Controlled Demolition, Inc.

Controlled Demolition, Inc. (CDI) is a controlled demolition firm headquartered in Phoenix, Maryland. The firm was founded by Jack Loizeaux who used dynamite to remove tree stumps in the Baltimore, Maryland area, and moved on to using explosives to take down chimneys, overpasses and small buildings in the 1940s. The company has demolished several notable buildings by implosion, including the Gettysburg National Tower, the Seattle Kingdome, the Kingda Ka roller coaster at Six Flags Great Adventure, and the uncollapsed portion of the Champlain Towers South condominium.

The firm has claimed world records for a series of 1998 projects: The June 23 demolition of the 1,201-foot-high Omega Radio Tower in Trelew, Argentina, "the tallest manmade structure ever felled with explosives"; The August 16 implosion of the 17-building Villa Panamericana and Las Orquideas public housing complex in San Juan, Puerto Rico, "the most buildings shot in a single implosion sequence"; and the October 24 project at the J. L. Hudson Department Store in Detroit, Michigan, which at 439 feet (134 m) in height became "the tallest building & the tallest structural steel building ever imploded" and its 2,200,000 square feet (200,000 m2) making it "the largest single building ever imploded".

In 1990, the FDOT awarded a bid to Hardaway Company (owner of Controlled Demolition, Inc.) to demolish all steel and concrete sections of the old Sunshine Skyway spans. The scope of the project required that all underwater piles and piers, and surface roadway, girders, and beams, be dismantled. Special care had to be taken in removing underwater bridge elements near the channel, and the central portion of the original bridge had to be removed in one piece to minimize closure of the only approach to the busy Port of Tampa. Most of the concrete material was used to create an artificial reef near the southbound approach of the old bridge, which was converted into a long pier for newly created Skyway Fishing Pier State Park. Unused approaches to the original spans were demolished in 2008.

On May 23, 1995, the firm was responsible for the demolition of the Alfred P. Murrah Federal Building after its bombing on April 19, 1995.

On March 26, 2000, the firm used 4,450 pounds of dynamite placed in 5,905 carefully sited holes and 21.6 miles (34.8 km) of detonation cord inserted over a period of four months to take down the 25,000-ton concrete roof of the Kingdome in Seattle, Washington in 16.8 seconds, one day before the 24th birthday of the stadium that had been the home of the Seattle Mariners of Major League Baseball and the Seattle Seahawks of the National Football League. The total cost for the demolition project was $9 million. The firm planned the collapse of the roof to prevent its simultaneous free fall, creating a delay pattern that would break the roof into pieces and setting up 15-foot-high earth berms on the floor of the stadium to absorb the impact of the falling concrete. The demolition of the Kingdome established the record for the largest structure, by volume, ever demolished with explosives. The implosion of the 125,000-ton concrete structure did not cause a single crack in the foundation of the new stadium being built 90 feet (27 m) away.

CDI demolished the Gettysburg National Tower on July 3, 2000, which was the 137th anniversary of the final day of the Battle of Gettysburg. The demolition was done for free for the National Park Service. The tower was felled by 12 pounds (5.4 kg) of explosives in front of a crowd of 10,000.

On September 22, 2001, eleven days after the 9/11 attacks, a preliminary cleanup plan for the World Trade Center site was delivered by Controlled Demolition, Inc. in which Mark Loizeaux, president of CDI, emphasized the importance of protecting the slurry wall (known as "the bathtub") which kept the Hudson River from flooding the WTC's basement.

The tower was disassembled during late 2007 and early 2008. Demolition of the Mobile Service Structure (MSS), by means of a controlled explosion, occurred on 2008-04-27. National Geographic Channel: Man Made: Rocket Tower has a full episode on the demolition