Recent from talks
Shenton College
Knowledge base stats:
Talk channels stats:
Members stats:
Shenton College
Shenton College is a public co-educational senior high school, located in Shenton Park, an inner western suburb of Perth, Western Australia. Like many WA high schools, it is a partially selective school with out-of-area students accepted on a number of criteria. Shenton is one of the largest schools in Western Australia, with 2,839 enrolled students as of 10 May 2024.
Shenton College was established in January 2001 through the amalgamation of Swanbourne Senior High School and Hollywood Senior High School at a cost of $23.5 million. It was a project headed by the then Education Minister Colin Barnett as part of the Local Area Education Planning (LAEP) process.
The inaugural principal of the college was Pauline Coghlan, who was succeeded by Michael Morgan in September 2008. Assisting the Principal are six associate principals: Christopher Hill, Kristy Watson, Adam Pengelly, Jane Hamburg (Years 11 and 12), Gary Green (Years 9 and 10) and Chantal Simpson (Years 7 and 8).
In February 2009, Shenton College and Newman Senior High School in the Pilbara announced an inter-school partnership.
During a freak storm on 22 March 2010, the school was extensively damaged by heavy hail and torrential rain. As a result, the school was temporarily closed. Students from years 8 to 10 were not allowed back for 8 days.
In 2015, Shenton College was expanded to include Year 7 students.
Shenton College was built in 2001 at a cost of $23.5 million[citation needed] on a 13-hectare (33-acre) site bounded by Lemnos Street, Selby Street and Stubbs Terrace. The campus is adjacent to the Shenton Park railway station on the Fremantle railway line.
In 2019, stage 2 of the campus construction was completed at a cost of $46 million, providing facilities for an additional 1,000 Year 11 and 12 students – taking the school's permanent capacity to 2,600 students. The expansion included new general classrooms; specialist classrooms for science, visual and performing arts, multimedia, IT and business studies; food and technology facilities; a new technology and enterprise centre; and a new cafeteria. The gymnasium was extended and new multi-purpose sports courts built.
Hub AI
Shenton College AI simulator
(@Shenton College_simulator)
Shenton College
Shenton College is a public co-educational senior high school, located in Shenton Park, an inner western suburb of Perth, Western Australia. Like many WA high schools, it is a partially selective school with out-of-area students accepted on a number of criteria. Shenton is one of the largest schools in Western Australia, with 2,839 enrolled students as of 10 May 2024.
Shenton College was established in January 2001 through the amalgamation of Swanbourne Senior High School and Hollywood Senior High School at a cost of $23.5 million. It was a project headed by the then Education Minister Colin Barnett as part of the Local Area Education Planning (LAEP) process.
The inaugural principal of the college was Pauline Coghlan, who was succeeded by Michael Morgan in September 2008. Assisting the Principal are six associate principals: Christopher Hill, Kristy Watson, Adam Pengelly, Jane Hamburg (Years 11 and 12), Gary Green (Years 9 and 10) and Chantal Simpson (Years 7 and 8).
In February 2009, Shenton College and Newman Senior High School in the Pilbara announced an inter-school partnership.
During a freak storm on 22 March 2010, the school was extensively damaged by heavy hail and torrential rain. As a result, the school was temporarily closed. Students from years 8 to 10 were not allowed back for 8 days.
In 2015, Shenton College was expanded to include Year 7 students.
Shenton College was built in 2001 at a cost of $23.5 million[citation needed] on a 13-hectare (33-acre) site bounded by Lemnos Street, Selby Street and Stubbs Terrace. The campus is adjacent to the Shenton Park railway station on the Fremantle railway line.
In 2019, stage 2 of the campus construction was completed at a cost of $46 million, providing facilities for an additional 1,000 Year 11 and 12 students – taking the school's permanent capacity to 2,600 students. The expansion included new general classrooms; specialist classrooms for science, visual and performing arts, multimedia, IT and business studies; food and technology facilities; a new technology and enterprise centre; and a new cafeteria. The gymnasium was extended and new multi-purpose sports courts built.