High-speed rail in Spain
High-speed rail in Spain
Main page
1612678

High-speed rail in Spain

logo
Community Hub0 subscribers
What are your thoughts?
Be the first to start a discussion here.
Be the first to start a discussion here.
High-speed rail in Spain

High-speed railways in Spain have been in operation since 1992 when the first line was opened connecting the cities of Madrid, Córdoba and Seville. Unlike the rest of the Iberian broad gauge network, the Spanish High-speed network mainly uses standard gauge. This permits direct connections to outside Spain through the link to the French network at the Perthus Tunnel. High-speed trains run on a network of high-speed rail track owned and managed by ADIF (Administrador de Infraestructuras Ferroviarias), where the dominant service is AVE while other high speed services such as Avant, Alvia, Avlo, Euromed, Ouigo España and Iryo, as well as mid-speed (InterCity) services also operate.

AVE trains are operated by Renfe, the national passenger high-speed rail operator in Spain, but other companies such as Ouigo España and Iryo compete on the Madrid–Barcelona and other routes in accordance with the European Union legislation. French TGV services run from the border to Barcelona under the TGV inOui brand. Alvia and Euromed trains are also operated by Renfe and have the ability to use both Iberian gauge and standard gauge lines offering high-speed services across the whole Spanish network.

As of March 2026, the Spanish high-speed rail network is the longest HSR network in Europe with 3,973 km (2,469 mi) and the second longest in the world, after China's.

Towards the end of the 1980s a new line was planned to join the Meseta Central with Andalusia without passing through the Despeñaperros pass. After considering various options it was decided that a standard-gauge line, allowing for Spain's first high-speed rail link, would be built. The project was named NAFA (Nuevo Acceso Ferroviario a Andalucía, New Rail Link to Andalusia) and was meant to help revitalise the stagnant southern Spanish economy. The line was inaugurated on 14 April 1992 to coincide with Expo 92 being held in Seville. Seven days later, on 21 April 1992 commercial AVE service began with six daily services stopping at Madrid, Seville, Córdoba, Puertollano and Ciudad Real.

In October 1992 Renfe began the AVE Lanzadera (Shuttle), a high-speed medium-distance service between Madrid, Ciudad Real and Puertollano, using spare class 100 trains.

It has been suggested that the PSOE government chose the French Alstom bid over the Siemens and Talgo bids for political rather than technical reasons, rewarding the French government for its assistance in capturing ETA activists who took sanctuary across the border in southern France. Seville's hosting of the 1992 World's Fair prompted the choice of that city for the inauguration of the first high-speed line, with its being the home town of then Spanish prime minister Felipe González also playing some role. Seville was the artistic, cultural, and financial capital of southern Spain and the fourth largest city in Spain, after Madrid, Barcelona and Valencia, with a population of over 700,000 and a metropolitan area of almost 1.5 million people. It is also the capital of Andalusia, Spain's most populous autonomous community (region).

In January 1993 the Talgo 200 Madrid–Málaga service began, using high-speed lines as far as Córdoba and then the Córdoba–Málaga Spanish-gauge conventional track to reach Málaga. On 23 April that year, an AVE trainset set a new top speed of 356.8 km/h (221.7 mph) on a test run. Later in 1993 the mixed-method services Talgo 200 Madrid–Cádiz and Talgo 200 Madrid–Huelva began.

In 1994 AVE trains on the Madrid–Seville line began to run at 300 km/h, cutting journey times by at least 40 minutes and covering the 471 km in 2+12 hours, though it is unlikely that much of a saving came from the increase in maximum speed, because only a small section of the line near Los Yébenes has the alignments for 300 km/h operation. The maximum permitted speed is 270 km/h between Atocha station and Brazatortas, save for the approaches to the intermediate stations (Atocha, Ciudad Real and Puertollano). Beyond Brazatortas, the line is only authorised for 250 km/h operation, which drops to 215 km/h in the Sierra Morena mountains and 90 km/h around Córdoba station. It is more likely that time savings occurred as a result of there being fewer intermediate stops.

See all
User Avatar
No comments yet.