Hubbry Logo
search
search button
Sign in
Historyarrow-down
starMorearrow-down
Hubbry Logo
search
search button
Sign in
SS Howell E. Jackson
Community hub for the Wikipedia article
logoWikipedian hub
Welcome to the community hub built on top of the SS Howell E. Jackson Wikipedia article. Here, you can discuss, collect, and organize anything related to SS Howell E. Jackson. The purpose of the hub is to connect people, foster deeper knowledge, and help improve the root Wikipedia article.
Add your contribution
Inside this hub
SS Howell E. Jackson

History
United States
NameHowell E. Jackson
NamesakeHowell E. Jackson
OwnerWar Shipping Administration (WSA)
OperatorMarine Transport Line
Orderedas type (EC2-S-C1) hull, MC hull 1498
BuilderJ.A. Jones Construction, Brunswick, Georgia
Cost$1.851.609[1]
Yard number114
Way number4
Laid down22 May 1943
Launched6 September 1943
Sponsored byNobie Ramspeck
Completed25 September 1943
Identification
Fate
General characteristics [2]
Class & type
Tonnage
Displacement
Length
  • 441 feet 6 inches (135 m) oa
  • 416 feet (127 m) pp
  • 427 feet (130 m) lwl
Beam57 feet (17 m)
Draft27 ft 9.25 in (8.4646 m)
Installed power
  • 2 × Oil fired 450 °F (232 °C) boilers, operating at 220 psi (1,500 kPa)
  • 2,500 hp (1,900 kW)
Propulsion
Speed11.5 knots (21.3 km/h; 13.2 mph)
Capacity
  • 562,608 cubic feet (15,931 m3) (grain)
  • 499,573 cubic feet (14,146 m3) (bale)
Complement
Armament

SS Howell E. Jackson was a Liberty ship built in the United States during World War II. She was named after Howell E. Jackson, an Associate Justice of the Supreme Court of the United States and a United States senator from Tennessee.

Construction

[edit]

Howell E. Jackson was laid down on 22 May 1943, under a Maritime Commission (MARCOM) contract, MC hull 1498, by J.A. Jones Construction, Brunswick, Georgia;[3] sponsored by Nobie Ramspeck,[1] wife of House Majority Whip Robert Ramspeck, and launched on 6 September 1943.[3]

History

[edit]

She was allocated to Marine Transport Line, on 25 September 1943. On 7 June 1948, she was laid up in the National Defense Reserve Fleet in Wilmington, North Carolina. On 9 August 1962, she was sold to North American Smelting Company, for $45,025, for scrapping, she was delivered on 29 August 1962.[4][5]

References

[edit]

Bibliography

[edit]
Add your contribution
Related Hubs