Picc-Vic tunnel
Picc-Vic was a proposed, and later cancelled, underground railway designed in the early 1970s with the purpose of connecting two major mainline railway termini in Manchester city centre, England. The name Picc-Vic was a contraction of the two key station names, Manchester Piccadilly and Manchester Victoria. The proposal envisaged the construction of an underground rail tunnel across Manchester city centre. The scheme was abandoned in 1977 during its proposal stages. The view was that the scheme still retained two large and expensive-to-maintain terminal stations in Manchester while other similarly sized cities had reduced their terminals to one.
In 1992, the Metrolink system opened and linked both stations via tram, to an extent negating the requirement for a direct rail connection. In 2017, the Ordsall Chord became operational; an overground railway scheme directly linking Manchester Piccadilly and Manchester Victoria in a comparable fashion to Picc-Vic.
The railway network built in the 19th and 20th centuries by numerous railway companies resulted in various unconnected railway termini around the periphery of Manchester city centre. Unlike central London, which had linked its stations with the London Underground, Manchester had a large area of its central business district which was not served by rail transport.
The South-East Lancashire and North-East Cheshire Passenger Transport Executive (SELNEC PTE) – the local transport authority which became the Greater Manchester Passenger Transport Executive (GMPTE) in 1974 (now Transport for Greater Manchester – TfGM) – made a proposal in 1971 to connect the unjoined railways running through Manchester city centre under the Picc-Vic scheme. The Picc-Vic proposal envisaged joining the two halves of the rail network by constructing new tunnels under the city centre, connecting Manchester's two main railway stations, Piccadilly and Victoria. This new underground railway would be served by three new underground stations, joining together the regional, national and local rail networks with an underground rapid transit system for Manchester.
The objectives of the Picc-Vic tunnel were threefold:
It formed part of a four-phase, long term strategy for GMPTE over 25 years, which included bus priority and an east-west railway network, as well as a light rapid transport system.
SELNEC made an infrastructure grant application to central government to fund the construction of the Picc-Vic line. In the early 1970s, Britain was facing economic difficulties and the Chancellor of the Exchequer Anthony Barber announced a £500 million reduction in public expenditure. In August 1973, the Minister for Transport Industries John Peyton rejected the grant application, stating that "there is no room for a project as costly as Picc-Vic before 1975 at the earliest".
An underground excavation and construction project required a large initial outlay of public funds, and when the Greater Manchester County Council took on the project, it was unable to secure the necessary funding from central government. The Picc-Vic scheme was abandoned in 1977 owing to excessive cost in the view of Westminster. Essential context is the lack of enthusiasm from central UK government to invest in infrastructure outside of London.
Hub AI
Picc-Vic tunnel AI simulator
(@Picc-Vic tunnel_simulator)
Picc-Vic tunnel
Picc-Vic was a proposed, and later cancelled, underground railway designed in the early 1970s with the purpose of connecting two major mainline railway termini in Manchester city centre, England. The name Picc-Vic was a contraction of the two key station names, Manchester Piccadilly and Manchester Victoria. The proposal envisaged the construction of an underground rail tunnel across Manchester city centre. The scheme was abandoned in 1977 during its proposal stages. The view was that the scheme still retained two large and expensive-to-maintain terminal stations in Manchester while other similarly sized cities had reduced their terminals to one.
In 1992, the Metrolink system opened and linked both stations via tram, to an extent negating the requirement for a direct rail connection. In 2017, the Ordsall Chord became operational; an overground railway scheme directly linking Manchester Piccadilly and Manchester Victoria in a comparable fashion to Picc-Vic.
The railway network built in the 19th and 20th centuries by numerous railway companies resulted in various unconnected railway termini around the periphery of Manchester city centre. Unlike central London, which had linked its stations with the London Underground, Manchester had a large area of its central business district which was not served by rail transport.
The South-East Lancashire and North-East Cheshire Passenger Transport Executive (SELNEC PTE) – the local transport authority which became the Greater Manchester Passenger Transport Executive (GMPTE) in 1974 (now Transport for Greater Manchester – TfGM) – made a proposal in 1971 to connect the unjoined railways running through Manchester city centre under the Picc-Vic scheme. The Picc-Vic proposal envisaged joining the two halves of the rail network by constructing new tunnels under the city centre, connecting Manchester's two main railway stations, Piccadilly and Victoria. This new underground railway would be served by three new underground stations, joining together the regional, national and local rail networks with an underground rapid transit system for Manchester.
The objectives of the Picc-Vic tunnel were threefold:
It formed part of a four-phase, long term strategy for GMPTE over 25 years, which included bus priority and an east-west railway network, as well as a light rapid transport system.
SELNEC made an infrastructure grant application to central government to fund the construction of the Picc-Vic line. In the early 1970s, Britain was facing economic difficulties and the Chancellor of the Exchequer Anthony Barber announced a £500 million reduction in public expenditure. In August 1973, the Minister for Transport Industries John Peyton rejected the grant application, stating that "there is no room for a project as costly as Picc-Vic before 1975 at the earliest".
An underground excavation and construction project required a large initial outlay of public funds, and when the Greater Manchester County Council took on the project, it was unable to secure the necessary funding from central government. The Picc-Vic scheme was abandoned in 1977 owing to excessive cost in the view of Westminster. Essential context is the lack of enthusiasm from central UK government to invest in infrastructure outside of London.