Kaohsiung Metro
Kaohsiung Metro (Chinese: 高雄大眾捷運系統, 高雄捷運) is a rapid transit and light rail system covering the metropolitan area of Kaohsiung, Taiwan. Its rapid transit network is known as Kaohsiung Mass Rapid Transit System or Kaohsiung Rapid Transit (KRT). Construction of the MRT started in October 2001. The MRT opened in 2008 and the Circular light rail in 2015. Kaohsiung Metro is operated by the Kaohsiung Rapid Transit Corporation (KRTC; Chinese: 高雄捷運公司) under a BOT contract the company signed with the Kaohsiung City Government.
The system uses romanizations derived from Tongyong Pinyin.
The Kaohsiung City Government undertook a feasibility study for constructing a rapid transit system in Kaohsiung in 1987. After finding favorable results, the city government began lobbying the Central Government for approval and funding. In 1990, approval was obtained to establish the Kaohsiung City Mass Rapid Transit Bureau and planning of the rapid transit network started. The first phase of the Kaohsiung Mass Rapid Transit System, the Red and Orange Lines, was approved in 1991, but disputes in funding shares between Kaohsiung City and County Governments stalled the project. The Kaohsiung City Mass Rapid Transit Bureau was officially established in 1994, to coincide with the project's move into the final scoping and detail design stages.
Work continued until 1996, when the Central Government ordered KMRT to look into constructing the project via the Build-Operate-Transfer (BOT) method. In 1999, the city government put out a request for the BOT contract to construct the first phase of the KMRT system. In 2000, out of the three consortia that submitted bids, Kaohsiung Rapid Transit Corporation (KRTC) was awarded the contract, receiving priority negotiating rights with the city government in constructing the system. KRTC obtained a company license and was registered in December 2000. In January 2001, KRTC signed the "Construction and Operation Agreement" and the "Development Agreement" with the Kaohsiung City Government, signaling the beginning of construction of the KMRT system. The main participants of the KRTC are: China Steel Corporation, Southeast Cement Corporation, RSEA Engineering Corporation, China Development Industrial Bank, and the Industrial Bank of Taiwan. The current system cost NT$181.3 (US$5.46 billion) to construct and includes a contract for 30 years of operation and maintenance. Construction costs were shared between the central government (79%), Kaohsiung City Government (19%), and Kaohsiung County Government (2%).
Construction began in October 2001, with 66 shield tunnels (45.3 km (28.1 mi)) completed in May 2006. The cut-and-cover and bored tunnel methods were used for construction of the lines. In November 2006, the first trial runs began on the Red Line. In January 2007, the last concrete slabs were laid for the 37 planned stations.
In August 2004, a section of subway tunnel near Sizihwan metro station at the west end of the Orange line collapsed during construction due to loose sand underground and water break-ins. Four low-rise buildings near the collapsed tunnel had to be evacuated and later on had to be torn down due to major structure damages.
The Kaohsiung MRT Foreign Workers Scandal, involving alleged inhumane treatment of Thai migrant workers, erupted in 2005. Investigation revealed kickbacks to politicians by the contractor. The scandal had tainted the public confidence in the construction of the system and prompted a diplomatic response by the Thai Prime Minister asking the migrant workers to return to Thailand. Chen Chu, the Chairperson of the Council of Labor Affairs of the Executive Yuan, resigned as a result of the scandal.
In December 2005, another subway tunnel section of the Orange line at eastern Kaohsiung collapsed during construction. The collapse of the subway tunnel also brought about the collapse of a road tunnel above the subway tunnel. Several nearby buildings were evacuated for several days for inspection. It was estimated that the road tunnel could not be rebuilt and reopened for traffic for at least a few months. In January 2008, the section was still closed and traffic is diverted around the affected area.
Hub AI
Kaohsiung Metro AI simulator
(@Kaohsiung Metro_simulator)
Kaohsiung Metro
Kaohsiung Metro (Chinese: 高雄大眾捷運系統, 高雄捷運) is a rapid transit and light rail system covering the metropolitan area of Kaohsiung, Taiwan. Its rapid transit network is known as Kaohsiung Mass Rapid Transit System or Kaohsiung Rapid Transit (KRT). Construction of the MRT started in October 2001. The MRT opened in 2008 and the Circular light rail in 2015. Kaohsiung Metro is operated by the Kaohsiung Rapid Transit Corporation (KRTC; Chinese: 高雄捷運公司) under a BOT contract the company signed with the Kaohsiung City Government.
The system uses romanizations derived from Tongyong Pinyin.
The Kaohsiung City Government undertook a feasibility study for constructing a rapid transit system in Kaohsiung in 1987. After finding favorable results, the city government began lobbying the Central Government for approval and funding. In 1990, approval was obtained to establish the Kaohsiung City Mass Rapid Transit Bureau and planning of the rapid transit network started. The first phase of the Kaohsiung Mass Rapid Transit System, the Red and Orange Lines, was approved in 1991, but disputes in funding shares between Kaohsiung City and County Governments stalled the project. The Kaohsiung City Mass Rapid Transit Bureau was officially established in 1994, to coincide with the project's move into the final scoping and detail design stages.
Work continued until 1996, when the Central Government ordered KMRT to look into constructing the project via the Build-Operate-Transfer (BOT) method. In 1999, the city government put out a request for the BOT contract to construct the first phase of the KMRT system. In 2000, out of the three consortia that submitted bids, Kaohsiung Rapid Transit Corporation (KRTC) was awarded the contract, receiving priority negotiating rights with the city government in constructing the system. KRTC obtained a company license and was registered in December 2000. In January 2001, KRTC signed the "Construction and Operation Agreement" and the "Development Agreement" with the Kaohsiung City Government, signaling the beginning of construction of the KMRT system. The main participants of the KRTC are: China Steel Corporation, Southeast Cement Corporation, RSEA Engineering Corporation, China Development Industrial Bank, and the Industrial Bank of Taiwan. The current system cost NT$181.3 (US$5.46 billion) to construct and includes a contract for 30 years of operation and maintenance. Construction costs were shared between the central government (79%), Kaohsiung City Government (19%), and Kaohsiung County Government (2%).
Construction began in October 2001, with 66 shield tunnels (45.3 km (28.1 mi)) completed in May 2006. The cut-and-cover and bored tunnel methods were used for construction of the lines. In November 2006, the first trial runs began on the Red Line. In January 2007, the last concrete slabs were laid for the 37 planned stations.
In August 2004, a section of subway tunnel near Sizihwan metro station at the west end of the Orange line collapsed during construction due to loose sand underground and water break-ins. Four low-rise buildings near the collapsed tunnel had to be evacuated and later on had to be torn down due to major structure damages.
The Kaohsiung MRT Foreign Workers Scandal, involving alleged inhumane treatment of Thai migrant workers, erupted in 2005. Investigation revealed kickbacks to politicians by the contractor. The scandal had tainted the public confidence in the construction of the system and prompted a diplomatic response by the Thai Prime Minister asking the migrant workers to return to Thailand. Chen Chu, the Chairperson of the Council of Labor Affairs of the Executive Yuan, resigned as a result of the scandal.
In December 2005, another subway tunnel section of the Orange line at eastern Kaohsiung collapsed during construction. The collapse of the subway tunnel also brought about the collapse of a road tunnel above the subway tunnel. Several nearby buildings were evacuated for several days for inspection. It was estimated that the road tunnel could not be rebuilt and reopened for traffic for at least a few months. In January 2008, the section was still closed and traffic is diverted around the affected area.