Hubbry Logo
search
logo
2222932

Don Valley Stadium

logo
Community Hub0 Subscribers
Write something...
Be the first to start a discussion here.
Be the first to start a discussion here.
See all
Don Valley Stadium

Don Valley Stadium, England, was a stadium in Sheffield, South Yorkshire, completed in 1990, and hosted the 1991 World Student Games. It was named after the nearby River Don. The stadium was demolished in 2013.

The stadium and facilities were also used for a variety of other events and sports. It served as a training base for the City of Sheffield Athletic Club and was the home of the Sheffield Half Marathon. It was the home ground of the Sheffield Eagles from 1991 to 2013. Rotherham United F.C. played their home matches at Don Valley between 2008 and 2012 when they were without a ground in Rotherham. American football was staged there and the Channel 4 celebrity sports show The Games also used the stadium.

To save money, Sheffield City Council closed the stadium in 2013. The site has since been sold and redeveloped to include a research centre, sports centre and educational facilities for local universities. At the time of its closure, Don Valley Stadium was the second largest athletics stadium in the UK, with a seated capacity of 25,000.

The whole of the running track and its infield was illuminated by the strongest floodlighting system in the country. Each of the five lighting towers used was 148 feet (45 metres) above track level and carried a lighting head as tall as a typical three storey house (36 feet; 11 metres high). All amenities for competitors and officials were at track level with all spectator facilities at natural ground level. This meant, for example, that disabled spectators had level access from the main car park straight through to the mid-level of spectator seating.

The track was sunk 16 feet (4.9 metres) below ground level and was sheltered by banks of spectator seating, creating a 'bowl effect'. This not only gave ideal viewing conditions but also offered athletes every opportunity of producing peak performances.

This record-breaking philosophy has even had a bearing on the angle at which the track was set and its positioning was relative to the prevailing winds and the rise and fall of the sun. The finishing line was positioned at the east end of the stadium which meant that in the afternoon and evening when most meetings are held the sun would always be at the athletes' backs in the finishing straight, as is the prevailing westerly wind.

VIP facilities were on a third level while the top-most of the four levels was set aside for hospitality boxes and press areas.

The stadium's major focal point was its grandstand which held 10,000 spectators. The main canopy roof had an area of 6,000 square metres and was made of Teflon coated glass fibre. It was supported by ladder masts reaching 39 feet (12 m) above the top of the grandstand, the latter were painted yellow and gave the stadium its unmistakable appearance. They also gave completely uninterrupted sight lines around the bowl although coverage from rain in the bottom half of the stand could be problematic. Underneath the main stand was located an 85 metres (93 yards) indoor running/warm-up track.

See all
User Avatar
No comments yet.