Hubbry Logo
search
search button
Sign in
Historyarrow-down
starMorearrow-down
Hubbry Logo
search
search button
Sign in
Operational Requirement
Community hub for the Wikipedia article
logoWikipedian hub
Welcome to the community hub built on top of the Operational Requirement Wikipedia article. Here, you can discuss, collect, and organize anything related to Operational Requirement. The purpose of the hub is to connect people, foster deeper knowledge, and help improve the root Wikipedia article.
Add your contribution
Inside this hub
Operational Requirement

An Operational Requirement, commonly abbreviated OR, was a United Kingdom (UK) Air Ministry document setting out the required characteristics for a future (i.e., as-yet unbuilt) military aircraft or weapon system.

The numbered OR would describe what intended role the aircraft would be used for, e.g., bomber, fighter, etc., or what type of weapon was required, e.g., gun, armament, bomb type, etc.

In conjunction with any official specification, prospective manufacturers would then choose whether to design an aircraft or weapon for this particular requirement.

Operational Requirements were carried over with the dissolution of the Air Ministry and the creation of the Ministry of Defence (MoD).

Other requirements

[edit]

An Experimental Requirement (ER) was for an aircraft for research purposes; e.g., ER.100 in support of development of the English Electric Lightning.

See also

[edit]

Notes

[edit]

Further reading

[edit]
Add your contribution
Related Hubs