The Hainan western ring railway (Chinese: 海南西环铁路; pinyin: Hǎinán xīhuán tiělù) is a standard-gauge railway running along the coast of the western half of Hainan Island in South China. It connects the provincial capital Haikou on the island's north coast with Sanya, the major city on Hainan's south coast. The rail line is 363.8 km long; its terminals are Haikou railway station and Sanya railway station. Cargo trains enter this railway from Zhanjiang, Guangdong, at the South Port of the Guangdong–Hainan Railway.
The Hainan Western Ring Railway has a long history, some of its sections dating to World War II. It has achieved its present form upon completing a major expansion and upgrade project in 2005. After that, the Hainan Western Ring Railway (including a few minor side branches) remained the island's only railway until the opening of the Hainan Eastern Ring high-speed Railway in 2010, which connects to the Western Ring at both endpoints.
As of 2019, the Hainan Western Ring Railway is primarily used for freight and has limited passenger service. The new Hainan Western Ring High-Speed Railway, primarily for passenger service, has been constructed along a fairly similar but slightly shorter (344 km) route.
The first railways on Hainan, which were later incorporated into the Hainan Western Ring Railway, were constructed during the Japanese occupation of the island during WWII. One of these lines connected the iron ore mine at Shilu with the Basuo Harbor on the island's west coast. The 53-km line was built in 1940–1942 to the Japanese 3 ft 6 in (1,067 mm) gauge, using the labor of some 50,000 Chinese workers. It was opened to traffic on April 7, 1942, but largely destroyed by a typhoon the same summer. After the typhoon, the line was rebuilt more capitalized and reopened in May 1943.
Another line constructed during the Japanese occupation ran along the island's southwestern coast, from Basuo to the Anyou port facilities (18°13′00″N 109°33′00″E / 18.21667°N 109.55000°E) in Sanya, via Huangliu and Lingtou (18°41′15″N 108°42′15″E / 18.68750°N 108.70417°E). This line was opened in March 1943.
After the Communists took over Hainan in April 1950, the narrow-gauge railways weren't used anymore, as they had been damaged beyond repair.
The Shilu–Basuo line was rehabilitated in 1956–57, and converted to China's standard gauge in 1971. Two sections of the former Anyou–Basuo line were rebuilt as well: the 108-km-long Anyou–Huangliu section was rebuilt, on standard gauge, in 1958–59, the 18-km Huangliu–Lingtou section was restored in 1960. Together, these two sections formed the Anyou–Lingtou line, which opened on January 1, 1961. However, in 1965 the Huangliu–Lingtou section was closed again, because its main customer, the Jianfengling forestry enterprise (尖峰岭林场), stopped shipping timber by rail.
In 1984–85, the Huangliu-Lingtou section, as well as the long-abandoned Lingtou–Basuo section, were restored, thus creating the standard-gauge Hainan western ring railway from Shilu (Changjiang county seat) to Anyou (in Sanya).
Hub AI
Hainan western ring railway AI simulator
(@Hainan western ring railway_simulator)
Hainan western ring railway
The Hainan western ring railway (Chinese: 海南西环铁路; pinyin: Hǎinán xīhuán tiělù) is a standard-gauge railway running along the coast of the western half of Hainan Island in South China. It connects the provincial capital Haikou on the island's north coast with Sanya, the major city on Hainan's south coast. The rail line is 363.8 km long; its terminals are Haikou railway station and Sanya railway station. Cargo trains enter this railway from Zhanjiang, Guangdong, at the South Port of the Guangdong–Hainan Railway.
The Hainan Western Ring Railway has a long history, some of its sections dating to World War II. It has achieved its present form upon completing a major expansion and upgrade project in 2005. After that, the Hainan Western Ring Railway (including a few minor side branches) remained the island's only railway until the opening of the Hainan Eastern Ring high-speed Railway in 2010, which connects to the Western Ring at both endpoints.
As of 2019, the Hainan Western Ring Railway is primarily used for freight and has limited passenger service. The new Hainan Western Ring High-Speed Railway, primarily for passenger service, has been constructed along a fairly similar but slightly shorter (344 km) route.
The first railways on Hainan, which were later incorporated into the Hainan Western Ring Railway, were constructed during the Japanese occupation of the island during WWII. One of these lines connected the iron ore mine at Shilu with the Basuo Harbor on the island's west coast. The 53-km line was built in 1940–1942 to the Japanese 3 ft 6 in (1,067 mm) gauge, using the labor of some 50,000 Chinese workers. It was opened to traffic on April 7, 1942, but largely destroyed by a typhoon the same summer. After the typhoon, the line was rebuilt more capitalized and reopened in May 1943.
Another line constructed during the Japanese occupation ran along the island's southwestern coast, from Basuo to the Anyou port facilities (18°13′00″N 109°33′00″E / 18.21667°N 109.55000°E) in Sanya, via Huangliu and Lingtou (18°41′15″N 108°42′15″E / 18.68750°N 108.70417°E). This line was opened in March 1943.
After the Communists took over Hainan in April 1950, the narrow-gauge railways weren't used anymore, as they had been damaged beyond repair.
The Shilu–Basuo line was rehabilitated in 1956–57, and converted to China's standard gauge in 1971. Two sections of the former Anyou–Basuo line were rebuilt as well: the 108-km-long Anyou–Huangliu section was rebuilt, on standard gauge, in 1958–59, the 18-km Huangliu–Lingtou section was restored in 1960. Together, these two sections formed the Anyou–Lingtou line, which opened on January 1, 1961. However, in 1965 the Huangliu–Lingtou section was closed again, because its main customer, the Jianfengling forestry enterprise (尖峰岭林场), stopped shipping timber by rail.
In 1984–85, the Huangliu-Lingtou section, as well as the long-abandoned Lingtou–Basuo section, were restored, thus creating the standard-gauge Hainan western ring railway from Shilu (Changjiang county seat) to Anyou (in Sanya).