Hubbry Logo
search
logo
2123201

Minuteman Bikeway

logo
Community Hub0 Subscribers
Write something...
Be the first to start a discussion here.
Be the first to start a discussion here.
See all
Minuteman Bikeway

The Minuteman Bikeway, also known as the Minuteman Commuter Bikeway, is a 10-mile (16-kilometre) paved multi-use rail trail located in the Greater Boston area of Massachusetts. It runs from Bedford to Alewife station, at the northern end of the Red Line in Cambridge, passing through the towns of Lexington and Arlington along the way. Also along the route are several notable regional sites, including Alewife Brook Reservation, the Cyrus Dallin Art Museum, Spy Pond, "Arlington’s Great Meadows" (actually located in Lexington), the Battle Green in Lexington, and Hanscom Air Force Base.

At its Cambridge terminus, the bikeway connects with four other bike paths:

The Somerville Community Path was extended to downtown Boston in the summer of 2023, creating a much larger continuous bikeway accessible from the Minuteman.

At the Bedford end, the Minuteman Bikeway connects with the Narrow Gauge Rail Trail and the Reformatory Branch Rail Trail.

The path comprising the current Minuteman Bikeway has a long history. The trail closely approximates the route that Paul Revere took on his famous ride in 1775, which heralded the beginning of the American Revolution.

Along the way to becoming a railroad, the path's right-of-way (ROW) was laid out east of Lexington in 1846 by the Lexington and West Cambridge Railroad and west of Lexington in 1873 by the Middlesex Central Railroad. Part of the original track can be seen in Arlington, near Uncle Sam Plaza in front of the Cyrus Dallin Art Museum.

A concept to convert the rail corridor into a commuter bicycle path was first proposed in 1974, three years before passenger rail service was discontinued, and a full seven years before rail service was discontinued altogether (in 1981). In 1991, the final plan for the conversion was approved, and construction started on the original section of the bikeway. The corridor was railbanked in July 1992. The Arlington–Lexington section of the path was dedicated in September 1992; the Lexington–Bedford segment was delayed by water main construction and opened in May 1993. In 1998, the bikeway was extended a short distance from East Arlington to Alewife station in Cambridge.

In 2002, it was repaved in Arlington and in 2004, the Bedford Depot Park Enhancement Project was completed at its western terminus. In 2008, the bikeway was the fifth inductee into the national Rail-Trail Hall of Fame by the Rails-to-Trails Conservancy.

See all
User Avatar
No comments yet.