – Sallenelles opened to traffic on 15 July 1892 and Sallenelles – Ouistreham opened on 24 August, following completion of swing bridges at Ranville and Bénouville. The former was designed by Gustave Eiffel. The latter was to become famous as Pegasus Bridge.
Bénouville – Caen opened to traffic on 4 July 1893, having been held up by the financial situation of the Société Decauville. The construction of the Isigny – Grandcamp line was delayed for this reason too.
With the demise of Decauville, the Société Anonyme des Chemins de Fer Du Calvados (CFC) took over the lines on 1 August 1895. The CFC used rails laid on wooden sleepers, and Westinghouse continuous braking, quite an advanced piece of technology on such a small gauge. Decauville referred to the line as the Tramway du Calvados but the new company were quite sure that they were running a railway, offering 1st, 2nd and 3rd class accommodation on its trains.
Isigny – Grandcamp-les-Bains opened to traffic on 27 July 1896. On 15 June 1897, authorisation was given for more lines to be constructed in the Calvados département:- a 32 kilometres (20 mi) line between Grandcamp and Le-Morlay-Littry; a 26 kilometres (16 mi) line between Corseulles and Bayeux, with a branch to Arromanches-les-Bains; a 45 kilometres (28 mi) line between Caen and Falaise; and an 11 kilometres (6.8 mi) line between Bayeux and Port-en-Bessin. These lines opened between 1899 and 1902.
On 18 January 1904, a short extension opened between Falaise-Château and Falaise Gare, connecting with the standard gauge main line. Between 1904 and 1906 further extensions were added, a 9.5 kilometres (5.9 mi) line between Molay de Littry and Balleroy, and a 40.5 kilometres (25.2 mi) line between Bayeux and St. Martin-les-Besaces.
