Hubbry Logo
Tehran Metro Line 6Tehran Metro Line 6Main
Open search
Tehran Metro Line 6
Community hub
Tehran Metro Line 6
logo
8 pages, 0 posts
0 subscribers
Be the first to start a discussion here.
Be the first to start a discussion here.
Tehran Metro Line 6
from Wikipedia
Tehran Metro Line 6
Overview
Native nameخط ۶ مترو تهران
OwnerTehran Urban and Suburban Railways Organization (Metro)
LocaleTehran, Tehran Province
Termini
Stations24
Service
TypeRapid transit
SystemTehran Metro
Operator(s)Tehran Urban and Suburban Railways Organization (Metro)
Depot(s)Dowlat Abad Depot
History
OpenedApril 7, 2019[1]
Technical
Line length32.5 km (20.2 mi)[2]
Track gauge1,435 mm (4 ft 8+12 in)
Electrification25 kV AC overhead catenary
Route map

Line 6 is pink coloured on system maps.[3] An initial 9-kilometer-long (5.6 mi) section between Shohada Square to Dowlat Abad opened on April 7, 2019.[4][5] This line is 16.5 km (10.3 mi) long with 24 stations right now. When completed, this line will be 38 km (24 mi) long with 32 stations, connecting southeast Tehran to northwest.[4]

Route

[edit]

Map

References

[edit]
Revisions and contributorsEdit on WikipediaRead on Wikipedia
Add your contribution
Related Hubs
User Avatar
No comments yet.