Recent from talks
Knowledge base stats:
Talk channels stats:
Members stats:
Lowell Line
The Lowell Line is a commuter rail service of the MBTA Commuter Rail system, running north–south between Boston and Lowell, Massachusetts. It is 25.4 miles (40.9 km) long, with nine stations including the terminals at North Station and Lowell station. All stations are accessible except for Mishawum, which has been indefinitely closed since 2020.
Lowell Line service runs on the New Hampshire Main Line, originally built as the Boston and Lowell Railroad in 1835. It was leased by the Boston and Maine Railroad in 1887. Local service operated between Boston and Concord, New Hampshire, with most trains using the Woburn Loop until 1959. The final Concord service ended in 1967 during the transition to Massachusetts Bay Transportation Authority subsidization, leaving Lowell–Boston and Woburn–Boston service. Concord service briefly resumed in 1980–81; Woburn service ended in 1981.
The Boston and Lowell Railroad started freight operations in 1835, with traffic from the Lowell mills to the Boston port. Demand for the express passenger service exceeded expectations, and in 1842 local service was added as well. The line north of Lowell was first owned by the Boston, Concord & Montreal Railroad, which was chartered in 1844. Trackage was completed as far as Wells River, Vermont, in 1853. The Boston & Maine Railroad (B&M) acquired the railroad in 1895. The line served as the route for Boston to Montreal service during the Golden Age of Rail (roughly 1880 to 1940). The Ambassador, the train from Boston's North Station to Montreal, ran through Concord, New Hampshire, along this line until 1966. This line, along with the New Englander, via Concord, White River Junction, Montpelier, ran through the northwestern section of Vermont prior to entering Quebec, Canada. The Alouette and Red Wing trains travelled to Montreal via Concord, Plymouth, Wells River and Newport in northeastern Vermont prior to entering Quebec. (The route via Wells River, St. Johnsbury and Newport was the more direct route of the two itineraries.) For this itinerary the Montreal route was marketed as an Air-line railroad.
Service cuts effective May 18, 1958, included the end of Stoneham Branch service and the closure of Medford Hillside, Tufts College, and North Somerville stations. Further cuts on June 14, 1959, ended service north of Woburn on the Woburn Loop; trains for points north were rerouted via the mainline to the east. Boston–Lowell local service was halved to seven daily round trips; Tyngsboro, Bleachery, and South Wilmington stations were closed. B&M passenger service to Boston on the line was shortened from Concord, New Hampshire, to Lowell in 1967.
In 1973, the MBTA bought the Lowell line, along with the Haverhill and all other local Greater Boston passenger lines. Along with the sale, the B&M contracted to run the passenger service on the Lowell line for the MBTA. After bankruptcy, the B&M continued to run and fulfill its commuter rail contract under the protection of the United States Bankruptcy Court, in the hopes that a reorganization could make it profitable again. It emerged from the court's protection when newly formed Guilford Transportation Industries (GTI) purchased it in 1983.
For approximately thirteen months in 1980–81, daily passenger service was provided to Concord. Two round-trips were operated on each weekday and one on weekend days. Originally, there were intermediate stops in Manchester and Nashua. A stop in Merrimack was added later. Service was discontinued when federal funding was withdrawn.
Anderson Regional Transportation Center opened on April 28, 2001, replacing Mishawum as the Lowell Line's primary park-and-ride station for Route 128. Mishawum was reduced to limited reverse-peak service. On December 15, 2001, the Amtrak Downeaster began operating over the line south of Wilmington. In October 2006, the MBTA added four short turn round trips that terminated at Anderson RTC. The line was shut down on weekends in July through September 2017 for the installation of Positive Train Control equipment in order to meet a 2020 federal deadline.
Substantially reduced schedules due to the COVID-19 pandemic were in effect from March 16 to June 23, 2020, and from December 14, 2020, to April 5, 2021. On January 23, 2021, reduced schedules went into place with no weekend service on seven lines, including the Lowell Line. Weekend service on the seven lines resumed on July 3, 2021. Until December 2020, a small number of Haverhill Line trains ran via the Wildcat Branch and the inner Lowell Line, making stops between Anderson/Woburn and West Medford. Some Haverhill Line trains resumed using this routing on April 5, 2021, but no longer make stops on the Lowell Line.
Hub AI
Lowell Line AI simulator
(@Lowell Line_simulator)
Lowell Line
The Lowell Line is a commuter rail service of the MBTA Commuter Rail system, running north–south between Boston and Lowell, Massachusetts. It is 25.4 miles (40.9 km) long, with nine stations including the terminals at North Station and Lowell station. All stations are accessible except for Mishawum, which has been indefinitely closed since 2020.
Lowell Line service runs on the New Hampshire Main Line, originally built as the Boston and Lowell Railroad in 1835. It was leased by the Boston and Maine Railroad in 1887. Local service operated between Boston and Concord, New Hampshire, with most trains using the Woburn Loop until 1959. The final Concord service ended in 1967 during the transition to Massachusetts Bay Transportation Authority subsidization, leaving Lowell–Boston and Woburn–Boston service. Concord service briefly resumed in 1980–81; Woburn service ended in 1981.
The Boston and Lowell Railroad started freight operations in 1835, with traffic from the Lowell mills to the Boston port. Demand for the express passenger service exceeded expectations, and in 1842 local service was added as well. The line north of Lowell was first owned by the Boston, Concord & Montreal Railroad, which was chartered in 1844. Trackage was completed as far as Wells River, Vermont, in 1853. The Boston & Maine Railroad (B&M) acquired the railroad in 1895. The line served as the route for Boston to Montreal service during the Golden Age of Rail (roughly 1880 to 1940). The Ambassador, the train from Boston's North Station to Montreal, ran through Concord, New Hampshire, along this line until 1966. This line, along with the New Englander, via Concord, White River Junction, Montpelier, ran through the northwestern section of Vermont prior to entering Quebec, Canada. The Alouette and Red Wing trains travelled to Montreal via Concord, Plymouth, Wells River and Newport in northeastern Vermont prior to entering Quebec. (The route via Wells River, St. Johnsbury and Newport was the more direct route of the two itineraries.) For this itinerary the Montreal route was marketed as an Air-line railroad.
Service cuts effective May 18, 1958, included the end of Stoneham Branch service and the closure of Medford Hillside, Tufts College, and North Somerville stations. Further cuts on June 14, 1959, ended service north of Woburn on the Woburn Loop; trains for points north were rerouted via the mainline to the east. Boston–Lowell local service was halved to seven daily round trips; Tyngsboro, Bleachery, and South Wilmington stations were closed. B&M passenger service to Boston on the line was shortened from Concord, New Hampshire, to Lowell in 1967.
In 1973, the MBTA bought the Lowell line, along with the Haverhill and all other local Greater Boston passenger lines. Along with the sale, the B&M contracted to run the passenger service on the Lowell line for the MBTA. After bankruptcy, the B&M continued to run and fulfill its commuter rail contract under the protection of the United States Bankruptcy Court, in the hopes that a reorganization could make it profitable again. It emerged from the court's protection when newly formed Guilford Transportation Industries (GTI) purchased it in 1983.
For approximately thirteen months in 1980–81, daily passenger service was provided to Concord. Two round-trips were operated on each weekday and one on weekend days. Originally, there were intermediate stops in Manchester and Nashua. A stop in Merrimack was added later. Service was discontinued when federal funding was withdrawn.
Anderson Regional Transportation Center opened on April 28, 2001, replacing Mishawum as the Lowell Line's primary park-and-ride station for Route 128. Mishawum was reduced to limited reverse-peak service. On December 15, 2001, the Amtrak Downeaster began operating over the line south of Wilmington. In October 2006, the MBTA added four short turn round trips that terminated at Anderson RTC. The line was shut down on weekends in July through September 2017 for the installation of Positive Train Control equipment in order to meet a 2020 federal deadline.
Substantially reduced schedules due to the COVID-19 pandemic were in effect from March 16 to June 23, 2020, and from December 14, 2020, to April 5, 2021. On January 23, 2021, reduced schedules went into place with no weekend service on seven lines, including the Lowell Line. Weekend service on the seven lines resumed on July 3, 2021. Until December 2020, a small number of Haverhill Line trains ran via the Wildcat Branch and the inner Lowell Line, making stops between Anderson/Woburn and West Medford. Some Haverhill Line trains resumed using this routing on April 5, 2021, but no longer make stops on the Lowell Line.