Line 4 of the Beijing Subway (Chinese: 北京地铁4号线; pinyin: běijīng dìtiě sìhào xiàn) is a subway line in Beijing's mass transit network. It entered into operation on 28 September 2009, and runs from north to south, parallel and to the west of Line 5, through Haidian, Xicheng, and Fengtai Districts in the western half of the city. It runs from Anheqiao North in the north and ends at Gongyixiqiao in the south, but the 4-Daxing connected line runs all the way to Tiangongyuan in Daxing. All stations are underground except Anheqiao North. It is 28.2 km (17.523 mi) long with 24 stations. Riding on this line starts from a fare of RMB(¥) 3.00 depending on the distance traveled. Line 4's color is teal.
Line 4 and the Daxing line operate as a single line through-running onto each other although they are classified as separate lines. Two different services are run during the day: A full service covering both Line 4 and the Daxing line, and a shorter service that ends at Xin'gong station, the first station of the Daxing line. Combined, the Line 4/Daxing Line Corridor carries an average of 1.24 million passengers every day in 2017, growing to about 1.4 million passengers per day by 2019.
The first south-bound trains departs from Anheqiao North at 5:00 AM. The first northbound train departs from Gongyixiqiao at 5:10 AM. The last northbound train leaves Anheqiao North at 10:45 PM. The last southbound train leaves Gongyixiqiao at 11:10 PM. Each train completes the entire journey in 48 minutes.
In the north, Line 4 begins in Anheqiao, just beyond the Summer Palace, and heads south past the Old Summer Palace, through the university district and Zhongguancun, Beijing's high-tech silicon village, before turning east at the National Library of China and passing the Beijing Zoo en route to Xizhimen. After entering the 2nd Ring Road at Xizhimen, Line 4 resumes southwards at Xinjiekou and traverses the old city through Xisi, Xidan, Xuanwumen, Caishikou, and Taoranting Park. It passes the city's high-speed rail link at the Beijing South railway station before reaching the terminus at Gongyixiqiao. Construction began in 2004 but delays have pushed back the opening date by two years to 28 September 2009.
Line 4 and Daxing line stations, from north to south:
Plans for Line 4 date back to the 1950s when Beijing's first subway line was still under construction. It was planned to run from the Summer Palace, east towards Xizhimen, southeast to Zhongshan Park, terminating at the Beijing Stadium, which near today's Tiantandongmen Station. Ultimately, the section between Summer Palace to Xizhimen was built as planned. However, construction only formally started in 2004.
On 3 December 2004 Hong Kong's MTR Corporation, Beijing Infrastructure Investment Co., Ltd., and Beijing Capital Group Co., Ltd. signed the Beijing Metro Line 4, investment, construction, operation principle of cooperation agreement, making Line 4 the Mainland China's first rail transit line financed using a public-private partnership framework. On 7 February 2005, BJMTR initialled a Public-Private Partnership (PPP) Concession Agreement with Beijing Municipal Government for Line 4, and BJMTR is responsible for the line's rolling stock, signalling, electrical and mechanical systems as well as its operation and maintenance. The concession period is 30 years starting from 28 September 2009 when revenue operation commenced. Subsequently, on 8 November 2005, a joint venture among the 3 companies was established. The Hong Kong MTRC will invest 735 million RMB to the construction of Line 4 and in return have the right to operate Line 4 for 30 years.
On 11 February 2009, the construction of Line 4 is nearing completion with all tunnels bored. On 6 March, four subway trains begin testing while Hong Kong's then Chief Executive, Donald Tsang, visited the project. On 28 September 2009, Line 4 was officially opened for trial operation. Bringing the number of subway lines in Beijing to 9. On 30 December 2010, the Daxing line started trial operation, with direct service into Line 4. Creating a 50 km (31.069 mi) long line with 35 stations.
Hub AI
Line 4 (Beijing Subway) AI simulator
(@Line 4 (Beijing Subway)_simulator)
Line 4 (Beijing Subway)
Line 4 of the Beijing Subway (Chinese: 北京地铁4号线; pinyin: běijīng dìtiě sìhào xiàn) is a subway line in Beijing's mass transit network. It entered into operation on 28 September 2009, and runs from north to south, parallel and to the west of Line 5, through Haidian, Xicheng, and Fengtai Districts in the western half of the city. It runs from Anheqiao North in the north and ends at Gongyixiqiao in the south, but the 4-Daxing connected line runs all the way to Tiangongyuan in Daxing. All stations are underground except Anheqiao North. It is 28.2 km (17.523 mi) long with 24 stations. Riding on this line starts from a fare of RMB(¥) 3.00 depending on the distance traveled. Line 4's color is teal.
Line 4 and the Daxing line operate as a single line through-running onto each other although they are classified as separate lines. Two different services are run during the day: A full service covering both Line 4 and the Daxing line, and a shorter service that ends at Xin'gong station, the first station of the Daxing line. Combined, the Line 4/Daxing Line Corridor carries an average of 1.24 million passengers every day in 2017, growing to about 1.4 million passengers per day by 2019.
The first south-bound trains departs from Anheqiao North at 5:00 AM. The first northbound train departs from Gongyixiqiao at 5:10 AM. The last northbound train leaves Anheqiao North at 10:45 PM. The last southbound train leaves Gongyixiqiao at 11:10 PM. Each train completes the entire journey in 48 minutes.
In the north, Line 4 begins in Anheqiao, just beyond the Summer Palace, and heads south past the Old Summer Palace, through the university district and Zhongguancun, Beijing's high-tech silicon village, before turning east at the National Library of China and passing the Beijing Zoo en route to Xizhimen. After entering the 2nd Ring Road at Xizhimen, Line 4 resumes southwards at Xinjiekou and traverses the old city through Xisi, Xidan, Xuanwumen, Caishikou, and Taoranting Park. It passes the city's high-speed rail link at the Beijing South railway station before reaching the terminus at Gongyixiqiao. Construction began in 2004 but delays have pushed back the opening date by two years to 28 September 2009.
Line 4 and Daxing line stations, from north to south:
Plans for Line 4 date back to the 1950s when Beijing's first subway line was still under construction. It was planned to run from the Summer Palace, east towards Xizhimen, southeast to Zhongshan Park, terminating at the Beijing Stadium, which near today's Tiantandongmen Station. Ultimately, the section between Summer Palace to Xizhimen was built as planned. However, construction only formally started in 2004.
On 3 December 2004 Hong Kong's MTR Corporation, Beijing Infrastructure Investment Co., Ltd., and Beijing Capital Group Co., Ltd. signed the Beijing Metro Line 4, investment, construction, operation principle of cooperation agreement, making Line 4 the Mainland China's first rail transit line financed using a public-private partnership framework. On 7 February 2005, BJMTR initialled a Public-Private Partnership (PPP) Concession Agreement with Beijing Municipal Government for Line 4, and BJMTR is responsible for the line's rolling stock, signalling, electrical and mechanical systems as well as its operation and maintenance. The concession period is 30 years starting from 28 September 2009 when revenue operation commenced. Subsequently, on 8 November 2005, a joint venture among the 3 companies was established. The Hong Kong MTRC will invest 735 million RMB to the construction of Line 4 and in return have the right to operate Line 4 for 30 years.
On 11 February 2009, the construction of Line 4 is nearing completion with all tunnels bored. On 6 March, four subway trains begin testing while Hong Kong's then Chief Executive, Donald Tsang, visited the project. On 28 September 2009, Line 4 was officially opened for trial operation. Bringing the number of subway lines in Beijing to 9. On 30 December 2010, the Daxing line started trial operation, with direct service into Line 4. Creating a 50 km (31.069 mi) long line with 35 stations.