Northampton power station (also known as Nunn Mills power station or Hardingstone Junction power station) was an electricity generating station in Northampton, Northamptonshire, England, which began operation for the Northampton Electric Light and Power Company Limited (NELPC) in 1919 and generated power until closure in 1976.
The redundant power station buildings were used as a grain storage facility in the late 1970s. Using both the road and rail facilities on site for transportation of grain.
The power station was finally demolished in around 2015 to make way for the relocation of the University of Northampton close to the town centre. This was completed in 2018 and is now known as the Waterside Campus.
The power station was located on the south bank of the River Nene just south-east of the town centre. It was also known as Nunn Mills power station being the name of a mill located on that part of the river, though none of the mill seems to remain. It was also known as Hardingstone Junction power station named after the nearby railway junction of that name. Two large concrete cooling towers east of the main turbine halls were demolished shortly after closure. However, the derelict and graffiti covered main buildings were still standing 37 years later in 2012. A large storage area for coal was located east of the generating plant and delivered by rail using a branch of the Northampton to Bedford railway line.
The Northampton Electric Light and Power Company Limited was established in April 1889 and the supply of current began on 11 March 1891 from Bridge Street power station (52°14′09″N 0°53′47″W / 52.23583°N 0.89639°W) in Northampton town centre.
In 1897 the plant had a generating capacity of 425 kW and the maximum load was 182 kW. A total of 114.676 MWh of electricity was sold which provided an income to the company of £3,032-2-7. The growth in electricity supply is demonstrated in the table.
In 1904 the Northampton Corporation planned to purchase the undertaking but negotiations failed, however, it was noted that the local authority were satisfied with the service the company were providing. Electricity supplies were initially limited to the centre of Northampton but an extension order in 1904 gave the company powers to extend supplies outside the borough.
By 1913 the growth in demand for electricity was such that the company sought to build a new generating station at Hardingstone Junction. Work on the new station began in 1916 and operation began in 1919.
Hub AI
Northampton Power Station AI simulator
(@Northampton Power Station_simulator)
Northampton Power Station
Northampton power station (also known as Nunn Mills power station or Hardingstone Junction power station) was an electricity generating station in Northampton, Northamptonshire, England, which began operation for the Northampton Electric Light and Power Company Limited (NELPC) in 1919 and generated power until closure in 1976.
The redundant power station buildings were used as a grain storage facility in the late 1970s. Using both the road and rail facilities on site for transportation of grain.
The power station was finally demolished in around 2015 to make way for the relocation of the University of Northampton close to the town centre. This was completed in 2018 and is now known as the Waterside Campus.
The power station was located on the south bank of the River Nene just south-east of the town centre. It was also known as Nunn Mills power station being the name of a mill located on that part of the river, though none of the mill seems to remain. It was also known as Hardingstone Junction power station named after the nearby railway junction of that name. Two large concrete cooling towers east of the main turbine halls were demolished shortly after closure. However, the derelict and graffiti covered main buildings were still standing 37 years later in 2012. A large storage area for coal was located east of the generating plant and delivered by rail using a branch of the Northampton to Bedford railway line.
The Northampton Electric Light and Power Company Limited was established in April 1889 and the supply of current began on 11 March 1891 from Bridge Street power station (52°14′09″N 0°53′47″W / 52.23583°N 0.89639°W) in Northampton town centre.
In 1897 the plant had a generating capacity of 425 kW and the maximum load was 182 kW. A total of 114.676 MWh of electricity was sold which provided an income to the company of £3,032-2-7. The growth in electricity supply is demonstrated in the table.
In 1904 the Northampton Corporation planned to purchase the undertaking but negotiations failed, however, it was noted that the local authority were satisfied with the service the company were providing. Electricity supplies were initially limited to the centre of Northampton but an extension order in 1904 gave the company powers to extend supplies outside the borough.
By 1913 the growth in demand for electricity was such that the company sought to build a new generating station at Hardingstone Junction. Work on the new station began in 1916 and operation began in 1919.