US Standard Light Rail Vehicle
A Boeing Vertol US SLRV in service for the San Francisco Municipal Railway in 1980, on the then-newly opened Muni Metro
In service1976-1998 (MUNI)
1976-2007 (MBTA)
Constructed1976–1979
Entered service1976–1984
Scrapped1987–as late as 2020
Number built275
Capacityseated 52 (MBTA, later reduced to 48 to provide room for wheelchairs) or 68 (Muni), with crush load of 219
Specifications
Car length71 ft (21.64 m)[1]
Width8 ft 10+14 in (2,699 mm)[1]
Height11 ft 4 in (3.454 m)[1] ATOR
Floor height34 in (86.4 cm)[1] ATOR
Maximum speed50 mph (80.5 km/h) with multiple units
Weight67,000 lb (30,391 kg)[1] empty
Traction systemGarrett AiResearch chopper control[2]
Traction motors2x Garrett AiResearch 210 hp (157 kW), 152 kV, 280 V, 600 A DC motor, 1 per truck[2]
Acceleration3.1 mi/h/s (1.4 m/s/s)[1]
UIC classificationBo’2Bo’
AAR wheel arrangementB-2-B
Braking system(s)Air/Hydraulic NY Air Brake
Track gauge4 ft 8+12 in (1,435 mm) standard gauge

The US Standard Light Rail Vehicle (SLRV) was a light rail vehicle (LRV) built by Boeing Vertol in the 1970s. The Urban Mass Transportation Administration (UMTA) of the United States Department of Transportation (USDOT) promoted it as a standardized vehicle for U.S. cities. Part of a series of defense conversion projects in the waning days of the Vietnam War, the SLRV was seen as both a replacement for older PCC streetcars in many cities and as a catalyst for cities to construct new light rail systems. The US SLRV was marketed as and is popularly known as the Boeing LRV or SLRV, and should not be confused with their prior lunar roving vehicles for NASA.

The SLRV was purchased by the public transportation operators of Boston and San Francisco. In service by 1976, the US SLRV proved to be unreliable and scrapping started as early as 1987, but the SLRVs were not completely replaced on both systems until 2007. Although the SLRV itself was not successful due to poor reliability, it did set the general size and configuration for succeeding LRVs in the United States.

History

[edit]

Origin

[edit]
MBTA #3400 Type 6 wooden mockup from 1968, stored at Seashore Trolley Museum (2017)

The original concept of the SLRV came to fruition in the late 1960s as the limited number of cities with PCCs in North America were looking for modern replacements for their aging rolling stock; the last PCC had been manufactured in 1952.[3] In 1968, the MBTA in Boston, one operator of PCC streetcars, created a mockup for one end of a proposed "Type 6" streetcar out of wood; the Type 6 program was discontinued after MBTA decided the cost to produce it was too high.[4] Meanwhile, Muni in San Francisco, released a request for proposals in 1971 to purchase 78 new cars, designed by the rail transit engineering firm Louis T. Klauder and Associates (LTK), to replace their aging PCC fleet.[5] The new cars, which Muni called subway-streetcars, were touted as "specially designed for San Francisco, adaptable to both subway and surface conditions and seating more passengers than the present [PCC] streetcars."[6] Muni received two bids in November 1971, with a low bid price of US$473,000 (equivalent to $3,670,000 in 2024) per car from Boeing.[7]: 95, 220  Both bids were rejected as being excessively costly because potential builders were forced to recoup development costs over a relatively small number of vehicles.[5]

Siemens-Düwag car 601 (DE), 1970 "Hanover" prototype for the Hanover Stadtbahn[8]
Exterior view of the Louis T. Klauder-designed subway-streetcars for San Francisco (1971)
US SLRV at Pueblo for testing (1976). This car bears Muni Landor/"Sunset" livery, the MBTA logo, and Boeing branding on the nose.

Düwag had built a prototype as a demonstrator for the Hanover Stadtbahn in 1970 (Hanover car 601 [DE]); in June 1971 MBTA ordered two more prototype "Hanover" cars, to be partially paid using a grant from UMTA. However, under the Nixon administration's "New Economic Policy" introduced that fall, UMTA was not allowed to fund the grant.[5][9]: 19  That policy, codified as "Buy America" in Title IV of the Surface Transportation Assistance Act of 1978, stated that UMTA could not fund any grants exceeding $500,000 for transit vehicles that were produced outside the United States unless an exception was approved by the Secretary of Transportation.[10] Instead, Boston (MBTA) was directed to join with San Francisco (Muni) and Philadelphia (SEPTA) to design a new streetcar that could meet the needs of all three cities.[11]

In response to the failure to procure the Type 6, Duewag, and LTK/Muni streetcars, UMTA organized the BSF (Boston and San Francisco) Committee to design a standardized light rail car to reduce per-unit costs, using the same concept under which the earlier PCC streetcars were designed.[5] The Standard Light Rail Vehicle (SLRV) specification was developed by UMTA based on the 1971 LTK design for Muni in conjunction with potential operators (who were all currently operating PCCs) in Boston, San Francisco, Philadelphia (SEPTA), Cleveland (Shaker Heights), Pittsburgh (Port Authority), New Jersey, El Paso (City Lines), and Toronto (TTC) as well as industry consultants at Parsons Brinckerhoff and Louis T. Klauder and Associates.[1][5] At the same time, a flood of defense conversion projects came to fruition as the result of government encouragement to help keep defense suppliers busy as the Vietnam War was coming to an end.[12]

Contracts awarded

[edit]

UMTA awarded a grant for US$33,000,000 to MBTA on October 20, 1972, towards the purchase of 150 SLRVs. On April 23, 1973, MBTA signed a contract with Boeing Vertol for the 150 SLRVs.[9]: 6  On May 1, 1973, UMTA awarded Boeing-Vertol of Philadelphia, Pennsylvania the contract to produce the SLRV[13] at a cost of approximately $300,000 per car, US$316,616 (equivalent to $2,380,000 in 2024) each for the Muni configuration and US$293,422 (equivalent to $2,210,000 in 2024) each for the MBTA configuration.[5][14] Muni initially ordered 80 cars and the MBTA ordered 150, and production commenced the same day the contract was awarded[12] at a combined cost of US$69,000,000 (equivalent to $488,700,000 in 2024).[15] MBTA was scheduled to receive its first SLRV for testing in February 1975, and the majority of its cars in 1976.[16] The MBTA portion of the contract cost US$44,000,000 (equivalent to $311,700,000 in 2024) for 150 cars; MBTA later increased the order to 175 cars,[17] adding an additional US$7,600,000 (equivalent to $48,460,000 in 2024) to their total cost (MUNI had likewise increased their order from 80 to 100 cars at that time),[11] of which UMTA awarded MBTA US$7,000,000 (equivalent to $44,630,000 in 2024) on June 10, 1974.[9]: 6  The SLRV was the first American-built trolley since 1952.[18]

In late 1974, the first new SLRV was operated on a short test track at the Boeing plant.[5] The first demonstrator model was produced in 1975 and was intended to be an early Muni car,[14] and ran tests in Boston for 11 weeks.[19] Three cars (two in the Muni configuration, and one in the MBTA configuration) were shipped to the Transportation Test Center in Pueblo, Colorado in fall 1975[19] under a contract awarded to Boeing Vertol for engineering testing.[1] MBTA received its first car for testing in September 1976,[9]: 6  two years behind schedule.[11] This first car was delivered with trolley poles in addition to the pantograph, as the MBTA was still in the process of reconfiguring its overhead lines to accommodate the latter.

Operators

[edit]
US SLRVs in service with the only two operators: MBTA and Muni
MBTA #3466 at Hawes Street stop (1987)
Muni #1306 forming part of a two-car train in the Market Street subway, in San Francisco (1993)

The first four SLRVs (3415, 3416, 3418, and 3421) entered revenue service on December 30, 1976, on the MBTA's Green Line D branch.[11][20] However, revenue service with the SLRVs was suspended on April 16, 1977, due to numerous derailments, with 31 SLRVs delivered at that point.[9]: 19  In San Francisco, the first two SLRVs were delivered in October 1977, and as with Boston's first car, these cars featured trolley poles as conversion to pantograph collection was not yet complete. Production models were delivered starting in December 1978, these cars having only pantographs, at which time the two pilot cars were returned to Boeing, and later re-delivered without the poles.[21] The first regular runs on the Muni system came on April 23, 1979, on a temporary shuttle service, with more extensive use beginning with the opening of the Muni Metro on February 18, 1980.[22][23]: 56–57 

Because the layout of Muni had several branch lines converging into the Twin Peaks Tunnel at West Portal and more lines merging near Church, Muni SLRVs were intended to couple into consists of up to a four cars as they entered the tunnel and underground portions of the route; as they exited, they would uncouple to continue on their assigned lines.[19] However, due to slow door cycling and a 3-second delay between the operator signal and actual brake release, the Muni SLRVs proved to be slower than the PCCs in surface operation, and Muni was unable to meet the planned 4-minute headways on individual lines that would allow 2-minute headways with coupled trains underground. In addition, trains could not be turned around to meet 2-minute headways at the terminal Embarcadero Station.[24] A new 6.5-acre (2.6 ha) Muni Metro Rail Center (later renamed the Curtis E. Green Light Rail Center) was constructed for storage and maintenance near the Balboa Park station[19] after Muni decided to purchase the cars the MBTA had rejected.[25]

The Greater Cleveland Regional Transit Authority tested MBTA car #3401 on former interurban lines in mid-1976, but ultimately declined to purchase the US SLRV, instead buying custom LRVs of a different design from Breda Costruzioni Ferroviarie.[26] When Cleveland released a request for quote in September 1977, Boeing Vertol bid US$869,492 (equivalent to $4,500,000 in 2024) per SLRV, exceeding Breda's winning bid of US$645,833 (equivalent to $3,400,000 in 2024) per car.[7]: 221 [13][27] Ironically, Breda would later construct light rail cars that would replace the SLRV's in both San Francisco and Boston (see Replacements and retirement section). SEPTA of Philadelphia, Pennsylvania was initially interested (especially because the SLRV would be locally produced), but purchased custom LRVs from Kawasaki because the US SLRV would not clear the City Hall loop.[26] SEPTA tailored the bid by specifying the vehicle width to be 4 in (102 mm) narrower than the SLRV specification to exclude it from consideration.[7]: 95  The Kawasaki cars for SEPTA were assembled at the Boeing Vertol plant to meet "Buy America" requirements.[28]

While Pittsburgh, New Orleans, and Newark collaborated with UMTA in designing the SLRV[citation needed], and already had traditional streetcars, they ultimately did not buy the cars, nor would any newly built light rail systems such as San Diego. Pittsburgh converted their legacy low-entry streetcar system into dual-entry light rail, in a similar fashion to San Francisco's Muni Metro, and bought (at the time) custom Siemens SD-400 light rail cars, these being derived from the Siemens–Duewag U2 design originally built for the Frankfurt U-Bahn and later adapted for the newly built light rail systems in San Diego, Edmonton, and Calgary. Newark would continue to operate PCC's until 2001, when they were replaced with new low-floor LRV's built by Kinki Sharyo vehicles.[29] New Orleans, which had never adopted the PCC design, continues to operate its 1920's vintage Perley Thomas-built streetcars, supplemented by modern custom-built replicas. All subsequent newly built light rail systems have likewise bought customized equipment from Siemens, Kinki Sharyo, Breda, and other builders that have since entered the US light rail market.

The US SLRV design also influenced the early design of the Canadian Light Rail Vehicle.[26]

Operator Year Built Fleet Series Quantity Year of retirement Notes
MBTA
1976–78 3400–3534 144 1987–2007 3417, 3448, and 3453 were converted to maintenance of way equipment. 3424 was sent to Seashore Trolley Museum in 2009.[30]
1977[citation needed] 3535–3543 Part of the initially rejected option of 40; 31 of these were later delivered to Muni and 9 were delivered to MBTA in 1983. 3541 was sent to the U.S. Army in 2000.[30]
Muni (LRV1)
1978 1200–1299 131 1996–2001 Two prototype cars were delivered in October 1977, numbered 1220–1221; they were later renumbered 1212–1213.[31][32] 1222 and 1252 were damaged during subway testing on Nov 12, 1979; these cars were scrapped for parts, which were used to finish ex-MBTA 3565, renumbered to Muni 1252 (II) and delivered on Jan 27, 1982.[25] 1212 wrecked into 1255 at the Van Ness junction in the Muni Metro subway in 1987. The good halves were converted into a new 1255 and the bad halves were scrapped in February 1994.
1977[citation needed] 1300–1329 31 cars in total. The first car from the rejected MBTA lot (ex-3565) was procured to replace two wrecked cars from the original order of 100 and reassigned number 1252.[25] The other 30 ex-MBTA cars were numbered 1300–1329 and entered service in 1981–1984.

Issues

[edit]

They work, but they just don't work as well as they should. Practically every part in the car is a brand new design. Everyone said the technology would work, but it hasn't.

Kenneth Campbell, MBTA, 1978 interview[33]

Before they were delivered, Boeing claimed the US SLRV would be reliable and virtually maintenance-free.[18] From their earliest days of service, however, the SLRVs proved to be very mechanically and financially taxing. After the initial three months of service, the MBTA was forced to halt all light rail service on April 16, 1977, for nine or ten days due to equipment unavailability.[9]: 19 [11] The MBTA was unable to retire their PCCs; instead, MBTA instituted a PCC rebuilding program to augment the SLRV fleet and maintain Green Line service. In San Francisco, the problems with the SLRVs led to the Muni Metro not reaching its full potential until 1982.[14][17]

According to the original design specification, the goals for mean time between failures were set at 1,400 hours or 21,000 miles (34,000 km) for the propulsion and auxiliary electric systems, which assumes average operating speeds of 15 miles per hour (24 km/h); 1,500 hours or 22,500 miles (36,200 km) for door and step systems; and 4,000 hours or 60,000 miles (97,000 km) for the friction brakes.[34]: 2–19  In comparison, for 1982, Muni SLRVs were breaking down an average of every 600 miles (970 km) (40 hours at 15 mph (24 km/h) operating speeds); reliability rose to 1,800 to 2,000 mi (2,900 to 3,200 km) (120–133 hours) between failures by 1988, but this was still a failure rate almost 15 times the frequency of the 28,300 miles (45,500 km) (1,890 hours) MTBF for the Siemens–Duewag U2 used in the San Diego Trolley system.[14]

Interior of Muni car, looking towards end from near articulated section. Note resilient seating.

In Boston, the MBTA was accepting new cars from Boeing-Vertol, but the cars were falling out of service faster than the MBTA's maintenance staff could repair them. In addition, the MBTA could not acquire replacement parts fast enough to repair the disabled SLRVs. In a desperate effort to keep as many SLRVs operating as possible, MBTA set aside 35 disabled cars to be cannibalized for replacement parts.[33]

To help prevent the riding public from seeing the number of brand-new, but heavily cannibalized SLRVs, several of the cars were hidden around the system where the public was not likely to find them. A major newspaper story emerged when a reporter and a photographer managed to get into a section of the Green Line's subway which was not in use at the time and found it was full of cannibalized cars which had been abandoned in the tunnel.[citation needed] The MBTA had been towing the cars into the subway during the middle of the night when the subway was closed to the public. The story and photographs brought the problems with the SLRV into the public eye for the first time. After the story broke, out-of-service SLRVs began to appear in several storage yards which were easily viewed by the public, though this may have simply been due to the ever-increasing number of disabled cars.[citation needed]

MBTA purchased $2.2 million in spare parts in May 1978 to alleviate further issues, and Muni purchased $1.5 million in parts, forewarned by the MBTA experience. Muni also requested to add 200 employees in order to maintain and run the new SLRVs.[33] Shipments of US SLRVs to MBTA were suspended in June 1978 after 135 cars had been delivered due to ongoing issues,[11] and MBTA prepared the 35 cannibalized cars for return to Boeing later that year.[33] On October 9, 1978, MBTA rejected the final 40 SLRVs and directed Boeing-Vertol to retrieve the 35 cannibalized cars, concluding that poor fleet reliability meant that Boeing was in breach of warranty.[9]: 6, 19  By 1978, the first five cars had been delivered to Muni; those had already underwent three rounds of modifications based on the MBTA experience.[33]

Settlement

[edit]

On December 15, 1978, MBTA and Boeing signed an agreement that revised specifications to enable the full delivery of 175 SLRVs,[9]: 20  but reliability issues continued through 1979. An independent commission recommended that MBTA reorganize its LRV program and take quick action to resolve those issues.[9]: 6  The SLRV fleet availability typically was less than 50% of the total number of cars on the property for the first few years of service; during the second and third quarters of 1979, Green Line trains missed 12,201 weekday trips, a 184% increase over the 6,598 missed weekday trips over the same period in 1978.[11] In May 1979, MBTA and Boeing signed an agreement to modify and refurbish the 35 cannibalized SLRVs,[9]: 20  but MBTA maintenance workers threatened to strike after MBTA ordered Boeing to retrieve the SLRVs, demanding the work be conducted in MBTA shops; Boeing stated in July that it would not accept any more SLRVs from Boston (three had already been returned) until the labor dispute had been resolved.[9]: 6, 20  MBTA, Muni, and Boeing began to meet during the summer of 1979 to determine who would be responsible for resolving the identified problems.[13] Boeing made an offer in September 1979 which identified specific design issues that would be corrected at its expense, including leaking gearboxes, air conditioning compressor issues, and traction motor failures, but MBTA rejected the offer; around this time, MBTA hired product liability attorney and law professor William Schwartz to negotiate on its behalf[13][35] in August 1979.[9]: 7, 21 

Boeing took the position that issues had been caused by poor maintenance, poor track conditions, driver errors, and cannibalization.[9]: 33  Schwartz argued that availability of the SLRV was less than 90% and had cost MBTA between $75–100 million to that point.[9]: 39  On November 19, 1979, MBTA and Boeing reached a settlement; in order to make up for financial losses due to equipment unavailability, Boeing-Vertol would return $40 million to MBTA for the cost of repairs and modifications to several cars. In addition, the MBTA was allowed to reject delivery of the 40 cars remaining from the amended 175-car order.[13][14] At the time of the settlement, 41 of MBTA's 135 SLRVs were inoperable due to design issues, accidents, and/or cannibalization for parts, which would require an estimated US$15,600,000 (equivalent to $67,590,000 in 2024) to restore to operating condition.[13] Under the terms of the settlement, all warranties were terminated, and any further repairs would be the responsibility of MBTA, not Boeing, although Boeing would deliver modification kits to MBTA, whose maintenance personnel would install them at MBTA's expense to correct the previously identified issues. Boeing would only warranty the kits for defects in the parts; if they did not resolve the issues, MBTA would be responsible for the cost of redesign as well.[13] The size of Schwartz's fee for negotiating the settlement, US$799,000 (equivalent to $3,462,000 in 2024), prompted an investigation by the Massachusetts legislature.[9]

Final deliveries

[edit]

The 40 rejected MBTA cars sat in storage at Boeing-Vertol's plant for a short time, until San Francisco's Muni purchased some of these cars at a steep discount. The first of the "Boston" cars which Muni purchased was to replace two SLRVs which had been damaged during preservice Muni Metro subway testing in 1979 and were deemed beyond economic repair.[25] After the successful conversion of that first car, Muni ordered an additional 30 SLRVs from the rejected Boston units to further bolster their fleet. The "Boston" cars in San Francisco were modified to meet the needs of the Muni Metro, but were easily distinguished by the wood grain interior finish at the operator's cab and articulation section,[36] which did not match the yellowish orange color (from the Walter Landor-designed "sunset" livery) on the cars delivered under the original Muni order of 100.[37]

By 1980, Boeing was no longer marketing the SLRV.[7]: 107 [28] In 1983 the last SLRVs at Boeing-Vertol's facility were delivered when the MBTA accepted nine remaining cars (3535–3543) from the group of 40 that MBTA had previously rejected. MBTA also took delivery of five cannibalized "shells" in 1983; these had been delivered to MBTA in the 1970s, but were subsequently returned to Boeing in 1979.[30] The title for these five cars reverted to Boeing because MBTA did not respond promptly under the terms of the 1979 settlement, and had been scrapped to supply parts in the meantime.[9]: 9  The five "shells" were scrapped in 1988.[30]

SLRV compared to key competitors[38]: 136 
  Boeing
SLRV
Düwag U2 PCC CLRV Buffalo
LRV[39]
Axles/
articulation
6/1 6/1 4/0 4/0 4/0
Length 71.5 ft
21.8 m
75.5 ft
23.0 m
43.5 to 50.5 ft
13.3 to 15.4 m
50.67 ft
15.44 m
66.8 ft
20.4 m
Width 8.85 ft
2.70 m
8.70 ft
2.65 m
8.33 to 9.0 ft
2.54 to 2.74 m
8.50 ft
2.59 m
8.58 ft
2.62 m
Height 11.5 ft
3.5 m
10.8 ft
3.3 m
10.1 ft
3.1 m
11.0 ft
3.4 m
12.3 ft
3.7 m
Floor
height
2.82 ft
0.86 m
3.18 ft
0.97 m
2.75 ft
0.84 m
3.02 ft
0.92 m
3.07 ft
0.94 m
Weight
(empty)
68,000 lb
31,000 kg
66,000 lb
30,000 kg
33,000 to 42,000 lb
15,000 to 19,000 kg
52,000 lb
24,000 kg
70,000 lb
32,000 kg
Seats up to 68 64 49 to 69 42 or 47 51
Minimum
curve radius
32 to 42 ft
9.8 to 12.8 m
82 ft
25 m
approx. 40 ft
12 m
38 ft
12 m
unk.
Acceleration 4.1 ft/s2
1.2 m/s2
3.3 ft/s2
1.0 m/s2
4.6 ft/s2
1.4 m/s2
4.6 ft/s2
1.4 m/s2
4.2 ft/s2
1.3 m/s2
Deceleration 5.1 ft/s2
1.6 m/s2
3.9 ft/s2
1.2 m/s2
4.6 ft/s2
1.4 m/s2
5.1 ft/s2
1.6 m/s2
4.4 ft/s2
1.3 m/s2
Emergency
deceleration
8.8 ft/s2
2.7 m/s2
10 ft/s2
3.0 m/s2
9.5 ft/s2
2.9 m/s2
10 ft/s2
3.0 m/s2
6.4 ft/s2
2.0 m/s2

Design

[edit]
SLRV outline and dimensions

The SLRV is a double-ended high-floor articulated light rail vehicle 71 ft (22 m) long overall (over the anticlimbers), in the same range as many heavy rail vehicles both at the time and now, but noticeably shorter than many other modern LRVs such as the at-minimum-81-foot (25 m) Siemens S70 and S700 commonly found today, which rides on three two-axle trucks (six axles in total). The two end trucks are spaced 13 ft 6 in (4.11 m) from each end (couplers included) and 23 ft (7.0 m) from the center truck under the articulated section, allowing a minimum track radius of 32 ft (9.8 m).[1] The dimensions of the SLRV were determined by the existing track constraints of three proposed operators: MBTA (Boston), Muni (San Francisco), and SEPTA (Philadelphia).[38]: 144  Each car has an "A" and "B" end separated by a central articulated section. Each side has three passenger doors 53 in (1,300 mm) wide: one near the operator's cab, and two straddling the articulated section; there is no door at the rear (trailing) cab (in the direction of travel).[1] The tested empty weight of the vehicle (including 1,770 lb (800 kg) of instrumentation) was 69,130 lb (31,360 kg); for a normal load of 100 passengers, the vehicle was 82,500 lb (37,400 kg) and for the crush load of 219 passengers, the vehicle was 104,495 lb (47,398 kg).[1]

Each end truck carries a single DC motor which powers both axles and has a rated output of 210 hp (160 kW) at 1135 RPM, operating on 285 VDC; the traction motor drives the wheels through a reduction gear set of 5.571:1.[1] In the original 1971 LTK design for Muni, the center truck was also powered, giving a top speed of 65 mph (105 km/h);[7]: 220  in the final SLRV specification, the center truck was not powered and the top speed was reduced to 50 mph (80 km/h).[1] Power to the traction motors is controlled through a solid state "chopper" circuit operating at a frequency ranging between 0 to 400 Hz for vehicle speeds up to 17 mph (27 km/h), allowing a continuously variable control of power from the 600 V overhead lines rather than the traditional trolley control at the time, which used a varied number of discrete resistances to control motor current.[18][38]: 134  Above 17 mph (27 km/h), the power is not "chopped" and is instead applied directly to the traction motors.[19]

Primary dynamic braking is accomplished by running the traction motors as generators and dissipating the electricity generated through two brake resistor grids; a friction brake consisting of a single inboard disc brake per axle is blended with the dynamic braking as needed. The friction brake alone is sufficient to hold a fully loaded SLRV (with 219 passengers) on a 9° slope.[1] In addition, six electromagnetic track brakes are provided; on the Muni cars, the track brakes are controlled independently to hold the car in place when starting on a slope, and on the MBTA cars, the track brakes are blended into the main brakes.[1] Dynamic braking was enabled by using a separate power source to energize the field coils on the traction motors; Boeing stated that regenerative braking was possible. Although regenerative braking was not implemented on the SLRV, it was enabled on the similar CLRV.[18]

MBTA #3424 at Seashore Trolley Museum (2017), as rebuilt in 1997 to add roof-mounted air conditioning units on each end and bifold doors (3 per side).

The articulated section allows up to 16° of rotation in the horizontal plane, 3° of vertical sag (center section lower than ends), and 4.3° of vertical crest (center section higher than ends),[5] which permits the SLRV to traverse curves as sharp as 42 ft (13 m) inside radius, travel through valleys with a vertical curvature of 460 ft (140 m), and crest hills with a vertical curvature of 310 ft (94 m).[40]

The SLRV rolls on lightweight Acousta Flex composite resilient wheels 26 in (660 mm) in diameter; these wheels use aluminum hubs separated from the steel rims/tires by a silicone rubber cushion.[1][41] The cushion is 316 in (4.8 mm) thick and is injected in the threaded space between the rim and hub; the design was developed by Standard Steel and BART in the 1960s.[42]: 111  The resilient wheels reduce squeal when negotiating tight curves.[1] Interior noise was claimed to be 65 dB. The design of the trucks is adapted from the Japanese Shinkansen trains.[18] The trucks are equipped with rubber chevron springs and pneumatic suspension, which automatically adjusts to maintain floor height with varying loads. Damping is accomplished by both hydraulic (lateral) and pneumatic (vertical) means.[1]

Buffalo Metro Rail LRV by Tokyu (1988)

The car body shells and truck frames were built by Tokyu Car Corporation in Yokohama and the motors provided by Garrett, with assembly at the Boeing plant in Ridley Park, Pennsylvania. After production was ended by Boeing, Tokyu Car Corporation built light rail cars for Buffalo Metro Rail which externally resemble the SLRV, but many differences, most noticeably the lack of articulation, use of external steps for low-platform boarding instead of internal steps, and the use of single-leaf pocket doors similar to the London Underground D Stock.[39]

Differences

[edit]
SLRV differences[1]: 1–5 
  MBTA Muni
Seats 52[a] 68
Cab Signalling No Yes
Steps Fixed[b] Convertible[c][d]
Overspeed Control Yes[e] No
Destination Signs Manual Automatic
Air Conditioning Yes[f] No[g]
Track brakes Blended Independent
Wheel Tread Contour 1:40 1:20
Notes
  1. ^ Later reduced to 48
  2. ^ Allows street level boarding
  3. ^ Convertible steps on the four center doors only
  4. ^ Allows boarding from high platforms and at street level
  5. ^ 52 mph (84 km/h) limit
  6. ^ Single blower speed
  7. ^ Three blower speeds

While Boston and San Francisco bought their cars at the same time and they appear identical externally, the cars have differences:

  • Doors: The doors themselves, at first, were essentially the same. However, Muni's cars had moveable steps at the four center doors (those nearest the articulated section), which could be lowered for street-level boarding or raised for boarding from high-level platforms, such as those in the subway. The Boston cars did not have this feature and so must be boarded from street-level. The doors were designed to accommodate both types of stairs.[19] These doors proved troublesome and the MBTA eventually replaced them with bi-folding doors, further distinguishing them from Muni's.
  • Appliances: The MBTA SLRVs were fitted with air-conditioning units for Boston's humid climate. Due to San Francisco's relatively mild climate, the Muni SLRVs were provided with forced-air ventilation instead of air conditioning. The air conditioning units that the Boston cars were delivered with had problems such as sucking up dust and other debris from the subway tunnels and were later replaced with roof-mounted Sutrak air conditioners in the late-1980s to mid-1990s.
  • Interior styling: The "Boston" cars featured wood grain interior finishes at the operator's cab and articulation section, while Muni cars had a yellowish-orange color interior. However, certain Muni SLRVs (numbered 1252 and 13xx) actually had the same wood grain interior finish as Boston's because those cars were originally built for Boston, who rejected and returned them to Boeing. Muni then bought these cars, had their air-conditioners removed and fitted them with all the features exclusive to its fleet. The wood grain in these cars is thus the only feature that distinguishes these cars from those originally made for Muni.
  • Automation: Muni cars were equipped with cab signaling to enable automated operation through the Market Street subway with planned headways as low as 60 seconds.[40]
  • Seating: The San Francisco cars originally had cushioned seats, but they were replaced with hard plastic seats in 1985, because of vandalism.[43]
  • Capacity: San Francisco's cars seated 68, while the Boston cars seated 52 until the MBTA later had four seats removed to better accommodate wheelchairs.
Boeing Vertol US SLRV #3523 in service for the MBTA on the Green Line C branch, bound for Cleveland Circle, in 2005. This view shows the roof-mounted air-conditioning units and bi-fold doors added by MBTA in place of the original equipment. MBTA's last Boeing cars were retired in March 2007.

Problems

[edit]

One of the largest issues was simply that the Boeing SLRV was a "compromise" car. Both Boston and San Francisco had very different needs for the SLRV: Boston needing a more traditional streetcar, while San Francisco needed a more specialized car for its Muni Metro subway.[14] Because the San Francisco cars would use station platforms at both street level (surface stations) and high level (underground), the vehicle steps needed to switch between the two modes. This became a passenger flow problem since the Muni cars could only use the two center doors on the SLRVs in the subway: the front end of the car curved away from the high-level platforms too much to allow passengers to safely board or alight the cars.[44] The narrow front end, in turn, was required by Boston so the SLRV could navigate the tight curves in the MBTA's 1897-vintage subway.

Professor Seymour Melman partially blamed the use of a longtime defense contractor. Boeing Vertol's customary client (US Department of Defense) was relatively budget insensitive, more tolerant of cost overruns, and had sufficient funding and workforce to conduct complex maintenance, all contrary to the needs and abilities of a municipal transit agency.[45] The design team primarily had experience in aerospace design, not rail vehicles,[46] did not make a serious effort to gain that experience, and did not design for ease of maintenance. In some cases, portions of the SLRV had to be disassembled by acetylene torch to access components.[45]

Boeing marketed the SLRV as a system and took the role of an integrator, subcontracting the design and fabrication of major components to external suppliers from places as far as Germany, Japan, and the United Kingdom. This approach created uncertainty in component delivery dates and essentially precluded prototype testing in favor of meeting contracted schedule milestones, turning MBTA and Muni into, effectively, beta testers for the SLRV.[45] Because no prototype testing was conducted prior to vehicle delivery, the appropriate identification and stock levels of spare parts could not be established before delivery, and MBTA was forced to cannibalize SLRVs for parts to maintain fleet availability during the early years of operation.[45]

Other specific problems with the SLRV include but are not limited to:

  • Derailments on tight curves,[11] which would seriously damage the car's articulation section, itself problematic as Boeing designed its own articulated section so as to avoid obtaining a license from overseas builders such as Duewag.[citation needed]
  • Another major problem was the shorting of electrical systems and premature failures in the car's motors and propulsion systems. Boeing used a relatively advanced chopper control system for the cars as insisted by the federal government. While such systems have been implemented successfully in many subway, light rail and trolley bus systems, the systems installed in Boeing's cars were found to be overly complicated for the transit systems' use.[citation needed] It is however unclear how problematic this was as chopper control did prove to be commonplace in the United States into the early 1990s.
  • The SLRVs came equipped with overly complex plug doors, which were originally intended to accommodate high-platform operation for Muni in the Market Street subway. Boeing established a requirement to have the doors automatically reopen if an obstruction was encountered while closing in order to avoid crushing passengers;[38]: 146  the firm initially charged with designing the doors successfully met this requirement, but made the doors too sensitive: the doors would recycle upon closing, as it detected a normal closure as an obstruction and would recycle the doors. Boeing hired another subcontractor to redesign the doors, stipulating that fewer components should be used.[45] These doors would frequently short circuit and caused a significant nuisance for the MBTA. The transit agency later attempted to correct the issues with the plug doors by adding a wider rubber strip and eliminating the recycling circuit, but the issue was not fully resolved until the mid-1990s, when MBTA retrofitted all Boeings with much more reliable bi-fold doors.[17]
  • The corrosion of car shells was another major issue. Cars are constructed primarily of low-alloy, high-tensile steel except for a stainless steel roof panel.[5] Both Boston and San Francisco are oceanside port cities, making the cars particularly susceptible to damage from sea spray. Some cars barely saw a decade of service before being withdrawn due to corroded bodies, as their bodies were shipped from Japan as deck cargo through the Panama Canal and spent a further amount of time sitting outside the Boeing plant near Philadelphia before being assembled and delivered.[citation needed]
  • The blended braking system incorporating a single mechanical disk brake on each axle with the resistive brake on the powered trucks was labor-intensive to maintain and unreliable. For the succeeding Type 7 cars delivered by Kinki Sharyo, MBTA chose to use a mechanical-only pneumatic braking system.[47]
  • The Boston cars' air-conditioning units were originally mounted under the car, and constantly sucked in dirt and debris from under the car. The MBTA later modified 76 SLRVs with roof-mounted air-conditioning units to address this.
  • The Acousta Flex composite resilient wheels that were originally fitted to the SLRV tended to fail in service and during testing; the bond failed between the elastomer and the wheel rim, which led to the wheel coming apart and also eliminated the electrical path to ground, as conductors were used between the wheel hub and rim. The Acousta Flex wheels were out of production by 1981.[48]: 9, 11 

Replacements and retirement

[edit]
Retired Muni Boeing Vertol US SLRV #1264 stored at the Duboce Yard in San Francisco in 2007. This car was scrapped in 2016.

The problems of the SLRV quickly led their purchasers to look for replacements and supplements to their fleet. Despite improvements, the SLRVs were still proving to be problematic throughout the 1980s, and both cities decided that Boeing cars would not be part of the long-term future of either transit system. The Federal Transportation Administration took an unprecedented step and reduced the economic life of the Boeing SLRV to 15 years[49] (from "at least 25 years" for trolleys procured using federal assistance),[50] allowing MBTA and Muni to retire the SLRVs early and pursue procurement of replacements by the late 1980s and early 1990s.

Although the SLRV itself was beset by reliability issues and was not successful, Gregory Thompson credits it with making cities aware of light rail transit and defining a modern light rail vehicle.[51] The successor vehicles in Boston (Kinki Sharyo Type 7) and San Francisco (Breda LRV2/3) closely follow the specifications and performance of the SLRV.

SLRV and successors
  Boeing SLRV[38]: 136  Kinki Sharyo Type 7 (MBTA)[52] Breda LRV2/3 (Muni)[53]
Axles/
articulation
6/1
L×W×H[a] 73 ft × 8.85 ft × 11.5 ft
22.25 m × 2.70 m × 3.51 m
74 ft × 8.67 ft × 11.83 ft
22.56 m × 2.64 m × 3.61 m
75 ft × 9 ft × 11.5 ft
22.9 m × 2.7 m × 3.5 m
Floor
height
34 in
860 mm
35 in
890 mm
34 in
860 mm
Weight
(empty)
68,000 lb
31,000 kg
85,000 lb
39,000 kg
79,000 lb
36,000 kg
Motors 2×160 kW (210 hp)
(1 motor/truck)
4×100 kW (130 hp)
(2 motors/truck)
4×97 kW (130 hp)
(2 motors/truck)
Capacity 52/68 seated
219 (crush)
50 seated 60 seated
Minimum
curve radius
32 to 42 ft
9.8 to 12.8 m
42 ft
13 m
45 ft
14 m
Acceleration 4.1 ft/s2
1.2 m/s2
4.1 ft/s2
1.25 m/s2
4.6 ft/s2
1.4 m/s2
Deceleration 5.1 ft/s2
1.6 m/s2
5.1 ft/s2
1.56 m/s2
5.8 ft/s2
1.78 m/s2
Emergency
deceleration
8.8 ft/s2
2.7 m/s2
n/a 8.7 ft/s2
2.66 m/s2
Notes
  1. ^ Length measured over couplers

MBTA

[edit]

After the MBTA terminated their contract with Boeing-Vertol, they were free to make their own modifications to the cars. Several systems were upgraded or improved. Slowly but surely, cannibalized cars were brought into the MBTA shops to be prepped for service.

The MBTA also started "splicing together" damaged cars. Cars 3454 and 3478 had been involved in a high-speed, rear-end collision. The two ends of the cars that made contact were severely damaged. The MBTA's maintenance crews brought the two cars into the shops, and later car 3478 (consisting of 3478A and 3454B) returned to active duty. Car 3454 (consisting of the damaged 3454A and 3478B) was pushed out into the dead storage yard for future disposition. The experience gained in this type of repair laid the ground for several other such cars being returned to revenue service. Eventually, the MBTA's maintenance staff got the active fleet to around 114 cars in the early 1980s.[citation needed]

MBTA No. 3699 (left, Type 7) and No. 3877 (right, Type 8) at Allston Street station (August 2018)

Between 1986 and 1988 MBTA took delivery of new Type 7 light rail cars built by Kinki Sharyo, a Japanese railcar builder[46] well established within its home country, producing its first railcars for the North American market. These cars have proven to be far more reliable and quickly assumed most of the base service on the Green Line. With the introduction of Type 7s, the MBTA was finally able to retire most of its aging PCC cars, which had to remain in service much longer than originally planned due to the unreliability of the Boeings. In order to make room for the new Kinki Sharyo Type 7 cars, Boston's MBTA instituted its first SLRV scrapping program beginning in 1987. By the end of 1988, nineteen cars had been removed from the property, most of which had been in dead storage since the late 1970s and the remainder were victims of major collisions or derailment damage.[citation needed] Kinki Sharyo would subsequently go on to produce LRVs for Dallas, San Jose, Phoenix, Seattle, and Los Angeles.

Boston also turned to Breda for a long-term replacement for the Boeings. While both the Boeings and Type 7 Kinki Sharyo cars have wide door openings and reserved wheelchair spaces that make them compliant with the Americans with Disabilities Act, Boston's proposed Type 8 car would have a portion of its floor lower to the ground, allowing riders using wheelchairs to board without the need for a lift or mini-high platform. To help maintain Green Line service until the Type 8s were expected to be in service and to replace Type 7s destroyed in accidents, the MBTA took delivery of an additional 20 Type 7s from Kinki Sharyo in 1997. Additionally, the MBTA contracted with Amerail (formerly Morrison Knudsen) of Hornell, NY to completely rehabilitate 55 SLRVs in 1996–97 for extended service.[54] The SLRV rehab was intended to add an additional three to five years of service to the cars, and included the elimination of the trouble-plagued plug doors in favor of traditional folding doors, and new roof-mounted air-conditioning units.[55] All of the unrehabilitated MBTA SLRVs were taken out of service after June 27, 1997.[20]

The MBTA was originally expected to have fully retired their SLRVs around 2001. However, the new Type 8s had been prone to derailing and other technical defects, which had significantly delayed their entry into service, and the MBTA nearly suspended the contract; at that point, the 55 rehabilitated SLRVs were still on the active roster, nearly a third of all Green Line rolling stock.[56] By August 2005, MBTA was down to 32 active SLRVs,[57] and more were retired by February 2006.[58] The issues with Type 8 cars were finally resolved in 2006, allowing production and delivery to resume. By early 2007, a sufficient number of Type 8 cars had entered service to allow total retirement of the remaining Boeings. The final revenue service run of the MBTA Boeing cars was made on March 16, 2007,[12] on the Riverside Line by cars 3485 and 3499.[30][59] By late 2007, all Type 8s had been assembled and delivered for service.

Muni

[edit]
Boeing SLRV (LRV1) and Breda LRV2 at Balboa Park station (May 1997)

Muni began developing plans to procure replacements for the Boeing SLRVs in 1989.[49] A contract was signed with Italian manufacturer Breda Costruzioni Ferroviarie on December 4, 1991, with an initial order of 35 cars and options for 20 more.[23]: 70–71  San Francisco began retiring their Boeing SLRVs in 1995 after the first of their replacements (designated LRV2) arrived from Breda. The newer Breda cars are more like what Muni wanted for its Muni Metro back in the early 1970s, before the design of the Boeing SLRV.[17]

At the end of 2001, Muni retired the last of their Boeing SLRVs after the LRV2s had proven to have improved reliability on the Muni Metro system.[17]

In contrast, Breda would not enjoy the same success in North American light rail, producing only the P2550 for Los Angeles and the aforementioned vehicles, and slightly more success with heavy rail, producing vehicles for Los Angeles, 3 generations of vehicles for Washington, and Atlanta.

Disposition

[edit]

Preserved in museums

[edit]
Car 1213 in operation at the Oregon Electric Railway Museum

Three US SLRVs have been saved in museums:

Two others remained stored on Muni property for several years after retirement of the last cars from service, car 1320 at Geneva Division and car 1264 at the streetcar yard at Market and Duboce near the U.S. Mint[62] (but later also moved to Geneva).[63] These two cars remained stored until being scrapped in April 2016.[64] Another ex-Muni car (1271) is used as an office trailer at a Bay Area scrapyard.

The Seashore Trolley Museum had inquired about acquiring MBTA 3444, which was equipped with the plug door, for their collection, but did not take it because the car was not in operating condition and Seashore wanted an operating example. 3444 was missing several essential components, including one of the trucks, and was heavily rusted. 3444 was later scrapped in 2005 and Seashore instead acquired rehabilitated car 3424,[61] which was moved to the museum from MBTA's Riverside Yard on July 9, 2009.

Manchester, UK

[edit]
Muni 1226 stored at Derby Litchurch Lane Works

In 2002, Manchester was the host city of the Commonwealth Games. Many of the venues used for the games were served by the Manchester Metrolink, a regional light rail network which first opened in 1992. With capacity problems foreseen and thus requiring a short term solution, the Greater Manchester Passenger Transport Executive approached Muni about the possibility of buying redundant Boeing SLRVs. Two were purchased for $250 each for initial evaluation and shipped to England.[65][66][67]

Upon arrival in England in January 2002, 1226 was sent to Derby Litchurch Lane Works for assessment by Her Majesty's Railway Inspectorate to ensure it met UK safety standards, while 1326 was delivered directly to Metrolink's Queens Road Depot.[68][69] Muni cars 1214, 1219, 1220, 1221, 1234, 1249, 1268, 1288, 1305, 1308, 1312 and 1327 were stored in the US pending the sale.

Investigations concluded it was not economic to modify them for service in Manchester.[70] The vehicle in Manchester was scrapped once the project was cancelled, while the vehicle in Derby was stored until 2016, at which point it too was broken up.[71]

Working cars

[edit]
Rerailer car #3417 on the MBTA Green Line E branch in 2007

The MBTA owned 3 decommissioned SLRV work cars until 2020, at which time they were scrapped:

  • Rerailer car 3417
  • Track geometry car 3448
  • Maintenance of Way car 3453

Ex-MBTA car 3541 was donated to the United States Army for training in 2000. Ex-MBTA cars 3468, 3480, 3485, 3499, 3514, and 3520 were sold to the US Government and moved to the Transportation Technology Center in Pueblo, Colorado in 2010, for testing with real-life scenarios.[30]

See also

[edit]

References

[edit]
[edit]
Revisions and contributorsEdit on WikipediaRead on Wikipedia
from Grokipedia
The US Standard Light Rail Vehicle (SLRV) was an articulated light rail vehicle designed and manufactured by Boeing Vertol Company in the 1970s under a standardized specification developed in 1972 by the Urban Mass Transportation Administration (UMTA) in collaboration with transit agencies such as the Massachusetts Bay Transportation Authority (MBTA) and the San Francisco Municipal Railway (Muni), aimed at replacing aging streetcars and enabling efficient modern light rail transit systems across U.S. cities. Measuring 73 feet in length, 8 feet 10 inches in width, and 11 feet 6 inches in height, the SLRV featured a lightweight body on three for high- or low-platform loading, with a curb weight of 67,000 pounds, a seated capacity of 68 passengers (Muni) or 52 (MBTA), and a maximum crush-loaded capacity of 219. It was powered by air-cooled DC motors totaling 420 horsepower (one 210-hp motor per end ), enabling a top speed of 50 mph and incorporating dynamic, disc, and magnetic track braking systems for versatile urban operations. Boeing Vertol was awarded the contract in following a competitive bidding process, with production of prototype and demonstration units commencing in 1974 and full-scale manufacturing ramping up by 1975 as part of the UMTA's Urban Rapid Rail Vehicle and Systems Program. A total of 305 vehicles were ultimately produced: 175 for Boston's MBTA Green Line, entering in late 1976 after extensive testing, and 130 for San Francisco's and surface lines, with initial deliveries in 1977 and regular operations starting in 1979. These were the only two transit agencies to procure the SLRV, reflecting its role as a short-lived effort amid a broader push for domestic rail vehicle production in the post-World War II era. Although the SLRV incorporated advanced features like compatibility and modular construction for maintenance efficiency, it faced significant challenges including frequent mechanical failures in propulsion, doors, and suspension systems, exacerbated by the design's compromises for dual surface-subway use. Deliveries to were delayed and partially rejected due to quality issues, with some cars repurposed for at a discount, leading to high operational costs and accelerated retirements—by 2002 in and 2007 in . The program's legacy influenced subsequent specifications, such as the 1981 Light Rail Transit Car Specification Guide, which built on SLRV lessons to promote more flexible and reliable designs.

Development and Production

Origins and Standardization Goals

In the late , the Urban Mass Transportation Administration (UMTA), under the U.S. Department of Transportation, launched initiatives to revitalize amid declining streetcar systems across American cities. Many transit agencies still operated fleets of Presidents' Conference Committee (PCC) streetcars, originally introduced in the 1930s and 1940s, which were becoming increasingly costly to maintain and inefficient for modern urban needs. Supported by federal grants authorized by the Urban Mass Transportation Act of 1964, UMTA sought to promote rail modernization as a cost-effective alternative to bus systems or full , emphasizing vehicles that could integrate with existing infrastructure while meeting contemporary safety and performance standards. A key component of this effort was the push for vehicle standardization to lower costs, simplify , and enhance among transit operators. UMTA established the BSF , involving representatives from and —the two largest remaining streetcar operators—to develop unified specifications for a new vehicle. This approach aimed to avoid the custom designs that had previously driven up expenses and limited parts availability, drawing on proven technologies to create a versatile platform adaptable to various urban environments. The resulting US Standard Light Rail Vehicle (SLRV) concept built directly on a November 1971 design proposal from the (Muni), which outlined an articulated, high-floor configuration suitable for tight urban curves and high-capacity routes. Specific goals included incorporating chopper control systems for improved energy efficiency through precise power management and compared to resistive controls in older PCC cars. Targeted primarily at systems in and , the SLRV was envisioned as a scalable solution to phase out legacy fleets, fostering a national standard for under UMTA oversight.

Contracts and Manufacturing

In 1973, as part of the Urban Mass Transportation Administration's (UMTA) efforts to standardize vehicles across U.S. transit systems, contracts were awarded to Boeing Vertol Company for the production of the US Standard Light Rail Vehicle (SLRV). The (MBTA) signed a contract on May 1 for 175 cars valued at $44 million, while the (Muni) contracted for 100 cars at $25 million, for a combined total of $69 million or approximately $300,000 per car. Boeing Vertol, a of based in , served as the primary manufacturer and assembler of the SLRVs. Production activities, including design finalization and component fabrication, commenced in 1974 at the company's facilities in , leveraging its experience in and transit vehicle engineering. Key production milestones included the completion of the first prototype in 1975, which underwent initial testing to validate the standardized design. Full-scale manufacturing followed, with assembly lines ramping up to meet contract demands; ultimately, Boeing Vertol built 275 units by 1983, fulfilling the combined orders.

Testing and Initial Deliveries

The U.S. Department of Transportation conducted pre-service testing of the US Standard Light Rail Vehicle (SLRV) at the Transportation Test Center in Pueblo, Colorado, from January to June 1976. Three production pilot cars—two in the San Francisco Municipal Railway (Muni) configuration and one in the Massachusetts Bay Transportation Authority (MBTA) configuration—underwent a comprehensive program in accordance with General Specification GSP-064, evaluating performance, power consumption, acceleration, braking, ride quality, noise levels, and radio frequency interference. The tests established baseline data for urban rail vehicles, confirming acceleration rates of 2.78 mph per second under loaded conditions (meeting the 2.8 ± 10% specification) and blended braking deceleration of 3.35–3.85 mph per second (exceeding the 3.5 ± 10% requirement). Slip-slide protection efficiency reached 76.3% to 95% across modes, surpassing design goals, while power consumption averaged 9.81 kWh per car-mile at 575 volts. Although no major structural failures occurred, the trials highlighted minor discrepancies, such as train resistance being approximately 85 pounds higher than estimated at speeds below 20 mph, providing early insights into operational adjustments needed before revenue service. Initial deliveries commenced with the MBTA receiving the first SLRVs in late 1976, following the Boeing Vertol contract awarded in 1973. These vehicles entered on December 30, 1976, on the Line's D Branch, marking the debut of standardized cars in the United States. However, operational rollout was hampered by immediate reliability concerns, including frequent system malfunctions and motor overheating, which fell short of the design target (MTBF) of 21,000 miles. By June 1978, after accepting 135 cars, the MBTA suspended further deliveries due to persistent defects. Under a 1979 settlement, the MBTA was permitted to reject up to 40 vehicles and received funds for repairs; ultimately, it accepted 9 additional cars in 1983 for a total of 144, while the remaining 31 were rejected and later sold to Muni. Muni received its initial SLRVs in late 1977, with testing commencing in early 1978 that included static inspections, system adjustments, and trial runs in the Subway, such as at Embarcadero Station. The vehicles entered service on April 23, 1979, on the J-Church line, introducing operations to San Francisco's surface network. Between 1981 and 1984, Muni incorporated additional cars originally intended for the MBTA, acquired at reduced cost amid the ongoing disputes, expanding its fleet to meet subway and street demands. Early Muni operations mirrored MBTA experiences, with initial MTBF around 600 miles—well below the 21,000-mile goal—due to similar motor and electrical issues that required extensive modifications.

Design and Specifications

Key Features and Components

The US Standard Light Rail Vehicle (SLRV) featured a double-ended articulated , consisting of two bodies connected by a flexible joint to enhance maneuverability on urban tracks while maintaining a configuration for compatibility with existing streetcar infrastructure. This articulated structure allowed for a total length of 71 feet (21.6 m) over body (73 feet/22.3 m over couplers), a width of 8 feet 10.25 inches (2.70 m), and a height of 11 feet 4 inches (3.45 m), with an empty weight of 67,000 pounds (30,400 kg). The vehicle's passenger capacity included 52 to 68 seated positions (52 for MBTA, 68 for Muni) depending on the operator's configuration, supporting a of up to 219 passengers, and it achieved a maximum operating speed of 50 mph (80 km/h). Propulsion was provided by two separately excited DC traction motors (one per end truck in a mono-motor configuration), each rated at 210 horsepower for a total of 420 horsepower, controlled through a solid-state chopper system to optimize energy efficiency and smooth in street-running environments. This chopper control enabled precise power modulation for the 600-volt DC overhead supply, reducing wear on mechanical components and supporting for improved efficiency. The high-floor design integrated the motors within mono-motor , ensuring stability and compatibility with standard gauges. The vehicle used a three- arrangement, with the end powered and the center unpowered. Passenger accommodations emphasized streetcar-like operation with a focus on and flow, including three 53-inch-wide plug-type sliding-step doors per side that adjusted height for platform variations. The interior layout featured transverse bench seating across the saloon, promoting quick boarding and alighting in mixed-traffic settings. Air conditioning was incorporated on MBTA units via a roof-mounted system drawing conditioned air from below the car, while Muni vehicles initially relied on ventilation without full HVAC. Operator-specific variations, such as seating arrangements, were adapted minimally to meet local needs without altering core dimensions.

Operator-Specific Variations

The US Standard Light Rail Vehicle (SLRV) was adapted to meet the unique operational needs of the Massachusetts Bay Transportation Authority (MBTA) in Boston and the San Francisco Municipal Railway (Muni), reflecting differences in infrastructure and service environments. For the MBTA's Green Line, vehicles featured fixed, low-level steps at each passenger door to facilitate street loading along the system's extensive surface and elevated trackage, ensuring compatibility with the existing narrow-profile tunnels and platforms. These fixed steps were a key adaptation for seamless integration with the Green Line's legacy infrastructure, which lacked high-level boarding in many sections. In contrast, Muni's SLRVs incorporated convertible folding steps at four door locations (excluding end doors) to accommodate both high-level platforms in the and low-level street running on surface routes, allowing the steps to deploy or retract as needed for mixed operations. Additionally, Muni vehicles omitted full in favor of ventilation systems, suited to San Francisco's milder climate, while MBTA units included comprehensive to address Boston's variable weather and passenger comfort demands in enclosed tunnels. These HVAC differences stemmed directly from each operator's environmental requirements during the joint 1972 procurement. Further variations included signaling and electrical adjustments tailored to local track conditions. Muni SLRVs were equipped with cab signaling and Automatic Speed Control (ASC) systems to manage varying speed limits in shared subway and segments, enhancing safety on blended rights-of-way. MBTA vehicles, operating primarily on dedicated Line tracks, used a simpler ASC without cab signaling, relying on fixed speed enforcement. Minor electrical tweaks, such as use on production units for both operators (with trolley poles on MBTA's initial pilot cars), and braking adjustments like disconnected automatic sanders on MBTA units to avoid tunnel interference, addressed site-specific signaling and propulsion needs.

Operational Use

Deployment with MBTA

The US Standard Light Rail Vehicles (SLRVs) began on the (MBTA) Green Line on December 30, 1976, initially on the D branch from Riverside to Government Center. However, due to equipment issues, all Green Line service was suspended from April 16 to April 25, 1977, for repairs and inspections. Deliveries had started earlier that year for testing, but widespread implementation across the system's branches—B (), C (Cleveland Circle), D (Riverside), and E (Heath Street)—followed in 1977 as the fleet expanded. By the late 1970s, the MBTA had assembled a peak fleet of approximately 150 SLRVs to accommodate the Green Line's high ridership, which exceeded 200,000 daily passengers during peak periods in the and supported operations through a mix of surface medians, tunnels, and street-level segments. In their operational role, the SLRVs replaced aging Presidents' Conference Committee (PCC) streetcars, transitioning the Green Line from legacy to a more modern configuration suited for both subway tunnels under and dedicated median rights-of-way in outlying areas. Typical runs extended from suburban terminals like Riverside on the D branch to on the E branch, navigating tight curves, steep grades, and high-frequency service demands that characterized the system's 36-mile network. The vehicles operated in married pairs for efficiency, handling peak-hour crowds on routes that connected key neighborhoods in Boston, Brookline, Newton, and . General reliability issues, including frequent mechanical failures and derailments, periodically disrupted service and required supplemental PCC operations to maintain schedules. Replacement efforts began in the mid-1980s with the introduction of 100 Type 7 low-floor vehicles from between 1986 and 1988, which gradually supplanted SLRVs on high-traffic branches. This phase-out accelerated in the late with 95 Type 8 vehicles from AnsaldoBreda entering service starting in 1998, designed for improved and capacity. By early 2007, the remaining SLRVs were confined to lighter duties, with the final revenue run occurring on March 16, 2007, marking the complete retirement of the fleet in favor of the newer Type 7 and Type 8 cars.

Deployment with Muni

The US Standard Light Rail Vehicles (SLRVs), produced by Boeing Vertol, entered revenue service with the (Muni) in , initially operating on surface routes as a shuttle on the K Ingleside line ahead of the full subway opening. This marked the beginning of their integration into Muni's network, with the first cars (numbered 1200–1299) replacing aging PCC streetcars on high-ridership lines. By 1982, following the completion of the , SLRVs began full operations through the underground segment, expanding to the , , M Ocean View, and lines, which converge in the Twin Peaks Tunnel before surfacing. The fleet ultimately grew to 130 vehicles, incorporating 30 additional units (1300–1329) acquired from the MBTA's rejected order to meet demand. SLRVs facilitated Muni's unique mixed-traffic operations, combining subway running in the central Market Street corridor with surface streetcar service on dedicated rights-of-way and shared roadways, adapting to San Francisco's hilly terrain and urban density. On routes like the N Judah and , they navigated steep grades and frequent stops, while in the subway, they provided higher-capacity service linking downtown to residential neighborhoods. Market Street, a key tourist artery, saw SLRVs handling both commuter and visitor traffic, contributing to the system's role in supporting the city's vibrant public transit ecosystem amid growing ridership in the late . The SLRVs remained in frontline service until their phase-out began in the mid-1990s, superseded by more reliable LRV2 vehicles introduced in 1996 to address persistent maintenance challenges. Retirement of the fleet was completed by 2002, with the last cars withdrawn after over two decades of operation that helped modernize Muni's rail infrastructure despite reliability issues.

Performance Challenges

The US Standard Light Rail Vehicle (SLRV) faced significant reliability shortfalls in operation, particularly with the Massachusetts Bay Transportation Authority (MBTA) and San Francisco Municipal Railway (Muni), where actual performance fell far short of design goals despite high development costs. The vehicles' mean time between failures (MTBF) was reported at approximately 600 miles, well below the 21,000-mile target established in the specification to ensure high availability. Frequent mechanical issues included derailments, often linked to the stiff truck design intended for improved ride quality but prone to instability in switches and tight turns, as well as motor burnouts from the complex chopper-controlled propulsion system derived from aerospace technology. Door malfunctions were also common, stemming from the intricate plug door mechanisms that required operator and passenger controls, leading to operational delays and safety concerns. Maintenance burdens were exacerbated by the SLRV's design complexity, resulting in high downtime rates in the early years of deployment for both operators. The aerospace-derived components, such as advanced electronic controls and propulsion elements, demanded specialized repairs that overwhelmed maintenance teams accustomed to simpler PCC-era streetcars. Corrosion accelerated in wet climates like Boston's winter conditions and San Francisco's foggy environment, affecting underbody structures and electrical systems, further increasing repair times and costs. Initial testing had revealed some shortfalls in reliability, but these persisted into service due to limited pre-delivery validation. Systemic factors contributed to these challenges, as the SLRV specification represented a compromise between MBTA's subway-oriented requirements and Muni's street-running needs, leading to over-engineered features that compromised overall consistency. For instance, bidirectional operation doubled door and control complexities, while stringent performance tolerances for acceleration and braking necessitated sophisticated subsystems that proved unreliable in real-world mixed traffic. Operators reported inconsistent performance across routes, with higher failure rates on street segments compared to dedicated rights-of-way, underscoring the difficulties of a one-size-fits-all design for diverse urban environments.

Design and Manufacturing Flaws

The design of the US Standard Light Rail Vehicle (SLRV) represented a significant compromise to satisfy the divergent requirements of the (MBTA) and (Muni). The MBTA needed vehicles compatible with high-level subway platforms and tight curves in its Green Line tunnels, while Muni required low-level boarding for street-running operations and compatibility with its existing infrastructure. This dual-purpose approach led to suboptimal and suspension designs that were neither optimized for subway-grade stability nor street-level durability, resulting in inherent vulnerabilities to track irregularities and load variations. Engineering challenges arose directly from these compromises, manifesting in overly complex door mechanisms and braking systems that were prone to electrical shorting under varying environmental conditions. The articulation joints contributed to instability on uneven tracks. Vertol's manufacturing process compounded these design shortcomings, as the company—primarily experienced in and helicopter production—lacked established expertise in rail vehicle assembly, leading to lapses in . This aviation-centric focus prioritized precision engineering for flight but overlooked the robustness needed for ground transit, resulting in higher defect rates and the need for extensive post-delivery modifications. These flaws collectively undermined the SLRV's reliability from the outset.

Lawsuits and Settlements

The (MBTA) initiated legal action against Boeing Vertol in 1978, citing the LRVs' chronic unreliability, frequent breakdowns, and excessive maintenance requirements that rendered many vehicles inoperable shortly after entering service in 1976. The disputes escalated from MBTA's suspension of deliveries in June 1978 after accepting only 135 of the 175 ordered vehicles, leading to contract termination proceedings. In November 1979, MBTA and reached a settlement resolving the litigation, under which agreed to pay MBTA $40 million to cover repair costs and modifications for the delivered fleet, while granting MBTA the right to reject the remaining 40 undelivered vehicles. The Urban Mass Transportation Administration (UMTA) played a key role by conditionally approving the agreement on November 20, 1979, after reviewing the terms to ensure compliance with federal grant conditions, though UMTA later criticized its own limited oversight of the project. As part of the resolution, pledged an additional $20 million specifically for repairs and spare parts, with MBTA retaining about $3 million in withheld payments for the accepted cars. San Francisco's Municipal Railway (Muni), which had jointly procured the standardized LRVs with MBTA under UMTA funding, acquired 31 of the rejected MBTA vehicles at a substantial discount in 1980 to supplement its own fleet of 100 LRVs. The combined legal and financial fallout from these disputes, including the original $68.3 million contract value and settlement payouts, exceeded $50 million in total costs borne by and federal programs, ultimately prompting Boeing Vertol to exit rail vehicle manufacturing entirely by late 1979. This outcome highlighted UMTA's challenges in enforcing initiatives and influenced stricter guidelines for future transit projects.

Retirement and Replacement

MBTA Phase-Out

The (MBTA) initiated the replacement of its US Standard Light Rail Vehicles (SLRVs) in the mid-1980s, driven by persistent reliability issues that necessitated interim solutions to maintain Green Line operations. In 1986, the MBTA introduced the first of 100 Type 7 cars built by , with deliveries spanning 1986 to 1988; these articulated vehicles provided partial relief by supplementing the problematic SLRVs and improving service reliability on the system's branches. An additional 20 Type 7 cars were added in 1997 to further bolster capacity. By the late , the MBTA shifted to a more comprehensive modernization with the Type 8 low-floor cars from AnsaldoBreda, marking a step toward compliance under the . The first Type 8 cars entered limited revenue service in March 1999, though initial deliveries faced delays and testing challenges; production continued through 2007, enabling the full phase-out of SLRVs. The final SLRV revenue operations ended on March 16, 2007, with cars 3485 and 3499 completing a run on the D branch (Riverside Line). Three SLRVs were repurposed as work equipment cars (3417, 3448, and 3453) and remained in non-revenue use until their retirement and scrapping in 2020. Post-SLRV, the MBTA's Green Line modernization efforts focused on enhancing and capacity, including the introduction of low-floor designs in the Type 8 and subsequent Type 9 cars, raised platforms at key stations, and infrastructure upgrades like signal improvements and track renewals. The ongoing Green Line Program, launched in the 2010s, has targeted barrier removal at over 30 surface-level stops across the B, C, D, and E branches, with projects such as the 2024 federal grant for B and C branch accessibility underscoring the commitment to equitable service in the post-SLRV era.

Muni Phase-Out

Muni initiated the phase-out of its US Standard Light Rail Vehicle (SLRV) fleet in the mid-1990s due to persistent mechanical reliability issues that had plagued the Boeing-built cars since their introduction in 1980. The replacement program centered on acquiring 151 Breda vehicles, with the LRV2 series beginning deliveries in 1995 and entering the following year to gradually supplant the aging SLRVs on both subway and surface routes. The LRV2 fleet expansion continued through 1998, after which the LRV3 series was introduced in the early 2000s, with the final unit delivered in April 2003, enabling the complete retirement of the SLRV fleet. This transition emphasized enhanced vehicle performance for San Francisco's mixed street-running operations, where improved accessibility features—such as better wheelchair securement and ramp deployment—were prioritized to better serve surface lines compared to the SLRV's outdated design. The last SLRV operated in at the end of 2001, marking the end of approximately 22 years of use for the type in , significantly shorter than the anticipated 30-year lifespan due to ongoing maintenance challenges. Following retirement, most of the 130 SLRV units were scrapped between 1996 and the early , though a small number were retained into the mid-2010s at storage yards like Cameron Beach for potential parts salvage before final disposition.

Preservation and Legacy

Museum Preservation

Several US Standard Light Rail Vehicles (SLRVs) have been preserved in museums following their retirements, serving as tangible reminders of the vehicle's troubled history in American urban transit. Three examples stand out: MBTA car 3424, acquired by the Seashore Trolley Museum in Kennebunkport, Maine, in 2009 after its retirement from service; San Francisco Municipal Railway (Muni) car 1258, donated to the Western Railway Museum in Suisun, California, in May 2002; and Muni car 1213, transferred to the Oregon Electric Railway Museum in Brooks, Oregon, in 2000. These donations occurred in the wake of Muni's phase-out of its Boeing-built SLRVs between 2001 and 2002, and the MBTA's ongoing retirements starting in 2006, with many vehicles decommissioned by 2007 due to persistent reliability issues. Preservation efforts have focused on maintaining structural integrity and historical authenticity, with varying levels of restoration: Muni 1213 has been fully restored to operational condition for occasional demonstration runs on the museum's 1.5-mile track, while Muni 1258 is operational at the and MBTA 3424 is held for static display, though both have undergone cosmetic and minor mechanical work to prevent further deterioration. The preserved SLRVs hold significant historical value as artifacts of the Urban Mass Transportation Administration (UMTA) initiative to standardize vehicles across U.S. cities, an effort that ultimately failed due to design flaws, manufacturing defects, and inadequate testing, leading to high maintenance costs and early retirements. These cars exemplify the broader challenges in reviving domestic streetcar production during that era, highlighting the pitfalls of rushed federal standardization programs that prioritized quantity over quality. As of 2025, these remain the only preserved SLRVs, with no additional units saved from scrapping.

Reuse and Scrapping

Following the retirement of the US Standard Light Rail Vehicles (SLRVs) from , a small number were repurposed for non-passenger uses, primarily as maintenance work cars by the (MBTA). The MBTA converted three decommissioned SLRVs—numbers 3417, 3448, and 3453—into work cars for tasks such as rerailing and track inspection, where they remained in limited use until 2020. These vehicles were then auctioned off and subsequently scrapped, as their propulsion systems were beyond repair due to the discontinued parts . An attempt at international reuse involved two SLRVs exported from San Francisco's Municipal Railway (Muni) to the United Kingdom's system in 2002 for evaluation as a potential low-cost fleet supplement. Cars 1226 and 1326 were shipped for testing and modification to fit Metrolink's infrastructure, but the project failed due to high adaptation costs and incompatibility issues, rendering the effort uneconomical. Car 1326 was scrapped on-site in in 2008, while 1226 was relocated to for further assessment before being scrapped in 2015. The vast majority of the SLRV fleet—over 260 vehicles across both Muni and MBTA operations—was dismantled for by the as replacements entered service and storage costs mounted. Muni completed the scrapping of its remaining stored units by 2016, including the final two held at Duboce Yard. By 2025, no SLRVs remain in active or utilitarian service anywhere, with dispositions limited to scrapping or select preservation efforts.

Influence on Modern Light Rail

The experiences with the US Standard Light Rail Vehicle (SLRV) underscored the pitfalls of designing vehicles to accommodate both platforms, resulting in mechanical vulnerabilities that compromised reliability. These compromises, intended to fit existing , contributed to frequent breakdowns and accelerated retirements, prompting transit agencies to prioritize more tailored, accessible designs in subsequent generations. A key lesson from the SLRV era was the emphasis on low-floor configurations to enhance passenger accessibility, aligning with the Americans with Disabilities Act (ADA) of 1990. The first US low-floor vehicles, such as TriMet's Type 2 MAX cars introduced in 1997, eliminated stairs and wayside lifts, enabling level boarding and reducing dwell times—advances that addressed SLRV-era limitations and became standard in 1990s procurements for modular, ADA-compliant systems. The SLRV's operational shortcomings also influenced industry practices, as Boeing Vertol's exit from rail transit following the project's delivery highlighted risks for non-specialized manufacturers. This led the Urban Mass Transportation Administration (UMTA, now ) and (FRA) to refine procurement guidelines, mandating rigorous pre-delivery testing, greater operator involvement, and performance-based specifications to mitigate reliability risks in future bids. Over the long term, the SLRV serves as a cautionary example of overambitious standardization in transit , fostering a preference for diverse, agency-specific fleets over uniform national designs to better match local needs and infrastructure. Modern vehicles, like series, reflect this evolution through enhanced modularity and reliability targets exceeding 59,000 miles between major overhauls.