Clementi MRT station is an elevated Mass Rapid Transit (MRT) station on the East–West Line (EWL) in Clementi, Singapore. The station is located along Commonwealth Avenue West and serves landmarks such as the Clementi Mall, Clementi Bus Interchange, and Clementi Fire Station.

Built as part of Phase IA of the MRT system, the station opened on 12 March 1988. An oil spill on the tracks led to two trains colliding at the station on 5 August 1993. The station saw further upgrades, such as new half-height platform doors and fans above the platforms to improve ventilation, as well as new linkways which opened in 2018. In September 2022, it was announced that the station would become an interchange station with the Cross Island Line (CRL) as part of Phase 2 of the line.

Clementi station was first constructed as part of Phase IA of the MRT system, an 8.5-kilometre (5.3-mile) segment which spans from Tiong Bahru to this station. This segment was initially planned to be built as part of Phase II, but the completion date was pushed earlier to 1988 to increase Phase I's catchment area. The contract for the construction of Clementi station and 2 kilometres (1.2 miles) of viaducts was awarded to a joint venture between Lim Kah Ngam Construction and Aoki Corporation for S$48.7 million (US$66 million in 2022) in April 1985.

The station opened for a public preview on 27 and 28 February 1988, before operations commenced on 12 March that year. On the opening day, Clementi station was the most visited station among the Phase IA stations, with 80,000 recorded trips and 125,618 passengers.

In 2012, half-height platform screen doors was installed at this station as part of the Land Transport Authority's (LTA) programme to improve safety in MRT stations. High-volume low-speed fans were installed above the platforms of the station between 2012 and 2013 as part of a national programme to improve ventilation at station platforms.

Two new link bridges, along with new fare gates and escalators, opened in 2015 to improve connectivity to new flats near the station. Noise barriers were installed along the viaduct stretch from Clementi Road to Clementi station as part of a S$17 million (US$12.7 million) contract awarded to CKT Thomas Pte Ltd in January 2015. Another set of noise barriers from Clementi Avenue 4 to Lempeng Drive were installed from 2018 to 2020.

On the morning of 5 August 1993, two trains collided at the station after one became stalled at the station due to a technical fault. The crash left 156 people injured, eight of them seriously. The trains were taken out of service while engineers conducted checks on signalling equipment at the Clementi, Buona Vista, and Commonwealth stations. MRT operations resumed the next day. For further engineering checks between the Buona Vista and Clementi stations, trains at Buona Vista were not allowed to depart until the train at Clementi left; this restriction was lifted on 8 August.

An independent inquiry panel concluded that a damaged maintenance locomotive spilled oil on the tracks the morning of the crash. While workers were aware of the spill, the cleaning crew were delayed from accessing the tracks. Ten trains had experienced braking issues leading up to the crash. The stalled train used its emergency brakes to stop at Clementi station and needed to recharge its brake systems before moving off. The automatic braking system of the subsequent train failed to prevent the collision. As MRT staff had followed procedures, none faced disciplinary action as a result of the crash. The inquiry recommended increased inspections of locomotives and for the station master to look out for oil spills on tracks.