Point Beach Nuclear Plant
Point Beach Nuclear Plant is a nuclear power plant located on Lake Michigan in the town of Two Creeks, Wisconsin, United States. The plant was built by Wisconsin Electric Power Company (now We Energies, a subsidiary of Wisconsin Energy Corporation), and previously operated by the Nuclear Management Company. The plant is currently owned and operated by NextEra Energy Resources (prior to 2009 – FPL Energy), of Juno Beach, Florida.
The plant is composed of two, two-loop Westinghouse pressurized water reactors. There is also a visitors' center located just south of the administration building.
Construction for Unit 1 began in 1966 and it was placed into commercial operation in December 1970. Unit 2 was placed into commercial operation in September 1972. The plant was built for a total cost of $114.9 million ($844 million, 2023 USD).
The entire site covers 1,050 acres; approximately 70 acres are used for the nuclear power plant and transmission yard infrastructure and the remaining land used for agriculture or solar arrays.
The original letter of intent to purchase a single 454 megawatt (MW) nuclear unit from Westinghouse Electric Company for a fixed-price was issued by Wisconsin Electric and Wisconsin Michigan Power Company (a Wisconsin Electric subsidiary) on December 30, 1965. The right was reserved to order a second, duplicate unit under the same terms. In May, 1966, the announcement was made that the plant would be built on a 1,200-acre site in the town of Two Creeks.
On November 28, 1966, following Public Service Commission of Wisconsin (PSCW) endorsement and a brief public hearing, Alfred Gruhl, Glenn Reed, and Sol Burstein turned the first symbolic spades of dirt for the official ground-breaking. In May, 1967, the Atomic Energy Commission (AEC), predecessor to the Nuclear Regulatory Commission (NRC), issued the official construction permit (number 32) for Point Beach Unit 1. The Unit 2 construction permit (number 47) was issued approximately a year later.
On October 5, 1970, the AEC issued its full-term, full-power Operating License (DPR-24) for Point Beach Unit 1. The loading fuel into the reactor commenced almost immediately. On November 2, 1970, operators achieved initial criticality, with the nuclear-powered electricity being produced four days later, on November 6. Full commercial service was reached on December 21, 1970, just 49 months from the initial groundbreaking ceremony. After delays from nuclear power opponents, Unit 2 was granted a full-term, full-power operating license (DPR-27) on March 8, 1973, almost 1+1⁄2 years behind the original schedule.
Due to steam generator tube degradation and failures caused by intergranular stress corrosion cracking, Unit 1 was operated at approximately 75-80% of full power from December 1979 until October 1983, when replacement steam generators were installed. The Unit 2 steam generators were replaced in 1996–1997.
Hub AI
Point Beach Nuclear Plant AI simulator
(@Point Beach Nuclear Plant_simulator)
Point Beach Nuclear Plant
Point Beach Nuclear Plant is a nuclear power plant located on Lake Michigan in the town of Two Creeks, Wisconsin, United States. The plant was built by Wisconsin Electric Power Company (now We Energies, a subsidiary of Wisconsin Energy Corporation), and previously operated by the Nuclear Management Company. The plant is currently owned and operated by NextEra Energy Resources (prior to 2009 – FPL Energy), of Juno Beach, Florida.
The plant is composed of two, two-loop Westinghouse pressurized water reactors. There is also a visitors' center located just south of the administration building.
Construction for Unit 1 began in 1966 and it was placed into commercial operation in December 1970. Unit 2 was placed into commercial operation in September 1972. The plant was built for a total cost of $114.9 million ($844 million, 2023 USD).
The entire site covers 1,050 acres; approximately 70 acres are used for the nuclear power plant and transmission yard infrastructure and the remaining land used for agriculture or solar arrays.
The original letter of intent to purchase a single 454 megawatt (MW) nuclear unit from Westinghouse Electric Company for a fixed-price was issued by Wisconsin Electric and Wisconsin Michigan Power Company (a Wisconsin Electric subsidiary) on December 30, 1965. The right was reserved to order a second, duplicate unit under the same terms. In May, 1966, the announcement was made that the plant would be built on a 1,200-acre site in the town of Two Creeks.
On November 28, 1966, following Public Service Commission of Wisconsin (PSCW) endorsement and a brief public hearing, Alfred Gruhl, Glenn Reed, and Sol Burstein turned the first symbolic spades of dirt for the official ground-breaking. In May, 1967, the Atomic Energy Commission (AEC), predecessor to the Nuclear Regulatory Commission (NRC), issued the official construction permit (number 32) for Point Beach Unit 1. The Unit 2 construction permit (number 47) was issued approximately a year later.
On October 5, 1970, the AEC issued its full-term, full-power Operating License (DPR-24) for Point Beach Unit 1. The loading fuel into the reactor commenced almost immediately. On November 2, 1970, operators achieved initial criticality, with the nuclear-powered electricity being produced four days later, on November 6. Full commercial service was reached on December 21, 1970, just 49 months from the initial groundbreaking ceremony. After delays from nuclear power opponents, Unit 2 was granted a full-term, full-power operating license (DPR-27) on March 8, 1973, almost 1+1⁄2 years behind the original schedule.
Due to steam generator tube degradation and failures caused by intergranular stress corrosion cracking, Unit 1 was operated at approximately 75-80% of full power from December 1979 until October 1983, when replacement steam generators were installed. The Unit 2 steam generators were replaced in 1996–1997.