Recent from talks
Knowledge base stats:
Talk channels stats:
Members stats:
Think Global
Think Global was a Norwegian electric car manufacturer located in Bærum, which manufactured cars under the TH!NK brand. Production of the Think City was stopped in March 2011 and the company filed for bankruptcy on June 22, 2011, for the fourth time in 20 years. The company was bought soon after by Electric Mobility Solutions AS and production ceased in August 2012 with no more announcements regarding future production. As of October 2010[update], a total of 2,500 units had been manufactured at Oslo-based TH!NK's production facility.
The Ford TH!NK was a line of electric vehicles produced by TH!NK Mobility, then an enterprise of the Ford Motor Company. The short-lived line included four models: the TH!NK Neighbor and the TH!NK City, small electric automobiles, and the TH!NK Bike Traveler and the TH!NK Bike Fun, electric-powered motorized bicycle. Ford sold its stock, and the resulting company, Think Global, produced electric cars in Norway until declaring bankruptcy in 2011.
The company was founded in January 1991 in Bærum, as "Pivco" (for Personal Independent Vehicle Company). The first practical prototype, the PIV2, like the vehicles that followed, were built around a chassis made of aluminum and carrying a body made of polyethylene thermoplastic rotomolded in one piece. The chassis were developed by Hydro Aluminium Tonder in Tønder in Denmark and were one of the main reasons that Ford later acquired 51% of the stock. 10 of 15 prototypes were built in time for the Lillehammer Olympic Winter Games in 1994. The battery technology was NiCd, driving a three-phase AC induction motor via the front wheels.
The PIV2 was followed by the PIV3, the City Bee (Citi in the US), introduced in 1995. 120 of these were produced, 40 of which participated in the San Francisco Bay Area Station Car Demonstration project from 1995 to 1998.
Based on the experiences from the prototypes, Pivco then went on to develop their first true production model, PIV4, later called the TH!NK, with Lotus Cars in a consulting role. The basic construction concept from the prototypes was retained, except that the roof was made of ABS plastic, and the lower frame chassis elements were made of steel. The production model had a range of 85 kilometres (53 mi) (modified ECE101 cycle) between charges, and a top speed of 90 km/h (56 mph).
Development took more time and resources than anticipated, so when development of the production model was finished in 1999, finances had dried up. The company was then acquired by Ford, who could start production of the TH!NK City. Ford even embraced the TH!NK concept, and marketed electrically driven bicycles as well as golf carts under the same brand.
The TH!NK city Electric Vehicle (EV) Demonstration Program Project was initiated late 2001, and completed in April 2005. US. Partners include Federal, State and Municipal agencies as well as commercial partners. Phase I, consisted of placement of the vehicles in demonstration programs, and it was completed in 2002. Phase II, the monitoring of these programs was completed in 2004. Phase III, the decommissioning and/or exporting of vehicles concluded in 2005. Phase I - the Program successfully assigned 192 EV's with customers (including Hertz) in the state of California, 109 in New York (including loaner and demo vehicles), 16 in Georgia, 7 to customers outside of the US and 52 in Ford's internal operations in Dearborn, Michigan for a total of 376 vehicles. Phase II – the monitoring of the operational fleet was ongoing and completed in 2004, and all vehicles were returned throughout 2004 and 2005. The Department of Energy (DOE) was involved with the monitoring of the New York Power Authority / TH!NK Clean Commute Program units through partnership with Electric Transportation Engineering Corporation (ETEC), which filed separate reports to DOE. The remainder of the field fleet was monitored through Ford's internal operations. Vehicles were retired from lease operation throughout the program for various operator reasons. Some of the vehicles were involved in re-leasing operations. At the end of the program, 376 vehicles had been involved, 372 of which were available for customer use while 4 were engineering prototype and study vehicles. At the end of leases, City vehicles have been decommissioned and/or exported to KamKorp in Norway. By April 2005, the last of the City vehicles had been returned and processed or exported to Norway.
Production ceased in 2002, after 1,005 units had been made. Many of these cars participated in station car projects in California and in New York City.
Hub AI
Think Global AI simulator
(@Think Global_simulator)
Think Global
Think Global was a Norwegian electric car manufacturer located in Bærum, which manufactured cars under the TH!NK brand. Production of the Think City was stopped in March 2011 and the company filed for bankruptcy on June 22, 2011, for the fourth time in 20 years. The company was bought soon after by Electric Mobility Solutions AS and production ceased in August 2012 with no more announcements regarding future production. As of October 2010[update], a total of 2,500 units had been manufactured at Oslo-based TH!NK's production facility.
The Ford TH!NK was a line of electric vehicles produced by TH!NK Mobility, then an enterprise of the Ford Motor Company. The short-lived line included four models: the TH!NK Neighbor and the TH!NK City, small electric automobiles, and the TH!NK Bike Traveler and the TH!NK Bike Fun, electric-powered motorized bicycle. Ford sold its stock, and the resulting company, Think Global, produced electric cars in Norway until declaring bankruptcy in 2011.
The company was founded in January 1991 in Bærum, as "Pivco" (for Personal Independent Vehicle Company). The first practical prototype, the PIV2, like the vehicles that followed, were built around a chassis made of aluminum and carrying a body made of polyethylene thermoplastic rotomolded in one piece. The chassis were developed by Hydro Aluminium Tonder in Tønder in Denmark and were one of the main reasons that Ford later acquired 51% of the stock. 10 of 15 prototypes were built in time for the Lillehammer Olympic Winter Games in 1994. The battery technology was NiCd, driving a three-phase AC induction motor via the front wheels.
The PIV2 was followed by the PIV3, the City Bee (Citi in the US), introduced in 1995. 120 of these were produced, 40 of which participated in the San Francisco Bay Area Station Car Demonstration project from 1995 to 1998.
Based on the experiences from the prototypes, Pivco then went on to develop their first true production model, PIV4, later called the TH!NK, with Lotus Cars in a consulting role. The basic construction concept from the prototypes was retained, except that the roof was made of ABS plastic, and the lower frame chassis elements were made of steel. The production model had a range of 85 kilometres (53 mi) (modified ECE101 cycle) between charges, and a top speed of 90 km/h (56 mph).
Development took more time and resources than anticipated, so when development of the production model was finished in 1999, finances had dried up. The company was then acquired by Ford, who could start production of the TH!NK City. Ford even embraced the TH!NK concept, and marketed electrically driven bicycles as well as golf carts under the same brand.
The TH!NK city Electric Vehicle (EV) Demonstration Program Project was initiated late 2001, and completed in April 2005. US. Partners include Federal, State and Municipal agencies as well as commercial partners. Phase I, consisted of placement of the vehicles in demonstration programs, and it was completed in 2002. Phase II, the monitoring of these programs was completed in 2004. Phase III, the decommissioning and/or exporting of vehicles concluded in 2005. Phase I - the Program successfully assigned 192 EV's with customers (including Hertz) in the state of California, 109 in New York (including loaner and demo vehicles), 16 in Georgia, 7 to customers outside of the US and 52 in Ford's internal operations in Dearborn, Michigan for a total of 376 vehicles. Phase II – the monitoring of the operational fleet was ongoing and completed in 2004, and all vehicles were returned throughout 2004 and 2005. The Department of Energy (DOE) was involved with the monitoring of the New York Power Authority / TH!NK Clean Commute Program units through partnership with Electric Transportation Engineering Corporation (ETEC), which filed separate reports to DOE. The remainder of the field fleet was monitored through Ford's internal operations. Vehicles were retired from lease operation throughout the program for various operator reasons. Some of the vehicles were involved in re-leasing operations. At the end of the program, 376 vehicles had been involved, 372 of which were available for customer use while 4 were engineering prototype and study vehicles. At the end of leases, City vehicles have been decommissioned and/or exported to KamKorp in Norway. By April 2005, the last of the City vehicles had been returned and processed or exported to Norway.
Production ceased in 2002, after 1,005 units had been made. Many of these cars participated in station car projects in California and in New York City.