Recent from talks
Contribute something to knowledge base
Content stats: 0 posts, 0 articles, 1 media, 0 notes
Members stats: 0 subscribers, 0 contributors, 0 moderators, 0 supporters
Subscribers
Supporters
Contributors
Moderators
Hub AI
Operation Plunder AI simulator
(@Operation Plunder_simulator)
Hub AI
Operation Plunder AI simulator
(@Operation Plunder_simulator)
Operation Plunder
Operation Plunder was a military operation to cross the Rhine on the night of 23 March 1945, launched by the 21st Army Group under Field Marshal Bernard Montgomery. The crossing of the river was at Rees, Wesel, and south of the river Lippe by the British Second Army under Lieutenant General Miles Dempsey, and the United States Ninth Army under Lieutenant General William H. Simpson.
The Battle of the Rhine was crucial for the Allied advance into Germany, and was planned by Montgomery as a three-army assault, including an airborne assault, a five-thousand-gun artillery barrage, and Anglo-American bombers. Thousands of tons of supplies were brought forward including huge amounts of bridging equipment.
The First Allied Airborne Army conducted Operation Varsity on the east bank of the Rhine in support of Operation Plunder, consisting of U.S. XVIII Airborne Corps, the British 6th, and the U.S. 17th Airborne Divisions.
Operation Grenade in February by Simpson's Ninth Army and Harry Crerar's First Canadian Army was also expected to prepare the ground.
Preparations such as accumulation of supplies, road construction, and the transport of 36 Royal Navy landing craft, were hidden by a massive smoke screen from 16 March. The operation commenced on the night of 23 March 1945. It included the Varsity parachute and glider landings near Wesel, and Operation Archway, by the Special Air Service.
Four thousand Allied guns fired for four hours during the opening bombardment. British bombers contributed with attacks on Wesel during the day and night of 23 March 1945.
On the night of 23 March, companies E and C of the 17th Armored Engineer Battalion, part of the U.S. 2nd Armored Division, constructed treadway rafts to prepare the crossing of the Rhine about five kilometers south of Wesel. Bridge construction started at 9:45 a.m. and by 4:00 p.m. the first truck crossed the floating pontoon bridge. Over 1,152 feet (351 m) of M2 treadway and 93 pneumatic floats were laid in the six hours and fifteen minute construction project, a record setting for the size of the bridge. It took twenty-five 21⁄2 ton GMC CCKW trucks to transport the bridge parts to the construction site, part of the Red Ball Express.
Three Allied formations made the initial assault: the British XII Corps and XXX Corps and the U.S. XVI Corps. The British 79th Armoured Division—under Major General Percy Hobart—had been at the front of the Normandy landings and provided invaluable help in subsequent operations with specially adapted armored vehicles (known as Hobart's Funnies). One "funny" was the LVT-2 "Buffalo" operated by the 4th Royal Tank Regiment, under the command of Lieutenant Colonel Alan Jolly, an armed and armoured amphibious tracked personnel or cargo transporter, which was able to cross soft and flooded ground. These were the vehicles for the spearhead infantry.
Operation Plunder
Operation Plunder was a military operation to cross the Rhine on the night of 23 March 1945, launched by the 21st Army Group under Field Marshal Bernard Montgomery. The crossing of the river was at Rees, Wesel, and south of the river Lippe by the British Second Army under Lieutenant General Miles Dempsey, and the United States Ninth Army under Lieutenant General William H. Simpson.
The Battle of the Rhine was crucial for the Allied advance into Germany, and was planned by Montgomery as a three-army assault, including an airborne assault, a five-thousand-gun artillery barrage, and Anglo-American bombers. Thousands of tons of supplies were brought forward including huge amounts of bridging equipment.
The First Allied Airborne Army conducted Operation Varsity on the east bank of the Rhine in support of Operation Plunder, consisting of U.S. XVIII Airborne Corps, the British 6th, and the U.S. 17th Airborne Divisions.
Operation Grenade in February by Simpson's Ninth Army and Harry Crerar's First Canadian Army was also expected to prepare the ground.
Preparations such as accumulation of supplies, road construction, and the transport of 36 Royal Navy landing craft, were hidden by a massive smoke screen from 16 March. The operation commenced on the night of 23 March 1945. It included the Varsity parachute and glider landings near Wesel, and Operation Archway, by the Special Air Service.
Four thousand Allied guns fired for four hours during the opening bombardment. British bombers contributed with attacks on Wesel during the day and night of 23 March 1945.
On the night of 23 March, companies E and C of the 17th Armored Engineer Battalion, part of the U.S. 2nd Armored Division, constructed treadway rafts to prepare the crossing of the Rhine about five kilometers south of Wesel. Bridge construction started at 9:45 a.m. and by 4:00 p.m. the first truck crossed the floating pontoon bridge. Over 1,152 feet (351 m) of M2 treadway and 93 pneumatic floats were laid in the six hours and fifteen minute construction project, a record setting for the size of the bridge. It took twenty-five 21⁄2 ton GMC CCKW trucks to transport the bridge parts to the construction site, part of the Red Ball Express.
Three Allied formations made the initial assault: the British XII Corps and XXX Corps and the U.S. XVI Corps. The British 79th Armoured Division—under Major General Percy Hobart—had been at the front of the Normandy landings and provided invaluable help in subsequent operations with specially adapted armored vehicles (known as Hobart's Funnies). One "funny" was the LVT-2 "Buffalo" operated by the 4th Royal Tank Regiment, under the command of Lieutenant Colonel Alan Jolly, an armed and armoured amphibious tracked personnel or cargo transporter, which was able to cross soft and flooded ground. These were the vehicles for the spearhead infantry.