Zumwalt-class destroyer
Zumwalt-class destroyer
Main page
2139672

Zumwalt-class destroyer

logo
Community Hub0 subscribers
What are your thoughts?
Be the first to start a discussion here.
Be the first to start a discussion here.
Zumwalt-class destroyer

The Zumwalt-class destroyer is a class of three United States Navy guided-missile destroyers designed as multi-mission stealth ships with a focus on land attack. The class was designed with a primary role of naval gunfire support and secondary roles of surface warfare and anti-aircraft warfare. The class design emerged from the DD-21 "land attack destroyer" program as "DD(X)" and was intended to take the role of battleships in meeting a congressional mandate for naval fire support. The ship is designed around its two Advanced Gun Systems (AGS), turrets with 920-round magazines, and unique Long Range Land Attack Projectile (LRLAP) ammunition. LRLAP procurement was canceled, rendering the guns unusable, so the Navy re-purposed the ships for surface warfare. In 2023, the Navy removed the AGS from the ships and replaced them with hypersonic missiles.

The ships are classed as destroyers, but they are much larger than any other active destroyers or cruisers in the U.S. Navy. The vessels' distinctive appearance results from the design requirement for a low radar cross-section (RCS). The Zumwalt class has a wave-piercing tumblehome hull form whose sides slope inward above the waterline, dramatically reducing RCS by returning much less energy than a conventional flare hull form.

The class has an integrated electric propulsion (IEP) system that can send electricity from its turbo-generators to the electric drive motors or weapons, the Total Ship Computing Environment Infrastructure (TSCEI), automated fire-fighting systems, and automated piping rupture isolation. The class is designed to require a smaller crew and to be less expensive to operate than comparable warships.

The lead ship is named Zumwalt for Admiral Elmo Zumwalt and carries the hull number DDG-1000. Originally, 32 ships were planned, with $9.6 billion research and development costs spread across the class. As costs overran estimates, the number was reduced to 24, then to 7; finally, in July 2008, the Navy requested that Congress stop procuring Zumwalts and revert to building more Arleigh Burke destroyers. Only three Zumwalts were ultimately built. The average costs of construction accordingly increased, to $4.24 billion, well exceeding the per-unit cost of a nuclear-powered Virginia-class submarine ($2.688 billion), and with the program's large development costs now attributable to only three ships, rather than the 32 originally planned, the total program cost per ship jumped. In April 2016 the total program cost was $22.5 billion, $7.5 billion per ship. The per-ship increases triggered a Nunn–McCurdy Amendment breach.

Many of the features were developed under the DD-21 program ("21st Century Destroyer"), which was originally designed around the Vertical Gun for Advanced Ships (VGAS). In 2001, Congress cut the DD-21 program by half as part of the SC21 program; to save it, the acquisition program was renamed DD(X) and heavily reworked.

Originally, the Navy had hoped to build 32 destroyers. That number was reduced to 24, then to 7, due to the high cost of new and experimental technologies. On 23 November 2005, the Defense Acquisition Board approved a plan for simultaneous construction of the first two ships at Northrop Grumman's Ingalls yard in Pascagoula, Mississippi, and General Dynamics' Bath Iron Works in Bath, Maine. However, at that date, funding had yet to be authorized by Congress.

In late December 2005, the House and Senate agreed to continue funding the program. The U.S. House of Representatives allotted the Navy only enough money to begin construction on one destroyer as a "technology demonstrator". The initial funding allocation was included in the National Defense Authorization Act of 2007. However, this was increased to two ships by the 2007 appropriations bill approved in September 2006, which allotted US$2.568 billion to the DDG-1000 program.

On 31 July 2008, U.S. Navy acquisition officials told Congress that the service needed to purchase more Arleigh Burke-class destroyers and no longer needed the next-generation DDG-1000 class; only the two approved destroyers would be built. The Navy said the world threat picture had changed in such a way that it made more sense to build at least eight more Burkes rather than DDG-1000s. The Navy concluded from fifteen classified intelligence reports that the DDG-1000s would be vulnerable to forms of missile attacks. Many Congressional subcommittee members questioned that the Navy completed such a sweeping re-evaluation of the world threat picture in just a few weeks, after spending some 13 years and $10 billion on the development of the surface ship program known as DD-21, then DD(X), and finally DDG-1000. Subsequently, Chief of Naval Operations Gary Roughead cited the need to provide area air defense and specific new threats such as ballistic missiles and the possession of anti-ship missiles by groups such as Hezbollah. The mooted structural problems have not been discussed in public. Navy Secretary Donald Winter said on 4 September, "Making certain that we have—I'll just say, a destroyer—in the '09 budget is more important than whether that's a DDG 1000 or a DDG 51".

See all
User Avatar
No comments yet.