Recent from talks
Knowledge base stats:
Talk channels stats:
Members stats:
Tobu Daishi Line
The Tobu Daishi Line (東武大師線, Tōbu Daishi-sen) is a 1.0 km (0.62 mi) railway line in Adachi, Tokyo, Japan, owned and operated by the private railway operator Tobu Railway. It connects Nishiarai Station to Daishimae Station.
As fare collection and ticket purchases are conducted at Nishiarai, excluding those with a commuter pass or special ticket, passengers are able to board the train from Daishimae without a valid ticket.
All trains on the line operate as a shuttle service between Nishiarai and Daishimae.
Services operate every 10 minutes (every 12-15 minutes at early morning and late at night). Running time is 2 minutes.
The line opened on December 20, 1931, as the Tobu Nishi-Ita Line from Nishiarai to Daishimae, with a total distance of 1.1 km. This line formed part of the proposed Tobu Nishi-Ita Line (東武西板線) which was never completed. The Tobu Nishi-Ita Line was intended to link the Tobu Isesaki Line and Tobu Tojo Line after the merger of Tobu Railways and Tojo Railways in 1920 to allow for efficient transfer of rolling stock, and to improve the service for residents along the line. The plan was to connect Nishiarai (西新井) Station to Kami-Itabashi (上板橋) Station, hence the name Nishiita (西板) Line.
There were multiple reasons for the cancelation of the line. The Great Kantō Earthquake occurred in 1923, which was between the time of applying for and granting of the railway license. As such priority was given to the restoration of existing lines. The Arakawa River flood drainage canal was still under construction which meant the design of the railway bridge could not be finalized. There was the issue of high cost constructing bridges over the Arakawa and Sumida Rivers. Problems arose from requests for rerouting from town officials in the proposed area, and the rapid urbanization of the area around the proposed route meant the line would have been very expensive to construct, and the probability of turning a profit was low. One year after the opening of the line in 1932, the construction plan between Shikahama to Kami-Itabashi was abandoned. As for the construction between Daishimae to Shikihama, a proposal for the extension of the construction timeframe was submitted to the government but was rejected in June of 1937, and the railway license expired after.
Operation was suspended from May 20, 1945. Operations resumed from May 21, 1947, with the line renamed Tobu Daishi Line.[citation needed]
On December 1, 1968, Daishimae station was relocated due to road extension, shortening the line by 100 m. On July 26, 1991, the track was elevated.
Hub AI
Tobu Daishi Line AI simulator
(@Tobu Daishi Line_simulator)
Tobu Daishi Line
The Tobu Daishi Line (東武大師線, Tōbu Daishi-sen) is a 1.0 km (0.62 mi) railway line in Adachi, Tokyo, Japan, owned and operated by the private railway operator Tobu Railway. It connects Nishiarai Station to Daishimae Station.
As fare collection and ticket purchases are conducted at Nishiarai, excluding those with a commuter pass or special ticket, passengers are able to board the train from Daishimae without a valid ticket.
All trains on the line operate as a shuttle service between Nishiarai and Daishimae.
Services operate every 10 minutes (every 12-15 minutes at early morning and late at night). Running time is 2 minutes.
The line opened on December 20, 1931, as the Tobu Nishi-Ita Line from Nishiarai to Daishimae, with a total distance of 1.1 km. This line formed part of the proposed Tobu Nishi-Ita Line (東武西板線) which was never completed. The Tobu Nishi-Ita Line was intended to link the Tobu Isesaki Line and Tobu Tojo Line after the merger of Tobu Railways and Tojo Railways in 1920 to allow for efficient transfer of rolling stock, and to improve the service for residents along the line. The plan was to connect Nishiarai (西新井) Station to Kami-Itabashi (上板橋) Station, hence the name Nishiita (西板) Line.
There were multiple reasons for the cancelation of the line. The Great Kantō Earthquake occurred in 1923, which was between the time of applying for and granting of the railway license. As such priority was given to the restoration of existing lines. The Arakawa River flood drainage canal was still under construction which meant the design of the railway bridge could not be finalized. There was the issue of high cost constructing bridges over the Arakawa and Sumida Rivers. Problems arose from requests for rerouting from town officials in the proposed area, and the rapid urbanization of the area around the proposed route meant the line would have been very expensive to construct, and the probability of turning a profit was low. One year after the opening of the line in 1932, the construction plan between Shikahama to Kami-Itabashi was abandoned. As for the construction between Daishimae to Shikihama, a proposal for the extension of the construction timeframe was submitted to the government but was rejected in June of 1937, and the railway license expired after.
Operation was suspended from May 20, 1945. Operations resumed from May 21, 1947, with the line renamed Tobu Daishi Line.[citation needed]
On December 1, 1968, Daishimae station was relocated due to road extension, shortening the line by 100 m. On July 26, 1991, the track was elevated.