The Sheppard East LRT was a proposed light rail line in Toronto, Ontario, Canada. It was first announced as part of the Transit City proposal in 2007. The Sheppard East LRT as proposed was to be 13 kilometres (8.1 mi) long, travel along Sheppard Avenue from Don Mills subway station to east of Morningside Avenue, and be operated by the Toronto Transit Commission (TTC).
In May 2009, funding was approved by the provincial and federal governments. In December 2010, Toronto mayor Rob Ford cancelled the line, along with the rest of Transit City, in favour of constructing underground subway lines. However, in March 2012, Toronto city council re-instated the Sheppard East LRT at a special city council meeting. In 2016, it was reported that the line had been indefinitely deferred and would possibly be replaced by a competing proposal to extend Line 4 Sheppard. In April 2019, Ontario premier Doug Ford announced that the provincial government would extend Line 4 Sheppard to McCowan Road at some unspecified time in the future, replacing the proposed Sheppard East LRT.
On March 16, 2007, the Sheppard East LRT was first proposed as part of Toronto mayor David Miller's Transit City proposal.
In May 2009, funding was approved by the provincial and federal governments. The line was to open from Don Mills station to Meadowvale Road in 2013. The project was to include a new train yard at Conlins Road. Metrolinx had originally budgeted CA$944.5 million from 2009 through 2014 for the design and construction of the line.
On December 21, 2009, construction for the line began at Agincourt GO Station. Detailed engineering had been initiated for the grade separation of Sheppard Avenue East and the GO Transit tracks east of Kennedy Road.
In May 2010, Metrolinx revised the opening date to mid-2014.
Following the municipal election in December 2010, Toronto mayor Rob Ford cancelled the line along with the rest of Transit City in favour of constructing underground subway lines. However, in March 2012, Toronto city council re-instated it at a special city council meeting.
In June 2012, the province of Ontario announced that construction of the Sheppard East LRT would not resume until 2017, nor finish until 2021. By December 2012, the underpass construction needed for the Sheppard LRT at Agincourt GO Station was completed to enhance traffic flow as well as enhance the safety and reliability of GO Transit.
Hub AI
Sheppard East LRT AI simulator
(@Sheppard East LRT_simulator)
Sheppard East LRT
The Sheppard East LRT was a proposed light rail line in Toronto, Ontario, Canada. It was first announced as part of the Transit City proposal in 2007. The Sheppard East LRT as proposed was to be 13 kilometres (8.1 mi) long, travel along Sheppard Avenue from Don Mills subway station to east of Morningside Avenue, and be operated by the Toronto Transit Commission (TTC).
In May 2009, funding was approved by the provincial and federal governments. In December 2010, Toronto mayor Rob Ford cancelled the line, along with the rest of Transit City, in favour of constructing underground subway lines. However, in March 2012, Toronto city council re-instated the Sheppard East LRT at a special city council meeting. In 2016, it was reported that the line had been indefinitely deferred and would possibly be replaced by a competing proposal to extend Line 4 Sheppard. In April 2019, Ontario premier Doug Ford announced that the provincial government would extend Line 4 Sheppard to McCowan Road at some unspecified time in the future, replacing the proposed Sheppard East LRT.
On March 16, 2007, the Sheppard East LRT was first proposed as part of Toronto mayor David Miller's Transit City proposal.
In May 2009, funding was approved by the provincial and federal governments. The line was to open from Don Mills station to Meadowvale Road in 2013. The project was to include a new train yard at Conlins Road. Metrolinx had originally budgeted CA$944.5 million from 2009 through 2014 for the design and construction of the line.
On December 21, 2009, construction for the line began at Agincourt GO Station. Detailed engineering had been initiated for the grade separation of Sheppard Avenue East and the GO Transit tracks east of Kennedy Road.
In May 2010, Metrolinx revised the opening date to mid-2014.
Following the municipal election in December 2010, Toronto mayor Rob Ford cancelled the line along with the rest of Transit City in favour of constructing underground subway lines. However, in March 2012, Toronto city council re-instated it at a special city council meeting.
In June 2012, the province of Ontario announced that construction of the Sheppard East LRT would not resume until 2017, nor finish until 2021. By December 2012, the underpass construction needed for the Sheppard LRT at Agincourt GO Station was completed to enhance traffic flow as well as enhance the safety and reliability of GO Transit.