Recent from talks
HMS Ocean (L12)
Knowledge base stats:
Talk channels stats:
Members stats:
HMS Ocean (L12)
HMS Ocean was a Landing Platform Helicopter, formerly the UK's helicopter carrier and the fleet flagship of the Royal Navy. She was designed to support amphibious landing operations and to support the staff of Commander UK Amphibious Force and Commander UK Landing Force. She was constructed in the mid-1990s by Kvaerner Govan on the River Clyde and fitted out by VSEL at Barrow-in-Furness prior to trials and subsequent acceptance in service. Ocean was commissioned in September 1998 at her home port HMNB Devonport, Plymouth.
In December 2017, the Brazilian Navy confirmed the purchase of the ship for £84.6 million. Following her decommissioning from Royal Navy service on 27 March 2018, she arrived in Rio de Janeiro on 25 August 2018, rechristened as the Atlântico and now serves as the flagship of the Brazilian Navy.
An invitation to tender for a new helicopter carrier was issued in February 1992. In February 1993 The Times reported that the carrier faced cancellation due to budgetary constraints. However, at approximately the same time, British forces were engaged in operations in the Balkans, which saw the Royal Fleet Auxiliary's aviation training ship RFA Argus pressed into service as an amphibious transport ship. Argus's accommodation and facilities proved inadequate for the needs of a large Embarked Military Force (EMF), which emphasised the need for a purpose-built platform. On 29 March 1993, the defence procurement minister announced that development of the new Landing Platform Helicopter (LPH) was proceeding. Two shipbuilders tendered for the contract – Vickers Shipbuilding and Engineering Ltd (VSEL) and Swan Hunter. On 11 May 1993, the government announced that VSEL had won the contract. The build was to commercial standards, reducing costs significantly and leading to a construction spend of £154 million (£396 million in 2023),, comparable to that of a Type 23 frigate. VSEL, a warship manufacturer, sub-contracted the build phase to the commercial Kværner yard in Govan, Glasgow.
That VSEL's bid was £71 million lower than Swan Hunter's was the source of political controversy and led to a National Audit Office investigation to determine whether the competition was fair. The report, published on 29 July 1993, stated that, although VSEL did subsidise its bid, the Ministry of Defence (MOD) was right to award the contract to VSEL because the subsidy was much smaller than the difference between the two bids; VSEL's bid was £139.5 million compared to Swan Hunter's £210.6 million. The Times also suggested that the subsidy was as little as £10 million. In anticipation of the report, the Financial Times described the different philosophies adopted by the two bidders; while Swan Hunter viewed the ship as entirely military, "VSEL thought the design was basically a merchant ship with military hardware bolted on." VSEL's decision to sub-contract the build phase took advantage of lower overheads at a civilian yard as well as efficiency drives by its parent, Kværner.
Launched on 11 October 1995, she was subsequently named at Barrow by Queen Elizabeth II on 20 February 1998, prior to delivery to Devonport. In her sea trial, she reached a maximum speed of 20.6 knots (38.2 km/h; 23.7 mph); however, her usual top speed is 18 knots (33 km/h; 21 mph).
Ocean was designed to provide the amphibious assault capabilities last offered by Albion and Bulwark. She can deploy an Embarked Military Force (EMF) of a Royal Marines Commando Group from 3 Commando Brigade supported by aircraft and landing craft. The ship's company included 9 Assault Squadron (9 ASRM) from 1 Assault Group Royal Marines whose primary role is as an Amphibious Assault Squadron. Secondary tasks include boarding parties, beach reconnaissance and providing amphibious knowledge to the ships Command. Besides these roles they have responsibilities within the ship which include firefighting, watchkeeping and security. 9 ASRM is divided into a HQ unit, Landing Craft Troop, Signals detachment, Vehicle Deck Party and Assault Supply Team.
HMS Ocean was also capable of limited anti-submarine warfare activities, supporting afloat training and acting as a base facility for other embarked forces including counter-terrorism units.
The ship was capable of carrying four to six Westland Apache AH1 helicopters operated by the Army Air Corps, as well as helicopters of the Fleet Air Arm (Seaking Mk4) and Royal Air Force, including the larger twin-rotor Boeing Chinook transports. Prior to their retirement, Ocean could transport up to fifteen fixed-wing Harrier V/STOL aircraft of Joint Force Harrier in the ferry role, but was unable to operate as a fixed-wing aircraft carrier because she lacked the ski jump that is needed to launch a fully loaded Harrier.[citation needed]
Hub AI
HMS Ocean (L12) AI simulator
(@HMS Ocean (L12)_simulator)
HMS Ocean (L12)
HMS Ocean was a Landing Platform Helicopter, formerly the UK's helicopter carrier and the fleet flagship of the Royal Navy. She was designed to support amphibious landing operations and to support the staff of Commander UK Amphibious Force and Commander UK Landing Force. She was constructed in the mid-1990s by Kvaerner Govan on the River Clyde and fitted out by VSEL at Barrow-in-Furness prior to trials and subsequent acceptance in service. Ocean was commissioned in September 1998 at her home port HMNB Devonport, Plymouth.
In December 2017, the Brazilian Navy confirmed the purchase of the ship for £84.6 million. Following her decommissioning from Royal Navy service on 27 March 2018, she arrived in Rio de Janeiro on 25 August 2018, rechristened as the Atlântico and now serves as the flagship of the Brazilian Navy.
An invitation to tender for a new helicopter carrier was issued in February 1992. In February 1993 The Times reported that the carrier faced cancellation due to budgetary constraints. However, at approximately the same time, British forces were engaged in operations in the Balkans, which saw the Royal Fleet Auxiliary's aviation training ship RFA Argus pressed into service as an amphibious transport ship. Argus's accommodation and facilities proved inadequate for the needs of a large Embarked Military Force (EMF), which emphasised the need for a purpose-built platform. On 29 March 1993, the defence procurement minister announced that development of the new Landing Platform Helicopter (LPH) was proceeding. Two shipbuilders tendered for the contract – Vickers Shipbuilding and Engineering Ltd (VSEL) and Swan Hunter. On 11 May 1993, the government announced that VSEL had won the contract. The build was to commercial standards, reducing costs significantly and leading to a construction spend of £154 million (£396 million in 2023),, comparable to that of a Type 23 frigate. VSEL, a warship manufacturer, sub-contracted the build phase to the commercial Kværner yard in Govan, Glasgow.
That VSEL's bid was £71 million lower than Swan Hunter's was the source of political controversy and led to a National Audit Office investigation to determine whether the competition was fair. The report, published on 29 July 1993, stated that, although VSEL did subsidise its bid, the Ministry of Defence (MOD) was right to award the contract to VSEL because the subsidy was much smaller than the difference between the two bids; VSEL's bid was £139.5 million compared to Swan Hunter's £210.6 million. The Times also suggested that the subsidy was as little as £10 million. In anticipation of the report, the Financial Times described the different philosophies adopted by the two bidders; while Swan Hunter viewed the ship as entirely military, "VSEL thought the design was basically a merchant ship with military hardware bolted on." VSEL's decision to sub-contract the build phase took advantage of lower overheads at a civilian yard as well as efficiency drives by its parent, Kværner.
Launched on 11 October 1995, she was subsequently named at Barrow by Queen Elizabeth II on 20 February 1998, prior to delivery to Devonport. In her sea trial, she reached a maximum speed of 20.6 knots (38.2 km/h; 23.7 mph); however, her usual top speed is 18 knots (33 km/h; 21 mph).
Ocean was designed to provide the amphibious assault capabilities last offered by Albion and Bulwark. She can deploy an Embarked Military Force (EMF) of a Royal Marines Commando Group from 3 Commando Brigade supported by aircraft and landing craft. The ship's company included 9 Assault Squadron (9 ASRM) from 1 Assault Group Royal Marines whose primary role is as an Amphibious Assault Squadron. Secondary tasks include boarding parties, beach reconnaissance and providing amphibious knowledge to the ships Command. Besides these roles they have responsibilities within the ship which include firefighting, watchkeeping and security. 9 ASRM is divided into a HQ unit, Landing Craft Troop, Signals detachment, Vehicle Deck Party and Assault Supply Team.
HMS Ocean was also capable of limited anti-submarine warfare activities, supporting afloat training and acting as a base facility for other embarked forces including counter-terrorism units.
The ship was capable of carrying four to six Westland Apache AH1 helicopters operated by the Army Air Corps, as well as helicopters of the Fleet Air Arm (Seaking Mk4) and Royal Air Force, including the larger twin-rotor Boeing Chinook transports. Prior to their retirement, Ocean could transport up to fifteen fixed-wing Harrier V/STOL aircraft of Joint Force Harrier in the ferry role, but was unable to operate as a fixed-wing aircraft carrier because she lacked the ski jump that is needed to launch a fully loaded Harrier.[citation needed]