Recent from talks
Knowledge base stats:
Talk channels stats:
Members stats:
MRT (Bangkok)
The Metropolitan Rapid Transit or MRT is a medium-capacity rapid transit system serving the Bangkok Metropolitan Region in Thailand. The MRT system comprises two fully operational rapid transit lines (Blue and Purple) and two fully operational monorail lines (Yellow and Pink), with another rapid transit line (Orange) under construction. The MRT Blue Line, officially the Chaloem Ratchamongkhon Line, between Hua Lamphong and Bang Sue was the first to open in July 2004 as Bangkok's second metro system. The MRT Blue line is officially known in Thai as rotfaifa mahanakhon (รถไฟฟ้ามหานคร) or "metropolitan SkyTrain", but it is more commonly called rotfai taidin (รถไฟใต้ดิน), literally, "underground train" as it was distinguished from the BTS Skytrain by being completely underground when its first section between Hua Lamphong to Bang Sue opened.
The second MRT line MRT Purple Line, officially the Chalong Ratchadham Line, opened on 6 August 2016 and connected Tao Poon with Khlong Bang Phai in Nonthaburi in the northwest of Greater Bangkok. It was the first mass transit line to extend outside Bangkok.
Both the Blue Line and Purple Line are operated by the Bangkok Expressway and Metro Public Company Limited (BEM) under a concession granted by the Mass Rapid Transit Authority of Thailand (MRTA), which is the owner of the MRT lines. Along with the BTS Skytrain and the Airport Rail Link, the MRT is part of Bangkok's rail transportation infrastructure. The BEM-operated MRT lines have 526,000 passengers each day as of August 2024 (Blue Line 453,000 and Purple Line 73,000) with 54 operational stations and a combined route length of 71 kilometers (44 mi). Construction began in mid-2011 to extend the MRT Blue Line, after completion in April 2020, the Blue Line has become a quasi loop line (providing interchange with itself at Tha Phra) around the centre of Bangkok.
The MRT Yellow Line monorail, officially the Nakkhara Phiphat Line, opened for trial operation in June 2023 and was fully opened on 3 July 2023. The MRT Pink Line monorail opened for public trial operation in November 2023, and was fully opened on 1 February 2024. The Yellow and Pink Lines are operated by subsidiaries of BTSC, who also operate the BTS Skytrain rather than BEM.
Other MRT lines are planned for the future MRT system with the MRT Orange Line and the southern extension of the MRT Purple Line from Tao Poon to Rat Burana are under construction. The MRT Brown Line is also planned.
The MRT was constructed under a concession framework. For the first MRT line, officially known as Chaloem Ratchamongkhon or informally as the "Blue Line", civil infrastructure was provided by the government sector, Mass Rapid Transit Authority of Thailand (MRTA), and handed over to their concessionaire under a 25-year concession agreement. Bangkok Expressway and Metro Public Company Limited (BEM) was the only private sector company that won a bid in MRTA's concession contract for the blue line. As MRTA's concessionaire, BEM provides M&E equipment, including electrical trains, signalling systems, SCADA, communication, PSD, etc. for the subway project and fully operates the system. To maintain the system, BEM has subcontracted in 10 years to Siemens, which was the M&E system supplier since system opening and 7 years maintenance contract to two local maintenance services for north and south line.
The construction of the first Bangkok Metro line, officially known as Chaloem Ratchamongkhon (Thai สายเฉลิมรัชมงคล) – "Celebration of Royal Auspice" – or informally as the "Blue Line", began on 19 November 1996. The project suffered multiple delays not only because of the 1997 economic crisis, but also due to challenging civil engineering works of constructing massive underground structures deep in the water-logged soil upon which the city is built.
The Blue Line was opened for a limited public trial period of several weeks starting on 13 April 2004. On 3 July 2004 the line was officially opened at 19:19 local time by HM King Bhumibol and Queen Sirikit, who were accompanied by other members of the royal family. Within 30 minutes of its opening, sightseers filled the system to its maximum capacity, but after the initial rush ridership has settled down to around 180,000 riders daily — considerably lower than projections of over 400,000, despite fares being slashed in half from 12 to 38 baht to 10-15 baht per trip. From 2006 until 2008, fares ranged between 14 and 36 baht per trip. The fare was raised to 16-41 Baht on 1 January 2009. Daily ridership in 2014 was 253,000.
Hub AI
MRT (Bangkok) AI simulator
(@MRT (Bangkok)_simulator)
MRT (Bangkok)
The Metropolitan Rapid Transit or MRT is a medium-capacity rapid transit system serving the Bangkok Metropolitan Region in Thailand. The MRT system comprises two fully operational rapid transit lines (Blue and Purple) and two fully operational monorail lines (Yellow and Pink), with another rapid transit line (Orange) under construction. The MRT Blue Line, officially the Chaloem Ratchamongkhon Line, between Hua Lamphong and Bang Sue was the first to open in July 2004 as Bangkok's second metro system. The MRT Blue line is officially known in Thai as rotfaifa mahanakhon (รถไฟฟ้ามหานคร) or "metropolitan SkyTrain", but it is more commonly called rotfai taidin (รถไฟใต้ดิน), literally, "underground train" as it was distinguished from the BTS Skytrain by being completely underground when its first section between Hua Lamphong to Bang Sue opened.
The second MRT line MRT Purple Line, officially the Chalong Ratchadham Line, opened on 6 August 2016 and connected Tao Poon with Khlong Bang Phai in Nonthaburi in the northwest of Greater Bangkok. It was the first mass transit line to extend outside Bangkok.
Both the Blue Line and Purple Line are operated by the Bangkok Expressway and Metro Public Company Limited (BEM) under a concession granted by the Mass Rapid Transit Authority of Thailand (MRTA), which is the owner of the MRT lines. Along with the BTS Skytrain and the Airport Rail Link, the MRT is part of Bangkok's rail transportation infrastructure. The BEM-operated MRT lines have 526,000 passengers each day as of August 2024 (Blue Line 453,000 and Purple Line 73,000) with 54 operational stations and a combined route length of 71 kilometers (44 mi). Construction began in mid-2011 to extend the MRT Blue Line, after completion in April 2020, the Blue Line has become a quasi loop line (providing interchange with itself at Tha Phra) around the centre of Bangkok.
The MRT Yellow Line monorail, officially the Nakkhara Phiphat Line, opened for trial operation in June 2023 and was fully opened on 3 July 2023. The MRT Pink Line monorail opened for public trial operation in November 2023, and was fully opened on 1 February 2024. The Yellow and Pink Lines are operated by subsidiaries of BTSC, who also operate the BTS Skytrain rather than BEM.
Other MRT lines are planned for the future MRT system with the MRT Orange Line and the southern extension of the MRT Purple Line from Tao Poon to Rat Burana are under construction. The MRT Brown Line is also planned.
The MRT was constructed under a concession framework. For the first MRT line, officially known as Chaloem Ratchamongkhon or informally as the "Blue Line", civil infrastructure was provided by the government sector, Mass Rapid Transit Authority of Thailand (MRTA), and handed over to their concessionaire under a 25-year concession agreement. Bangkok Expressway and Metro Public Company Limited (BEM) was the only private sector company that won a bid in MRTA's concession contract for the blue line. As MRTA's concessionaire, BEM provides M&E equipment, including electrical trains, signalling systems, SCADA, communication, PSD, etc. for the subway project and fully operates the system. To maintain the system, BEM has subcontracted in 10 years to Siemens, which was the M&E system supplier since system opening and 7 years maintenance contract to two local maintenance services for north and south line.
The construction of the first Bangkok Metro line, officially known as Chaloem Ratchamongkhon (Thai สายเฉลิมรัชมงคล) – "Celebration of Royal Auspice" – or informally as the "Blue Line", began on 19 November 1996. The project suffered multiple delays not only because of the 1997 economic crisis, but also due to challenging civil engineering works of constructing massive underground structures deep in the water-logged soil upon which the city is built.
The Blue Line was opened for a limited public trial period of several weeks starting on 13 April 2004. On 3 July 2004 the line was officially opened at 19:19 local time by HM King Bhumibol and Queen Sirikit, who were accompanied by other members of the royal family. Within 30 minutes of its opening, sightseers filled the system to its maximum capacity, but after the initial rush ridership has settled down to around 180,000 riders daily — considerably lower than projections of over 400,000, despite fares being slashed in half from 12 to 38 baht to 10-15 baht per trip. From 2006 until 2008, fares ranged between 14 and 36 baht per trip. The fare was raised to 16-41 Baht on 1 January 2009. Daily ridership in 2014 was 253,000.
