The BN-350 was a sodium-cooled, fast reactor located at the Mangyshlak Nuclear Power Plant (or Mangyshlak Atomic Energy Combine), located in Aktau (formerly known as Shevchenko), Kazakhstan, on the shore of the Caspian Sea.

Construction of the BN-350 fast breeder reactor began in 1964, and the plant first produced electricity in 1973. In addition to providing power for the city (350 MWe), BN-350 was also used for producing plutonium and for desalination to supply 120,000 m³ of fresh water per day to the city.

The prototypes for the development of the BN-350 reactor were the experimental reactor BR-5, built in 1959 on the territory of the Institute of Physics and Power Engineering (IPPE, Obninsk, Kaluga region), and the research reactor BOR-60, introduced at RIAR in 1969. (Melekess, now Dimitrovgrad, Ulyanovsk region). The development of all power reactors was carried out under the scientific guidance of IPPE.

A three-circuit reactor cooling scheme is used. In the first and second circuits, liquid sodium is used as a coolant, in the third circuit, water. The reactor pressure vessel is made of stainless steel with a thickness of 30 millimetres (1.2 in) and a diameter of 2.4 to 6.0 m. The first circuit of the cooling system consists of five active and one reserve loop.

The project lifetime of the reactor officially finished in 1993, and in June 1994, the reactor was forced to shut down because of a lack of funds to buy fuel. By 1995, the plant's operating license had expired. The facility continued to operate far below capacity until reactor operations ceased in 1999, when plutonium-bearing spent fuel stopped being produced.

Disposition of spent fuel was executed with technical and financial assistance of the US government. Some 3,000 cubic metres (110,000 cu ft) of liquid radioactive waste, mainly sodium and caesium-137 with a half-life of 30 years, are stored at MAEK-Kazatomprom. Short-term safe storage will be 10 years, followed by a long-term dry storage of 50 years. Total decommissioning cost was estimated in 2020 at $330 million to be paid by local residents through the electricity tariff.

For the process of decommissioning to remove the radioactive hazard, Rosatom will assist Kazakhstan on the decommissioning for the BN-350 reactor.

As follows from the materials on the Rosatom procurement website, Techsnabexport JSC will provide assistance to Kazakh partners.