Kaliwa Low Dam

The Kaliwa Low Dam was proposed by the Philippine Government in 2012, was one of several bulk water supply projects on the upper portion of the Kaliwa River Watershed that have been proposed but ultimately shelved by the Philippine Government since the 1970s.

The proposed Kaliwa Low Dam design had a 600 million-liters-a-day (MLD) capacity, and the water supply tunnel has a 2,400-MLD capacity. Had it been built, the Kaliwa Low Dam was expected to ease the demand on the Angat Dam, Manila's sole water storage facility. It was the main component of the New Centennial Water Source-Kaliwa Dam Project in Tanay, Rizal, which also called for the construction of a water supply tunnel and various attendant infrastructure.

The project had originally been proposed as a bigger, integrated system that included a plan for a second dam, named Laiban dam further upstream. But the government decided on a proposal that would have built the system in stages, and only stage one, involving Kaliwa Low Dam and the water supply tunnel, was approved under the administration of Benigno Aquino III. When the project did not move forward by the time the Aquino administration ended, the succeeding Duterte administration decided not to pursue the Japanese-proposed Kaliwa Low Dam plan in 2019, deciding to instead pursue a bigger, China-funded dam project.

Various plans for the construction of a dam in Tanay, Rizal, have been proposed since the 1970s, when the Marcos government first decided that the location was a more viable location for a dam than the Marikina River. However, protests against the construction of the dam, called Laiban because Barangay Laiban was chosen as the exact project site, very quickly led to protests from various groups. Foremost among these were Indigenous peoples from Central and Southern Luzon, notably the local Remontado Dumagat people, whose ancestral lands would specifically be affected. Environmental and activist groups later also raised concerns. As a result, construction of the dam has been approved, deferred, stopped, and restarted a number of times in the decades since.

The roots of the current "New Centennial Water Source Project" can be traced to the Water Security Legacy (WSL) Roadmap proposed by the Metropolitan Waterworks and Sewerage System (MWSS) in 2012–2016. Based on this document, the MWSS developed plans for "the development of a dam at the Kaliwa River (Laiban Dam), and/or a smaller dam downstream (Kaliwa Low Dam) to maximize water supply, ensure short - and long - term redundancy, and optimize power generation capacities," and in February 2013, the Public Private Partnership Center released a document "sounding out" interested parties.

In that initial market sounding, this proposal was already thought likely to comprise:

In a report by Philippine Daily Inquirer reporter Niña Calleja in that same month, MWSS senior deputy administrator Nathaniel Santos indicated that the main difference between the NCWSP from previous plans was that it would involve the construction of two smaller dams at the Kaliwa watershed instead of just the one. A main dam (Laiban Dam) would be built at the upper Kaliwa River in Barangay Laiban, and another regulating dam (Kaliwa Low Dam) further downstream.

When the National Economic and Development Authority (NEDA) Investment Coordination Committee (ICC) had their October 4, 2013, Joint Cabinet Committee and Technical Board Meeting, however, they suggested that the MWSS to develop the project in stages, allowing for construction on the Kaliwa Low Dam to begin sooner, and for the Laiban Dam components of the project to be funded under a different financial mechanism.