Line 12, also known as the Golden Line from its color on the system map, is a rapid transit line of the Mexico City Metro network. It travels 25.1 kilometers (15.6 mi) along the boroughs of Benito Juárez, Iztapalapa and Tláhuac in southwestern, central-southern and southeastern Mexico City, serving twenty stations. The line was inaugurated on 30 October 2012, going from Tláhuac to Mixcoac station. In 2016, work to expand it to Observatorio station started. All the stations are accessible to people with disabilities as they have elevators, tactile pavings and braille signage plates.
Line 12 was built by Mexican construction company Empresas ICA in association with Alstom Mexicana and Grupo Carso. It runs at grade, overground and underground levels. The interchange stations are Mixcoac (Line 7), Zapata (Line 3), Ermita (Line 2) and Atlalilco (Line 8), and when completed, Observatorio (Line 1). The line connects with other transport systems in the city, including the trolleybus and the Metrobús systems. In 2019, Line 12 had a total ridership of 134,900,367 passengers, averaging 369,590 passengers per day.
Since its planning, the line underwent several modifications in its layout and characteristics. It was originally planned as a mostly subway line that would operate with rubber-tired trains. Also, the line would not operate primarily along Tláhuac Avenue. However, due to time and budget constraints the project underwent modifications after its announcement, and it became a combined under- and overground line with steel-tired trains running elevated along Tláhuac Avenue. Subsidence was reported on several columns along the elevated section before testings with trains started. From the onset of service, problems on the line were still reported especially on the elevated part of the line. In early 2014, operations were halted on that section and they were resumed until late 2015. The elevated track later suffered the impact of a Mw7.1 earthquake in September 2017. In May 2021, a portion of the line's overpass collapsed while a train was on it, resulting in 26 deaths and the line's operations suspended. Investigations concluded that the bridge had a deficient and questionable construction. On January 15, 2023, the section from Mixcoac to Atlalilco reopened for service. On July 15, 2023, the section from Atlalilco to Periférico Oriente also reopened for service. On January 30, 2024, the rest of line from Periférico Oriente to Tláhuac reopened.
In the 1980s, the Comisión de Vialidad y Transporte Urbano (COVITUR), an organization of the Federal District Department, presented a plan for the Mexico City Metro based on several studies and reports related to the rapid growth of the city and its demand for public transportation. On the 1985 Metro Master Plan (Spanish: Programa Maestro del Metro de 1985), COVITUR considered a metro line that would run on the southern part of Mexico City from west to east and it designated as Line 12. It would run from Santa Lucía, in Álvaro Obregón, to Canal de Garay, in Iztapalapa (near Constitución de 1917 station). It would have had seventeen stations and a length of 18.97 kilometers (11.79 mi) and it would connect with Lines 2, 3, 4, 7 and 13, the last one another planned line.
In 1996, the Sistema de Transporte Colectivo (STC), the organization responsible for the metro, published its plan for the next 25 years, the 1995 Metro and Light Rail Master Plan (Spanish: Plan Maestro del Metro y Trenes Ligero). The document considered the new demand for public transport as well as the urban expansion towards the suburbs and the neighboring State of Mexico. Line 12 appeared again in the plan, with some changes, but the route was almost the same. The 1996 Line 12 project would start in Santa Lucía and it would end at a station called Francisco del Paso (otherwise known as Del Paso or Axomulco) in Iztacalco. The idea was that both Line 8 and Line 12 would share Francisco del Paso station as a transfer station; then, the stretch of Line 8 going from this new station (and the stations between Atlalilco and Constitución de 1917) would be transferred to Line 12, while Line 8 would have a new expansion from Francisco del Paso towards Acoxpa, in Tlalpan.
In December 2006, the government of Mexico City announced the possible construction of a new metro line to satisfy the demand for public transportation in the south of the city, taking into consideration Line 12's original plans. In July 2007, the city announced a query among its citizens, named Consulta Verde, to choose between two routes. The line would go from Mixcoac to Iztapalapa; from there, there were two choices: Iztapalapa–Acoxpa or Iztapalapa–Tláhuac. The winning route became Iztapalapa–Tláhuac. Tláhuac, one of the easternmost Mexico City boroughs, did not have metro service by then. For the project, some of the stations for Line 11 were merged into Line 12 (from Culhuacán to Periférico Oriente—with almost all the names of the stations changed).
On 8 August 2007 the project was officially presented as "Línea 12: línea dorada, la línea del Bicentenario" (Line 12: Golden Line, the Bicentennial Line) and, thus, its chosen distinctive color was golden. The project was assigned to Proyecto Metro, which was headed by Enrique Horcasitas. The announced stations from west to east, with their original names, were: Mixcoac, Insurgentes Sur, 20 de Noviembre (later renamed to Hospital 20 de Noviembre), Zapata, Parque de los Venados, Eje Central (otherwise known as Popocatépetl), Ermita, Sur 69, Vía Láctea, Mexicaltzingo, Francisco del Paso, Ganaderos (otherwise known as Granaderos), Canal Nacional, ESIME Culhuacán, La Vírgen, Calle 11, Periférico Oriente, Tezonco (also known as San Lorenzo), Olivos (also known as Los Olivos), Francisco Villa (later renamed to Nopalera), Zapotitlán, Tlaltenco and Tláhuac. All but the last three were planned as underground stations.
Due to budget, time, and other setbacks, the line underwent several modifications. For instance, Sur 69 and Vía Láctea stations were not built due to neighborhood opposition. Ganaderos station was rejected by the National Institute of Anthropology and History because its construction would have affected a nearby archaeological site. Francisco del Paso station was canceled because its construction would have caused a six-month partial closure of Line 8; instead Atlalilco station was chosen as the interchange station and as a consequence it has the longest passenger transfer tunnel in the system. These issues caused the route to be changed. Instead of running along Arneses Avenue (Eje 3 Oriente) and later along Canal Nacional Avenue, the route was moved instead to run along Tláhuac Avenue (Ejes 9 and 10 Sur). ESIME Culhuacán and La Vírgen stations were relocated and became San Andrés Tomatlán and Lomas Estrella stations, respectively. Between Atlalilco and San Andrés Tomatlán, Culhuacán station was added to the route.
Hub AI
Mexico City Metro Line 12 AI simulator
(@Mexico City Metro Line 12_simulator)
Mexico City Metro Line 12
Line 12, also known as the Golden Line from its color on the system map, is a rapid transit line of the Mexico City Metro network. It travels 25.1 kilometers (15.6 mi) along the boroughs of Benito Juárez, Iztapalapa and Tláhuac in southwestern, central-southern and southeastern Mexico City, serving twenty stations. The line was inaugurated on 30 October 2012, going from Tláhuac to Mixcoac station. In 2016, work to expand it to Observatorio station started. All the stations are accessible to people with disabilities as they have elevators, tactile pavings and braille signage plates.
Line 12 was built by Mexican construction company Empresas ICA in association with Alstom Mexicana and Grupo Carso. It runs at grade, overground and underground levels. The interchange stations are Mixcoac (Line 7), Zapata (Line 3), Ermita (Line 2) and Atlalilco (Line 8), and when completed, Observatorio (Line 1). The line connects with other transport systems in the city, including the trolleybus and the Metrobús systems. In 2019, Line 12 had a total ridership of 134,900,367 passengers, averaging 369,590 passengers per day.
Since its planning, the line underwent several modifications in its layout and characteristics. It was originally planned as a mostly subway line that would operate with rubber-tired trains. Also, the line would not operate primarily along Tláhuac Avenue. However, due to time and budget constraints the project underwent modifications after its announcement, and it became a combined under- and overground line with steel-tired trains running elevated along Tláhuac Avenue. Subsidence was reported on several columns along the elevated section before testings with trains started. From the onset of service, problems on the line were still reported especially on the elevated part of the line. In early 2014, operations were halted on that section and they were resumed until late 2015. The elevated track later suffered the impact of a Mw7.1 earthquake in September 2017. In May 2021, a portion of the line's overpass collapsed while a train was on it, resulting in 26 deaths and the line's operations suspended. Investigations concluded that the bridge had a deficient and questionable construction. On January 15, 2023, the section from Mixcoac to Atlalilco reopened for service. On July 15, 2023, the section from Atlalilco to Periférico Oriente also reopened for service. On January 30, 2024, the rest of line from Periférico Oriente to Tláhuac reopened.
In the 1980s, the Comisión de Vialidad y Transporte Urbano (COVITUR), an organization of the Federal District Department, presented a plan for the Mexico City Metro based on several studies and reports related to the rapid growth of the city and its demand for public transportation. On the 1985 Metro Master Plan (Spanish: Programa Maestro del Metro de 1985), COVITUR considered a metro line that would run on the southern part of Mexico City from west to east and it designated as Line 12. It would run from Santa Lucía, in Álvaro Obregón, to Canal de Garay, in Iztapalapa (near Constitución de 1917 station). It would have had seventeen stations and a length of 18.97 kilometers (11.79 mi) and it would connect with Lines 2, 3, 4, 7 and 13, the last one another planned line.
In 1996, the Sistema de Transporte Colectivo (STC), the organization responsible for the metro, published its plan for the next 25 years, the 1995 Metro and Light Rail Master Plan (Spanish: Plan Maestro del Metro y Trenes Ligero). The document considered the new demand for public transport as well as the urban expansion towards the suburbs and the neighboring State of Mexico. Line 12 appeared again in the plan, with some changes, but the route was almost the same. The 1996 Line 12 project would start in Santa Lucía and it would end at a station called Francisco del Paso (otherwise known as Del Paso or Axomulco) in Iztacalco. The idea was that both Line 8 and Line 12 would share Francisco del Paso station as a transfer station; then, the stretch of Line 8 going from this new station (and the stations between Atlalilco and Constitución de 1917) would be transferred to Line 12, while Line 8 would have a new expansion from Francisco del Paso towards Acoxpa, in Tlalpan.
In December 2006, the government of Mexico City announced the possible construction of a new metro line to satisfy the demand for public transportation in the south of the city, taking into consideration Line 12's original plans. In July 2007, the city announced a query among its citizens, named Consulta Verde, to choose between two routes. The line would go from Mixcoac to Iztapalapa; from there, there were two choices: Iztapalapa–Acoxpa or Iztapalapa–Tláhuac. The winning route became Iztapalapa–Tláhuac. Tláhuac, one of the easternmost Mexico City boroughs, did not have metro service by then. For the project, some of the stations for Line 11 were merged into Line 12 (from Culhuacán to Periférico Oriente—with almost all the names of the stations changed).
On 8 August 2007 the project was officially presented as "Línea 12: línea dorada, la línea del Bicentenario" (Line 12: Golden Line, the Bicentennial Line) and, thus, its chosen distinctive color was golden. The project was assigned to Proyecto Metro, which was headed by Enrique Horcasitas. The announced stations from west to east, with their original names, were: Mixcoac, Insurgentes Sur, 20 de Noviembre (later renamed to Hospital 20 de Noviembre), Zapata, Parque de los Venados, Eje Central (otherwise known as Popocatépetl), Ermita, Sur 69, Vía Láctea, Mexicaltzingo, Francisco del Paso, Ganaderos (otherwise known as Granaderos), Canal Nacional, ESIME Culhuacán, La Vírgen, Calle 11, Periférico Oriente, Tezonco (also known as San Lorenzo), Olivos (also known as Los Olivos), Francisco Villa (later renamed to Nopalera), Zapotitlán, Tlaltenco and Tláhuac. All but the last three were planned as underground stations.
Due to budget, time, and other setbacks, the line underwent several modifications. For instance, Sur 69 and Vía Láctea stations were not built due to neighborhood opposition. Ganaderos station was rejected by the National Institute of Anthropology and History because its construction would have affected a nearby archaeological site. Francisco del Paso station was canceled because its construction would have caused a six-month partial closure of Line 8; instead Atlalilco station was chosen as the interchange station and as a consequence it has the longest passenger transfer tunnel in the system. These issues caused the route to be changed. Instead of running along Arneses Avenue (Eje 3 Oriente) and later along Canal Nacional Avenue, the route was moved instead to run along Tláhuac Avenue (Ejes 9 and 10 Sur). ESIME Culhuacán and La Vírgen stations were relocated and became San Andrés Tomatlán and Lomas Estrella stations, respectively. Between Atlalilco and San Andrés Tomatlán, Culhuacán station was added to the route.